i OPERATINGDATAREPORT 4
l DOCKET NO 50-369 j
DATE December 13. 1996 OPEEATild6 STATUS COMPLETEDBY R.A. Willines i
TELEPHONE 704-382-5346
- 1. Unit Naee: McGuire 1
- 2. Reporting Period: Novreber 1, 1996-November 30,1996
- 3. Licensed Thermal Power (MWtli 3411 i
- 4. Naseplate Rating (6ross MWe):
1305t Notes *Naseplate Rating
- 9. Design Electrical Rating (Net NWel:
!!80 (Bross MWel calculated as
- 6. Maxinus Dependable Capacity (Gross MWe):
1171 1450.000 MVA
.90 power
- 7. M u leus Dependable Capacity (Net MWe):
!!29 factor per Page ill,
- 8. If Changes Occur in Capacity Ratings (!tess Nuaber 3 Through 7) Since Last NUREG-0020.
Report. Give Reasons:
l
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
i This Meeth Yr.-to-Date Cuaulai m
!!. Hours it Reporting Period 720.0 8040.0 131496.0
- 12. Number Of Hours Reactor Was Critical 486.1 7200.7 95648.0
- 13. Reactor Reserve Shutdown Hours
- - 0--
- 14. Hcurs Generator On-Line 485.7 7115.9 94647.5
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Stoss Thernal Etergy Ger.erated (MWH) 1363900 23696731 298450833
- 17. Gross Electrical Energy Generated (MWH) 467128 8095989 102471269
- 18. Net Electrical Energy Generated (MW14) 439957 7771412 97938983
- 19. Unit Service factor 67.5 88.5 72.0
- 20. Unit Availability Factor 67.5 88.5 72.0
- 21. Unit Capacity Factor (Using MDC het) 54.1 85.6 65.0
- 22. Unit Capacity factor (Using DER Net) 51.8 81.9 63.1
- 23. Unit Forced Outage Rate 32.5 4.2 12.9
- 24. Shutdown Scheduled Over Nest 6 Months (Type, Date, and Duration of Each):
Refueling and Steam Generator Replacement - February 07, 1997 - 100 days 25..!f Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units in fest Status (Prior to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY i
COMMERCIAL DPERATION 9612180059 961213 PDR ADOCK 05000369 R
OPERATING tATA REPORI DOCKET NO 50-369 UNIT McGuire 1 DATE Decesber 13. 1996 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 MONTH Nevesber. 1996 QAl AVERASE DAILY F0WER LEVEL LA1 AVERAGE DAILY POWER LEVEL (MWe-Net)
(NWe-Net) 1 0
17 1136 2
0 18 1137 3
0 19
!!36 4
0 20 1136 5
0 21 1136 6
0 22 1129 7
0 23 1101 8
0 24 1139 9
0 25 1139 10 15 26 1139 j
l 11 890 27 208 12 1130 29 152 13
!!13 29 152 14 1134 30 149 15 1134 16
!!35
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME mwuigts 1 DATE 12/13/96 REPORT MONTH November 1996 COMPLETED BY K.
A.
williams TELEPHONE tIv4)-3cz-33e6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF
-LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 5
96 1 F
234.30 D
ED BATTRY VITAL BATTERY INOPERABLE DUE TO FAILED DISCHARGE TEST A
HB VALVEX EVALUATE MOISTURE SEPARATOR 12-P 96-11-11 F
REHEATER CHECK VALVE 13-P 96-11-27 F
A SD VALVEX STEAM GENERATOR "D"
FEEDWATER CONTAINMENT ISOLATION VALVE LEAK (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
MONTHLY REFUELING INFORMATION REOUEST 4
1.
Facility name:
McGuire. Unit 1 1
2.
Scheduled next refueling shutdown: February 1997 3.
Scheduled restart following refueling: May 1997 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CIIANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGil 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: ]93 (b) in the spent fuel pool: 22]3, 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:.--
9.
Projected date oflast refueling which can be accommodated by present license capacity: March 4
2006***
DUKE POWER COMPANY DATE: December 13.1996 Name of
Contact:
R. A. Williams Phone: (7041-382-5346
DOCKET: 50-369 UNIT: McGuire 1 Date:
12/13/ %
f NARRATIVE
SUMMARY
MONTH: November,1996 l
McGuire Unit I began the month of November in an outage due to the vital battery bank was declared inoperable due to failed discharge test (not enough replacement battery cells onsite). The unit returned to service on 11/10/96 at 1820. During power escalation, the unit held at 82% power from i1/11/96 at 0740 to 1425 to evaluate moisture separator reheater check valve. On 11/27/96 at 0055 the unit began rapid down power due to hydraulic fluid leak on steam generator "D" feedwater cortainment isolation valve and held at 22% full power from 11/27/96 at 0140 to the end of the month.
l l
Prepared by: R. A. Williams Telephone:(704)- 382-5346
}
l 4
CPERATING DATA REPORT i
DOCKET N0 50-370 DATE December 13. 1996 OPERATING STATUS COMPLETED BY R.A. Willians IELEPHONE 704-382-5346
- 1. Unit Naee: McGuire 2
- 2. Rsporting Period: November 1, 1996-November 30,1996
- 3. Licen n a Thereal Poner (MWt):
3411
- 4. Waseplate Rating (6ross MWe):
13055 Notes #Naseplate Rating
- 9. Design Electrical Rating (Not MWe):
1180 (Bross MWal calculated as
- 6. Marisus Dependable Capacity (6ross MWe):
1171 1450.000 MVA :.90 power
- 7. Maxinus Dependable Capacity (Net MWe):
1129 factor per Page iii,
- 8. If Changes occur in Capacity Ratings (! tees Nusber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons'
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Raason For Restrictions, If any:
i This Month Yr.-to-Date Cumulative
!!. Hours In Reporting Period 720.0 8040.0
!!!792.0
- 12. Nusber Of Hours Reactor Was Critical 452.6 5842.9 87598.6
- 13. Reacter Reserve Shutdown Hours -
- -0--
- 14. Heurs Generator On-Line 447.4 5801.3 86532.0
- 15. Unit Reserve Shutdown Hours -
--0-- -
- 16. 6ross thersal Energy Generated (MWH) 1487425 19333868 2845735t7
- 17. Eross Electrical Energy Generated (MWH) 518173 6684056 99187332
- 18. Net Electrical Energy 6enerated (MWH) 492240 6401647 95114004
- 19. Unit Service Factor 62.1 72.2 77.4
- 20. Unit Availability Factor 62.1 72.2 77.4
- 21. Unit Capacity Factor (Using MDC Net) 60.6 70.5 74.7
- 22. Unit Capacity Factor (Using DER Net) 57.9 67.5 72.1
- 23. Unit Forced Outage Rate 37.9 18.2 7.3
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 23. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units in Test Status (Prior to Cassercial Operation):
Forecast Achieved IN!i!AL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAI!ON
_.._.....___.---_..m.
t I
DPERAi!N6 DATA REPORT DOCKET NO 50-370' I
UNii McGuire 2 3
DATE December 13. 1996 COMPLETED BY R.A. Williams-TELEPHONE 704-302-5346 MONTH' Wovember. 1996 E
AVERA6E DAILY POWER LEVEL E
AVERAGE DAILY POWER LEVEL-'
(MWe-Met)
(MWe-Net) i 1
0 17 1139 F
2 0
- 18 1141 I
3 0
19 1141 4
0 20 1140 I
5 0
21 1142 6
0 22 1144
~7 0
23 1146
-l 8
0 24 1147 9
0 25 1147 l
10.
0 26 1146 I
11-0 27 1145 i
12 -
246 29 1147
.l l
13 1103 29 1147 I
10 1127 30 1149 s
13
!!24 16
!!37
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNIT NAME mwuuss 2 DATE 12/1.s/36 REPORT MONTH November 1996 COMPLETED BY
- x. A _. williams TELEPHONE t ius J -3 tsz-d.se 6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 4
96 1 F
272.65 D
ED BATTRY VITAL BATTERY INOPERABLE DUE TO FAILED DISCHARGE TEST 1
i i
i (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee' Event Report (LER C-Refueling 3-Automatic Scram
( M EG-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
I Exhibit I - Same source t
(Explain) (Explain)
G-Operator Error H-Other i-t L
i
. ~. -.. -...
. - - -. - ~
MONTHLY REFUELING INFORMATION REOUEST l.
Facility name:
McGuire. Unit 2 2.
Scheduled next refueling shutdown: September 1997 3.
Scheduled restart following refueling: January 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee rega-ding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 96_9 6
8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
December 2003 DUKE POWER COMPANY DATE: December 13.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
DOCKET: 50-370 UNIT: McGuire 2 j
Date:
12/13/96 NARRATIVE
SUMMARY
MONTH: November,1996 McGuire Unit 2 began the month of November in an outage due to the vital battery bank was declared inoperable due to failed discharge test (not enough replacement battery cells onsite). The unit returned to service on 11/12/96 at 0839. The unit returned to approximately 100% full power on 11/13/96 at 1800, and operated at or near 100% full power the remainder of the month.
J i
1 l
i i
4 4
Prepared by: R. A. Williams Telephone: (704)- 382-5346 a