ML20132B972
| ML20132B972 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/31/1996 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20132B958 | List: |
| References | |
| NUDOCS 9612180043 | |
| Download: ML20132B972 (2) | |
Text
.
CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT October 1996 1.
Personnel Exposure -
The total station liquid release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
l l
9612180043 961213 PDR ADOCK 05000413 R
m
)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME uu;antsa 1 DATE 11/1d/96
- REVISION 1 REPORT MONTH October 1996 COMPLETED BY x.
A.
nilliams PAGE 2 OF 2 TELEPHONE (1ue ) s a2-d.se 6 (1)
(2)
(3)
(4)
(5) t R
MET-E HOD T
A OF LICENSE i
N Y
S SHUT EVENT SYS-CAUSE AND CORRECTIVE i
O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 13-P 96 8 S
B HA TRANSF UNIT LOAD TRANSIENT TEST 14-P 96 9 F
A HA GENERA GENERATOR COOLING SYSTEM f
TEMPERATURE PROBLEMS 15-P 96-10-27 F
A EA TRANSF "1A" MAIN TRANSFORMER COOLING PROBLEM
{
16-P 96-10-28 F
A HA CKTBKR GENERATOR BREAKER "1AT" MOTOR OPERATED DISCONNECT CLOSURE PROBLEM i
17-P 96-10-29 F
B EA TRANSF "1A" MAIN TRANSFORMER MAINTENANCE i
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Pr,saration of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licenseet C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator iraining & License Examination F-Administrative (5) i (Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
-