Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132B934 + (ML20132B934)
- ML20132B935 + (ML20132B935)
- ML20132B937 + (ML20132B937)
- ML20132B938 + (ML20132B938)
- RBG-21-497, Interim Deficiency Rept DR-308 Re Ga Co 5-volt Logic Power Supplies for Digtal Radiation Monitors.Next Rept Will Be Provided by 850719 + (ML20132B939)
- ML20132B940 + (ML20132B940)
- IR 05000259/1985008 + (ML20132B941)
- ML20132B943 + (ML20132B943)
- ML20132B944 + (ML20132B944)
- RBG-22-116, Revised Final Part 21 Rept DR-259 Re Split Terminal Blocks Mfg by Underwriters Safety Device Co.Engineering & Design Coordination Rept Initiated & Corrective Maint Procedure 1026 Changed Re Replacement of Restraints + (ML20132B945)
- ML20132B947 + (ML20132B947)
- ML20132B948 + (ML20132B948)
- ML20132B949 + (ML20132B949)
- ML20132B951 + (ML20132B951)
- ML20132B953 + (ML20132B953)
- ML20132B954 + (ML20132B954)
- ML20132B955 + (ML20132B955)
- ML20132B956 + (ML20132B956)
- ML20132B958 + (ML20132B958)
- ML20132B959 + (ML20132B959)
- ML20132B960 + (ML20132B960)
- ML20132B961 + (ML20132B961)
- ML20132B962 + (ML20132B962)
- ML20132B963 + (ML20132B963)
- ML20132B964 + (ML20132B964)
- ML20132B967 + (ML20132B967)
- ML20132B968 + (ML20132B968)
- ML20132B972 + (ML20132B972)
- ML20132B974 + (ML20132B974)
- ML20132B975 + (ML20132B975)
- 05000336/LER-1985-010, :on 850615,loss of Low Temp Overpressure Protection Due to Isolation & Venting of Pressurizer Pressure Transmitters.Caused by Procedure Inadequacy.Porvs Manually Opened & Procedure Revised + (ML20132B976)
- ML20132B977 + (ML20132B977)
- ML20132B978 + (ML20132B978)
- ML20132B979 + (ML20132B979)
- 05000302/LER-1985-006, :on 850615,blown Fuses Resulted in Automatic Actuation of Emergency Diesel Generator.Caused by Misunderstanding of Process for Turning Over Plant Sys After Mod.Fuses Replaced & Procedures Reemphasized + (ML20132B980)
- RBG-21544, Forwards Response to NRC Request for Addl Info Re FSAR Figures 6.3-1,9.3-7L & 9.3-7p.Corrections Will Be Included in Future FSAR Amend + (ML20132B982)
- ML20132B983 + (ML20132B983)
- ML20132B984 + (ML20132B984)
- ML20132B985 + (ML20132B985)
- ML20132B986 + (ML20132B986)
- ML20132B989 + (ML20132B989)
- ML20132B990 + (ML20132B990)
- 05000302/LER-1985-005, :on 850530,emergency Diesel Generator Actuated. Caused by Lifting Leads on Protective Relays Due to Computer Program Input Error.Error Corrected + (ML20132B992)
- ML20132B995 + (ML20132B995)
- BVY-96-157, Submits Changes in Peak Cladding Temp for Plant ECCS LOCA Analysis + (ML20132B998)
- ML20132B999 + (ML20132B999)
- ML20132C002 + (ML20132C002)
- ML20132C003 + (ML20132C003)
- ML20132C007 + (ML20132C007)
- ML20132C009 + (ML20132C009)
- ML20132C010 + (ML20132C010)