From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20132B958 List:
References
NUDOCS 9612180040
Download: ML20132B962 (10)


Text

OPERATINS DATA REPORT DOCKET NO 50-413 DATE December 13. 1996 GPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346

1. Unit Nase: Catawba 1
2. Reporting Period: November 1, 1996-Novesber 30,1996
3. Licensed Thereal Power (MWt):

3411

4. Nameplate Rating (Bross NWe):

1305*

Notes aNameplate Rating

3. Design Electrical Rating (Net MWe):

!!45 (Bross NWel calculated as

6. Maxinus Dependable Capacity (6 toss NWe):

1192 1450.000 MVA x.90 power

7. Maximus Dependable Capacity (Net BWe):

1129 factor per Page lit,

8. If Changes Dccur in capacity Ratings (Itess Nuaber 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, if any:

This Month Yr.-to-Date Cuaulative

!!. Hours In Reporting Period 720.0 8040.0 100153.0

12. husber Of Hours Reactor Was Critical 720.0 5246.7 77540.4
13. Reactor Reserve Shutdown Hours

- --0--

--0--

14. Hours Generater On-Line 720.0 5158.2 76246.9
15. Unit Reserve Shutdown Hours -

--0--

--0--

16. Gross Thersal Energy Benerated (MWH) 2446374 16595385 248545644
17. Grcss Electrical Energy Generated (MWH) 882695 5944117 87846928
19. Net Electrical Energy Generated (MWH) 838082 5500876 B2625965
19. Unit Service Factor 100.0 64.2 76.1
20. Unit Availability Factor 100.0 64.2 76.1
21. Unit Capacity Factor (Using MDC Net) 103.1 61.5 72.8
22. Unit Capacity Factor (Using DER Net) 101.7 60.6 72.1
23. Unit Forced Outage Rate 0.0 3.0 7.9
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None
25. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units In Test Status (Prior to Consercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERA'i!0N 9612180040 961213 PDR ADOCK 05000413 R

PDR

OPERAi!NG DATA REPORT DOCKET NO 50-413 191[T Catamba i DATE December 13. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH November,1996

' M1 AVERAGE DAILY POWER LEVEL PAY.

AVERAGE DAILY POWER LEVEL

'(MWe-Net)

(MWe-Net) 1062 17

!!70 i

s 2

!!42 18

!!69

)

3 1171 19

!!67 4

1171 20 1168 l

5 1166 21 1168 l

i 6

1162 22 1171 7

1157 23

!!70 l

8

!!59 24 1168 9

1171 25

!!62 10

!!71 26 1165 11 1171 27 1170 l.

12 1172 28 1172 l

l 13

!!71 29

!!72 l

i l

14 -

!!69 30 1170 l

15

!!71 I

16 1870 I

i i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413 UNIT NAME CKrantsa 1 DATE 12/13/36 REPORT MONTH November 1996 COMPLETED BY K.

A.

Williams TELEPHONE

( > u s ) - 3 ts 2 - d 3 4 6 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)

G-Operator Error H-Other

c.

___~..._.__.___.__.m__

..____..__.____.m...

i i

MONTHLY REFUELING INFORMATION REOUEST i

1.

Facility name:

Catawba. Unit 1 2.

Scheduled next refueling shutdown: December 1997 l

l 3.

Scheduled restart following refueling: January 1998 1-

}

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

5 i

i 4.

Will refueling or resumption of operation thereafter require a technical specification change or i

other license amendment?

Ifyes, what will these be?

i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

I.

5.

Scheduled date(s) for submitting proposed licensiag action and supporting information.

4 6.

Important licensing considerations (new or different design or supplier, unreviewed design or

[

performance analysis methods, significant changes in design or new operating procedures).

j 7.

Number of Fuel assemblies (a) in the core: J93 I

(b) in the spent fuel pool: #32 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -

y 9.

Projected date oflast refueling which can be accommodated by present license capacity:

4 1

Scotember 2009 4

j DUKE POWER COMPANY DATE: December 13.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 1

.I 4

i 1

i

,,_..w-_

i DOCKET: 50-413 UNIT: Catawba 1 Date: 12/13/96 l

l NARRATIVE

SUMMARY

MONTH: November,1996 Catawba Unit I began the month of November operating at approximately 57% full power due to "I A" main transformer maintenance. The unit returned to 100% full power on 11/01/96 at 1445, and operated at or near 100% full power the remainder of the month.

l Prepared by: R. A. Williams

. Telephone: (704)- 382-5346

.- ~

5

)

OPERATING DATA REPORT DOCKET NO 50-414 I

DATE Deceeber 13. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willians

~

c TELEPHONE 704-382-5346

l. Unit Nase: Catawba 2
2. Reporting Period: November 1, 1996-November 30,1996
3. Licensed Thereal Power (Mti:

3411

4. Naseplate Rating (Bross We):

1305e Notes ~ eNaseplate Rating

~

5. Design Electrical Rating (Net Hel

!!45 (6tess MWe) calculated as

6. Maxieue Dependable Capacity (Gross MWel 1192 1450.000 MA.90 power
7. Maxieue Dependable Capacity (Net Me):

!!29 factor per Page 111,

8. If Changes occur in Capacity Ratings (itses Nueber 3 Through 7) Since Last HUREB-0020.

Report. Give Reasons:

9. Power Lsvol To Which Restricted, If Any (Net We):

j

10. Reason For Restrictions, if'any:

2 This Month Yr.-to-Date Cueulative

!!. Hours In Reporting Period 720.0 8040.0 90169.0

12. Nueber Of Hours Reactor Was Critical 720.0 7592.8 71758.9

-13. Reactor Reserve Shutdown Hours -

--0--

--0--

14. Hours Benerator On-Line 720.0 7538.9 70676.6 15.UnitReserveShutdownHours -

- --0--

16. Gross Thereal Energy Generated ( WH1 2411461 25391975

.229808513

17. Gross Electrical Energy Generated (MWH) 865900 9069281 81173648
18. Net Electrical Energy Generated (MH) 823825 8598405

_76510662

19. Unit Service Factor 100.0 93.8 78.4'
20. Unit Availability Factor 100.0 93.8 78.4
21. Unit Capacity Factor (Using MDC Net)

-101.4 94.7 75.0

22. Unit Capacity Factor (Using DER Net) 99.9 93.4 74.1

'23. Unit Forced Outage Rate 0.0 6.2 8.6

24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - March 14, 1997 - 45 days

25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
26. Units In Test Status (Prior to Coseercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERAi!ON l

.. ~ _...

.. ~.. -.. - ~ -

4 T

4 OPERAi!NG DATA REPORT 4

DOCKET NO 50-4!4 tlNIT _

C?+ aba 2 DATE Dvaber 13. 1996 COMPLETED BY R.A. Willines TELEPHONE 704-382-5346-MONTH November. 1996 4

-E AVERA6E DAILY POWER LEVEL M

AVERA6E DAILY POWER LEVEL 4'

(MWe-Net)

(MWe-Net) i 1162 17'

!!68 2

1165 18 -

1165 i

3 1168 19

!!66 4

1169 20 1167 l

3

!!67 21

!!67 1

-6

!!62 22

!!69 7

!!56 23

!!63 4

i 1

8 1139 24 1152 9

1160 25 1137 10 1168 26 1147 11 1170 27

!!63 4

i-4 12 1170 28 1165 i

13 -

1170 29 1166 14 836 30 1167

. 13 942 4

la 1161 f

f g

r.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 UNIT NAME tA1:awna z DATE-12/13/96 REPORT MONTH November 1996 COMPLETED BY x.

a.

william's TELEPHONE.

(eve)-Juz-das6 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE S

SHUT EVENT SYS-CAUSE AND CORRECTIVE N

Y O

DOWN REPORT TEM COMPONENT ACTION TO O

P DURATION DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 8-P 96-11-14 F

A EB ELECON "2A" MAIN POWER SWITCHYARD CONNECTOR REPAIR (1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain)'

1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee Event Report (LER (NUREG-0161))

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same source (Explain) (Explain)

G-Operator Error H-Other

- ~. - -.

~ - -.-

\\

I 4

)

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

Catawba. Unit 2

]

2.

Scheduled next refueling shutdown: March 1997 j

3.

Scheduled restart following refueling: April 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

i Ifyes, what will these be?

i If no, has reload design and core configuration been reviewed by Safety Review Committee I

regarding unreviewed safety questions?

)

S.

Scheduled date(s) for submitting proposed licensing action and supporting information.

l l

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

1 7.

Number of Fuel assemblies (a) in the core: J_3 j

3 (b) in the spent fuel pool: 124 I

8.

Present licensed fuel pool capacity: 1418 i

Size of requested or planned increase: -

J l

9.

Projected date oflast refueling which can be accommodated by present license capacity:

September 2011 DUKE POWER COMPANY DATE: December 13.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 1

3 DOCKET: 50-414 UNIT: Catawba 2

[

Date: 12/13/96

+

NARRATIVE

SUMMARY

~

i MONTH: November,1996 i

Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near l

100% fullpower until 11/14/96 at 1000, when the unit began decreasing power due to "2A" main power -

switchyard connector repair. The unit held at 47% power from 11/14/96 at 1520 to 11/15/96 at 0300 due to j

"2A" main power switchyard connector repair. The unit returned to 100% full power on 11/15/96 at 1453, and operated at or near 100% full power the remainder of the month.