ML20151B039

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-289/88-12 & 50-320/88-09 on 880530-0603 & Notice of Violation.Concern Re Mgt Control Sys Expressed
ML20151B039
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 07/08/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20151B041 List:
References
NUDOCS 8807200214
Download: ML20151B039 (3)


See also: IR 05000289/1988012

Text

-

.

. bh

. .

O

JUL 0 81988

Docket No. 50-289 and 50-320

GPU Nuclear Corporation

ATTN: Mr. F. Standerfer

Director of THI-2

P. O. Box 480

Middletown, Pennsylvania 17057

Gentlemen:

Subject: Combined Inspection Report No. 50-289/88-12 and 50-320/88-09

A routine, unannounced, safety inspection was conducted b three Region I

inspectors, S. Sherbini, J. Gresick, and R. Loesch, on Na 30 - June 3, 1988.

The inspection effort was concentrated on the Unit 2 radi logical controls

program, as well as those elements of the site radiological controls program

that are common to Units 1 and 2.

Within the scope of this inspection, two violations were identified. One

violation involved failure to perform an adequate survey, and the second

violation involved failure to follow procedures. Details are provided in the

enclosed Appendix A and inspection report. You are required to respond to the

violations in accordance with the instructions contained in the enclosed

Appendix A. We are also concerned about your management control system that

allowed frequent incidents to occur that were caused at least in part by lack of

adherence to 3rocedures. You are therefore recuested, in addition to your

response to tie violations described in Ap)encix A, to inform us of the steps

you have taken to improve performance in t11s area.

Your cooperation with us is appreciated.

Sincerely,

0 jnM Signer By:

ftcaald R. Br.tamy

Ronald R. Bellamy, Chief

Facilities Radiological Safety

and Safeguards Branch

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report No. 50-289 /88-12 and 50-320/88-09

I

,

C,i.- r T-m

Ulf s.;,y,"

it'.i~m.h

-

bi.. W it"U D'w'd [n

'

i: y,,

g g:.2

8807200214

PDR 800708ADOCK

PNV 05000209

G

-

.,

.

.. .

.

JUL 0 s 1999

GPU Nuclear Corporation 2

cc w/ encl:

T. F. Demmitt, Deputy Director THI-2

R.E.Rogan,LicensingandNuclearSafetyDirector

J. J. Byrne, Manager TMI-2 Licensing

A. Miller, Manager,klantOperations

J. E. Frew, Defueling Director

J. B. Lieberman, Esquire

Ernest L. Blake, Jr., Esquire

W. Potts, TMI-2 Site Operations Director

THI-Alert (TMIA)

Susguehanna Valley Alliance (SVA)

PDR)

Public

Local Document

Public Document Room (Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Ins)ector

Commonwealth of )ennsylvania

bec w

Region / encl:I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

Michael Masnik, PM, THI-2

Robert J. Bores, DRSS

ST Ss SS

S. Sherbini

f5

M. Sh'anbaky

\W

R. Bellamy

forR.Loesch fmJ.Gresick

6 /16 /% 6/20/ss 6 /IT/S5 7 / 7 /EX 7/ 7 / 8%

u. u

a hit, i ,' 'l Y

.

_-

.

. .

-

JUL 0 8 fggg

GPU Nuclear Corporation 2

cc w/ enc 1:

T. F. Demmitt, Deputy Director THI-2

R. E. Rogan, Licensin

J. J. Byrne, Manager,g TMI-2 Licensing and Nuclear Safety Director

A. Miller, Manager Plant Operations

J.E.Frew,DefuelIngDirector

J. B. Lieberman, Esquire

Ernest L. Blake, Jr., Esquire

W. Potts, THI-2 Site Operations Director

TMI-Alert (TMIA)

Susquehanna Valley Alliance (SVA)

Public Document Room (PDR)

local Public Docuraent Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

Michael Masr.ik, PM, THI-2

Rcbert J. Bores, DRSS

l

[

88%~~;p,,,

UOMin ii[C030 ggpyn

l

l

<

_ . . _ _ _ - . . _ . - _ - - . -- _ _ . _ .