Application for Amend to License SNM-1174,extending Expiration Date of License Through 891231.Fee Paid
ML20151B040
Person / Time
Site: 07001193
Issue date: 01/12/1988
From: Stauter J
SEQUOYAH FUELS CORP.
To: Mallett B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20151B035 List:
References
84725, NUDOCS 8804080024
Download: ML20151B040 (4)


Text

.

.a.

s e

SEQUGYAH FUELS CORPORATION

.m, -.m _. _.-... m. _ _

January 12, 1988

}l,._ gj7p'. - ~_ _ _ _.

'q CERTIFIED MAIL

[-

1 YA-RETURN RECEIPT REQUESTED

,g b [ 4- % T y ]

E3 Mr. Bruce S. Mallett, Chief 5'I Materials Licensing Section

[j Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Re: License SNM-ll74, Docket 70-1193 Request for extension of license expiration date

Dear Mr. Mallet:

Sequoyah Fuels Corporation License SNM-ll74 for the Cimarron Plutonium Facility expires March 31, 1988.

In light of the status of activities at the facility, SFC believes extension of the license expiration date is appropriate to enable final decomissioning and license termination rather than the filing of a license renewal application.

Therefore, SFC requests herein extension of the current license through December 31, 1989.

SFC currently is carrying out decomissioning activities at the Cimarron Plutonium Facility.

As verified by NRC's Inspection report dated December 14, 1987, all equipnent and related process and cuilding systems containing TRU waste concentrations of plutonium have been removed or decontaminated and all TRU waste has been shipped for disposal. The snull anount of waste remaining is low-level, but conplete cleanup will require effort beyond the expiration date of the current license.

Following completion of the cleanup, some additional time will also be required for NRC's review of the license reports and NRC survey and release of the site.

i I

SFC is confident all activities leadin'J to deccmmissioning of the facility and temination of the license can be done by December 31, 1989, and requests extension of the license through that date.

SFC also requests that NRC begin its survey activities in the sumer of 1988.

i R TC E I y g a

~

MM 151933 O I3

  • racro;;n A SUBSOA ArY(V AEnt n0CCEf Coa %ndinCW CONTROL t,'O 8 4 79 5 9804080024 080225 REG 3 LIC70 my"1-JUD2A C

i.-

.e l

'.(

A check for $150 is attached to cover the fee for this adininistrativi action t

requested.

t Sincerely,

.A

__3 i

-I J.C. Stauter, Director Nuclear Licensing & Regulation i

'l JCS:at Enclosure cc:

L.C. Rouse, NRC-NMSS 4

d 6

4 4

l l

l l

l l

l l

i I

(

i

~

t i

Ih k lt i

r < r ;

c SEQU0YAH FUELS CORPORAil0N Pott C8 8ict tos,tasi. Catancesa City cal Awoua F31,5 January 12, 1988 CERTIFIED MAIL RimRN RECEIPT REQUESIED rZ z #l! lf]h Mr. Bruce S. Mallett, Chief Materials Licensing Section jh Region III J

U.S. Nuclear Regulatory Cocmission

,))

I 799 Roosevelt Road S

Glen Ellyn, Illinois 60137 b

Re: License SNM-ll74, Docket 70-1193 Request for extension of license expiration date

'[

Dear Mr. Mallet:

Sequoyah Fuels Corporation License SNM-1174 for the Cimarron Plutonium Facility expires Kirch 31, 1988.

In light of the status of activities at the facility, SFC believes extension of the license expiration date is appropriate to enable final decomissioning and license termination rather than the filing of a license renewal application.

Therefore, SFC requests herein extension of the current license through Decenber 31, 1989.

SK currently is carrying out decomissioning activities at the Cimarron Plutonium Facility.

As verified by NRC's inspection report dated December 14, 1987, all equipnent. and related process and building systems containing TRU waste concentrations of plutonium ha.e been teraoved or decontaminated and all 2RD waste has been shipped for disposal. The small amotrat of waste remaining is low-level, but cocplete cleanup will requtre effort beyond the expiration date of the current li':ense.

Following coupletion of the cleanup, some additional time will also be required for NRC's review of the license reports and NRC survey and release of the site.

SFC is confidect all activities leading to deccanissioning of the facility and termination of the license can be done by December 31, 1989, and requests D

extension of the Mcense through that date.

SFC also requests that NRC begin I

its sur,'ey activities in the sumer of 1988.

l T C'El V E D JAN I S jggg

  1. N 15 #88 p17 5 MGION m o

g6y nmiw-a-mu a n,-

g

i A check for $150 is attached to cover the fee for this e inistrativa action requestM.

Sincerely,

.A j

ii J.C. Stauter, Director Nuclear Licensing & Regulation m!

JCS:at Enclosure cc: