Letter Sequence Other |
|---|
|
|
MONTHYEARML20133B2531984-03-20020 March 1984 Forwards Table Prioritizing Problems for Resolution According to Safety Significance.Review Requested Under TAC 54458 Complete Project stage: Other ML20132B8411984-03-21021 March 1984 Advises That Auxiliary Sys Branch Has Reviewed 248 Changes to Tech Specs & Prioritized 23 Changes Into Priority 1-3. Selection of Priority Based on Anticipated Risk to Health & Safety of Public.Effort on TAC 54458 Complete Project stage: Other ML20132B8201984-03-22022 March 1984 Forwards List of Items from Tech Spec Sheets for Which Reactor Sys Branch Has Responsibility.Each Item Assigned Priority Ranking Project stage: Other ML20133B2881984-03-22022 March 1984 Informs That Reactor Sys Branch Has Reviewed Tech Specs Problem Sheets Forwarded Under TAC 54458.List of Items for Which Branch Responsible Encl Project stage: Other ML20132B9251984-03-27027 March 1984 Comments on Prioritization of Tech Spec Problem Sheets. Twenty-five Problem Sheets Identified.Four Items of High Priority & 21 of Low Priority Project stage: Other ML20133B1311984-03-27027 March 1984 Informs of Completion of Containment Sys Branch Review of Tech Spec Problem Sheets.Recommends 21 Open Items Be Resolved Before Completion of First Refueling Outage Project stage: Approval ML20132B9641984-04-0909 April 1984 Informs of re-prioritization of Changes to Tech Specs,Per Div of Licensing Work Request Sheet.Categories 1 & 2 Items Listed.Tac 54458 Complete Project stage: Other ML20133B0441984-04-10010 April 1984 Forwards Comments Re Tech Spec Problem Sheets 292,293 & 306 Needing Resolution Before Low Power Operation Project stage: Other ML20132B9901984-04-12012 April 1984 Informs That No Addl Problem Areas within Instrumentation & Control Sys Branch Scope Require Resolution Prior to Next Criticality,W/Exception of Problem Areas Identified by Licensee,In Response to 840410 Memo Project stage: Other ML20133B2051984-04-13013 April 1984 Summarizes Results of Containment Sys Branch Review of Tech Spec Problem Sheets Needed for Low Power Operation. No Problem Sheets Identified for Resolution Prior to Operation Above 5% Full Power Project stage: Approval 1984-03-27
[Table View] |
Text
.
jk -
E[
U p" *
- bg umT o sTA7:s AUCLIA." 3 ECULATORY CCf.' MISSION 4
f j,, ).,
w4mGTON. o. c. 20553 h,,,)$'fl
'a APR 121984 MEMORANDUM FOR:
iney 1
FROM:
R. Wayne Houston, Assistant Director for Reactor Safety Division of Systems Integration
SUBJECT:
ICSB REVIEW 0F GRAND GULF - UNIT 1 PROBLEM SHEETS Plant Name: Grand Gul f-Unit 1 Docket No.:
50-416 TAC No.: 54458 Licensing Status: 0L Project Manager:
D. Houston Review Branch:
ICSB Review Status: Complete By memorandum dated April 10, 1984 you requested that we review the 248 Grand Gulf-Unit 1 Technical Specification problem area descriptions pro-vided by Mississippi Power and Light at the April 4,1984 meeting with the NRC staff. The purpose of this review was to identify those problem areas that should be resolved prior to next criticality under the existing low power license. The Instrumentation and Control Systens Branch (ICSB) has reviewed the 248 problem areas and found that with the exception of those problem areas identified by the licensee, no additional problem areas within the ICSB scope require resolution prior to next criticality.
This completes the ICSB portion of TAC 54458.
3.
i
\\.,,,s, s -
,1 t R. Wayne Houston, Assistant Director for Reactor Safety Division of Systems Integration cc:
R. Mattson R. Capra L. Kintner D. Hoffman D. Houston
Contact:
M. Vi rgilio, ICSB X29454