Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126D554 + (ML20126D554)
- ML20126D556 + (ML20126D556)
- ML20126D558 + (ML20126D558)
- ML20126D562 + (ML20126D562)
- ML20126D563 + (ML20126D563)
- ML20126D565 + (ML20126D565)
- ML20126D566 + (ML20126D566)
- ML20126D568 + (ML20126D568)
- ML20126D569 + (ML20126D569)
- ML20126D571 + (ML20126D571)
- ML20126D572 + (ML20126D572)
- ML20126D573 + (ML20126D573)
- ML20126D574 + (ML20126D574)
- ML20126D575 + (ML20126D575)
- 05000327/LER-1992-021, :on 921120,failure to Verify Valve Positions for Verification of Containment Integrity Noted.Caused by Inappropriate Waiver of SI Steps as Result of Inadequate Procedure.Procedure Revised + (ML20126D576)
- ML20126D577 + (ML20126D577)
- ML20126D578 + (ML20126D578)
- ML20126D579 + (ML20126D579)
- ML20126D580 + (ML20126D580)
- ML20126D581 + (ML20126D581)
- 05000327/LER-1992-020, :on 921119,discovered That Fire Watch Patrol Was Not Performed within Timeframe Required.Caused by Personnel Splitting One Fire Watch Route.Addl Fire Protection Related Records Were Reviewed + (ML20126D582)
- ML20126D583 + (ML20126D583)
- ML20126D585 + (ML20126D585)
- ML20126D586 + (ML20126D586)
- ML20126D588 + (ML20126D588)
- ML20126D591 + (ML20126D591)
- ML20126D592 + (ML20126D592)
- ML20126D595 + (ML20126D595)
- IR 05000335/1992023 + (ML20126D596)
- ML20126D597 + (ML20126D597)
- ML20126D599 + (ML20126D599)
- 05000366/LER-1980-023, Forwards Updated LER 80-023/03X-1 + (ML20126D600)
- ML20126D602 + (ML20126D602)
- 05000366/LER-1980-023-03, While Pulling Rods in Starup Mode,Rod 46-43 Found Bypassed full-out in Rod Sequence Control Sys But Not Pulled to Presscribed Position Until Later.Caused by Personnel Error + (ML20126D603)
- ML20126D605 + (ML20126D605)
- 05000366/LER-1980-038, Forwards LER 80-038/03L-0 + (ML20126D606)
- ML20126D608 + (ML20126D608)
- 05000366/LER-1980-038-03, /03L-0:on 800328,while Performing Reactor Bldg Isolation Sys Functional Test,Drywell to Torus Dp Isolation Valves Failed to Close on Isolation Signal.Caused by Component Failure.Valve Packings Loosened & Valves Closed + (ML20126D611)
- ML20126D614 + (ML20126D614)
- ML20126D615 + (ML20126D615)
- ELV-05099, Forwards Vols 1 & 2 of Individual Plant Exam Rept in Response to Generic Ltr 88-20 + (ML20126D616)
- ML20126D617 + (ML20126D617)
- ML20126D619 + (ML20126D619)
- ML20126D621 + (ML20126D621)
- ML20126D622 + (ML20126D622)
- ML20126D623 + (ML20126D623)
- ML20126D625 + (ML20126D625)
- ML20126D626 + (ML20126D626)
- 05000321/LER-1980-035, Forwards LER 80-035/03L-0 + (ML20126D628)
- ML20126D629 + (ML20126D629)
- LD-92-117, Forwards Proprietary Oversize Sys 80+ drawings,D200-9,11 & 13,Rev 1 & Electronic Diskette W/Proprietary Design & Operations Data for MAAP Computer Code.Encls Withheld (Ref 10CFR2.790) + (ML20126D631)