OPERATINS DATA REPORT DOCKET NO 50-413 DATE December 13. 1996 GPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346
- 1. Unit Nase: Catawba 1
- 2. Reporting Period: November 1, 1996-Novesber 30,1996
- 3. Licensed Thereal Power (MWt):
3411
- 4. Nameplate Rating (Bross NWe):
1305*
Notes aNameplate Rating
- 3. Design Electrical Rating (Net MWe):
!!45 (Bross NWel calculated as
- 6. Maxinus Dependable Capacity (6 toss NWe):
1192 1450.000 MVA x.90 power
- 7. Maximus Dependable Capacity (Net BWe):
1129 factor per Page lit,
- 8. If Changes Dccur in capacity Ratings (Itess Nuaber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cuaulative
!!. Hours In Reporting Period 720.0 8040.0 100153.0
- 12. husber Of Hours Reactor Was Critical 720.0 5246.7 77540.4
- 13. Reactor Reserve Shutdown Hours
- --0--
--0--
- 14. Hours Generater On-Line 720.0 5158.2 76246.9
- 15. Unit Reserve Shutdown Hours -
--0--
--0--
- 16. Gross Thersal Energy Benerated (MWH) 2446374 16595385 248545644
- 17. Grcss Electrical Energy Generated (MWH) 882695 5944117 87846928
- 19. Net Electrical Energy Generated (MWH) 838082 5500876 B2625965
- 19. Unit Service Factor 100.0 64.2 76.1
- 20. Unit Availability Factor 100.0 64.2 76.1
- 21. Unit Capacity Factor (Using MDC Net) 103.1 61.5 72.8
- 22. Unit Capacity Factor (Using DER Net) 101.7 60.6 72.1
- 23. Unit Forced Outage Rate 0.0 3.0 7.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units In Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERA'i!0N 9612180040 961213 PDR ADOCK 05000413 R
OPERAi!NG DATA REPORT DOCKET NO 50-413 191[T Catamba i DATE December 13. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH November,1996
' M1 AVERAGE DAILY POWER LEVEL PAY.
AVERAGE DAILY POWER LEVEL
'(MWe-Net)
(MWe-Net) 1062 17
!!70 i
s 2
!!42 18
!!69
)
3 1171 19
!!67 4
1171 20 1168 l
5 1166 21 1168 l
i 6
1162 22 1171 7
1157 23
!!70 l
8
!!59 24 1168 9
1171 25
!!62 10
!!71 26 1165 11 1171 27 1170 l.
12 1172 28 1172 l
l 13
!!71 29
!!72 l
i l
14 -
!!69 30 1170 l
15
!!71 I
16 1870 I
i i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CKrantsa 1 DATE 12/13/36 REPORT MONTH November 1996 COMPLETED BY K.
A.
Williams TELEPHONE
( > u s ) - 3 ts 2 - d 3 4 6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
c.
___~..._.__.___.__.m__
..____..__.____.m...
i i
MONTHLY REFUELING INFORMATION REOUEST i
1.
Facility name:
Catawba. Unit 1 2.
Scheduled next refueling shutdown: December 1997 l
l 3.
Scheduled restart following refueling: January 1998 1-
}
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
5 i
i 4.
Will refueling or resumption of operation thereafter require a technical specification change or i
other license amendment?
Ifyes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
I.
5.
Scheduled date(s) for submitting proposed licensiag action and supporting information.
4 6.
Important licensing considerations (new or different design or supplier, unreviewed design or
[
performance analysis methods, significant changes in design or new operating procedures).
j 7.
Number of Fuel assemblies (a) in the core: J93 I
(b) in the spent fuel pool: #32 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
y 9.
Projected date oflast refueling which can be accommodated by present license capacity:
4 1
Scotember 2009 4
j DUKE POWER COMPANY DATE: December 13.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 1
.I 4
i 1
i
,,_..w-_
i DOCKET: 50-413 UNIT: Catawba 1 Date: 12/13/96 l
l NARRATIVE
SUMMARY
MONTH: November,1996 Catawba Unit I began the month of November operating at approximately 57% full power due to "I A" main transformer maintenance. The unit returned to 100% full power on 11/01/96 at 1445, and operated at or near 100% full power the remainder of the month.
l Prepared by: R. A. Williams
. Telephone: (704)- 382-5346
.- ~
5
)
OPERATING DATA REPORT DOCKET NO 50-414 I
DATE Deceeber 13. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willians
~
c TELEPHONE 704-382-5346
- l. Unit Nase: Catawba 2
- 2. Reporting Period: November 1, 1996-November 30,1996
- 3. Licensed Thereal Power (Mti:
3411
- 4. Naseplate Rating (Bross We):
1305e Notes ~ eNaseplate Rating
~
- 5. Design Electrical Rating (Net Hel
!!45 (6tess MWe) calculated as
- 6. Maxieue Dependable Capacity (Gross MWel 1192 1450.000 MA.90 power
- 7. Maxieue Dependable Capacity (Net Me):
!!29 factor per Page 111,
- 8. If Changes occur in Capacity Ratings (itses Nueber 3 Through 7) Since Last HUREB-0020.
Report. Give Reasons:
- 9. Power Lsvol To Which Restricted, If Any (Net We):
j
- 10. Reason For Restrictions, if'any:
2 This Month Yr.-to-Date Cueulative
!!. Hours In Reporting Period 720.0 8040.0 90169.0
- 12. Nueber Of Hours Reactor Was Critical 720.0 7592.8 71758.9
-13. Reactor Reserve Shutdown Hours -
--0--
--0--
- 14. Hours Benerator On-Line 720.0 7538.9 70676.6 15.UnitReserveShutdownHours -
- --0--
- 16. Gross Thereal Energy Generated ( WH1 2411461 25391975
.229808513
- 17. Gross Electrical Energy Generated (MWH) 865900 9069281 81173648
- 18. Net Electrical Energy Generated (MH) 823825 8598405
_76510662
- 19. Unit Service Factor 100.0 93.8 78.4'
- 20. Unit Availability Factor 100.0 93.8 78.4
- 21. Unit Capacity Factor (Using MDC Net)
-101.4 94.7 75.0
- 22. Unit Capacity Factor (Using DER Net) 99.9 93.4 74.1
'23. Unit Forced Outage Rate 0.0 6.2 8.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling - March 14, 1997 - 45 days
- 25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERAi!ON l
.. ~ _...
.. ~.. -.. - ~ -
4 T
4 OPERAi!NG DATA REPORT 4
DOCKET NO 50-4!4 tlNIT _
C?+ aba 2 DATE Dvaber 13. 1996 COMPLETED BY R.A. Willines TELEPHONE 704-382-5346-MONTH November. 1996 4
-E AVERA6E DAILY POWER LEVEL M
AVERA6E DAILY POWER LEVEL 4'
(MWe-Net)
(MWe-Net) i 1162 17'
!!68 2
1165 18 -
1165 i
3 1168 19
!!66 4
1169 20 1167 l
3
!!67 21
!!67 1
-6
!!62 22
!!69 7
!!56 23
!!63 4
i 1
8 1139 24 1152 9
1160 25 1137 10 1168 26 1147 11 1170 27
!!63 4
i-4 12 1170 28 1165 i
13 -
1170 29 1166 14 836 30 1167
. 13 942 4
la 1161 f
f g
r.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME tA1:awna z DATE-12/13/96 REPORT MONTH November 1996 COMPLETED BY x.
a.
william's TELEPHONE.
(eve)-Juz-das6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE S
SHUT EVENT SYS-CAUSE AND CORRECTIVE N
Y O
DOWN REPORT TEM COMPONENT ACTION TO O
P DURATION DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 8-P 96-11-14 F
A EB ELECON "2A" MAIN POWER SWITCHYARD CONNECTOR REPAIR (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain)'
1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee Event Report (LER (NUREG-0161))
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same source (Explain) (Explain)
G-Operator Error H-Other
- ~. - -.
~ - -.-
\\
I 4
)
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 2
]
2.
Scheduled next refueling shutdown: March 1997 j
3.
Scheduled restart following refueling: April 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
i Ifyes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee I
regarding unreviewed safety questions?
)
S.
Scheduled date(s) for submitting proposed licensing action and supporting information.
l l
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
1 7.
Number of Fuel assemblies (a) in the core: J_3 j
3 (b) in the spent fuel pool: 124 I
8.
Present licensed fuel pool capacity: 1418 i
Size of requested or planned increase: -
J l
9.
Projected date oflast refueling which can be accommodated by present license capacity:
September 2011 DUKE POWER COMPANY DATE: December 13.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 1
3 DOCKET: 50-414 UNIT: Catawba 2
[
Date: 12/13/96
+
NARRATIVE
SUMMARY
~
i MONTH: November,1996 i
Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near l
100% fullpower until 11/14/96 at 1000, when the unit began decreasing power due to "2A" main power -
switchyard connector repair. The unit held at 47% power from 11/14/96 at 1520 to 11/15/96 at 0300 due to j
"2A" main power switchyard connector repair. The unit returned to 100% full power on 11/15/96 at 1453, and operated at or near 100% full power the remainder of the month.
I l
i i
i Prepared by: R. A. Williams Telephone: (704)- 382-5346 i
i