Semantic search

Jump to navigation Jump to search
 Start dateSiteTitleSystem
ML23088A25423 March 2023CallawayEIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases DocumentSteam Generator
Reactor Coolant System
Feedwater
Secondary containment
Service water
Reactor Protection System
Emergency Diesel Generator
Auxiliary Feedwater
Primary containment
Main Transformer
Shutdown Cooling
Safety Parameter Display System
Reactor Pressure Vessel
Residual Heat Removal
Main Steam Safety Valve
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Rod
Main Steam
Containment Spray
ML23089A02810 March 202307201026FOIA-2023-000071 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
ML23060A2459 March 2023Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 21, 2023Reactor Coolant System
Secondary containment
Primary containment
Control Room Emergency Filtration System
Main Steam Line
ML23054A32428 February 2023Vallecitos Nuclear CenterNedo 32765, Revision 5, Technical Specifications for the Nuclear Test Reactor Facility License R-33Reactor Coolant System
Control Rod
ML23054A32123 February 2023Vallecitos Nuclear CenterGEH Supplemental Information for Ntr License Renewal ApplicationReactor Coolant System
Control Rod
ML23052A15021 February 2023CookNRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation
ML23052A02317 February 2023LimerickLicense Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project InstallationReactor Coolant System
Feedwater
Secondary containment
High Pressure Coolant Injection
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Primary containment
Reactor Recirculation Pump
Reactor Pressure Vessel
Core Spray
Residual Heat Removal
Reactor Water Cleanup
Standby Gas Treatment System
Standby Liquid Control
Intermediate Range Monitor
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Safety Relief Valve
Control Rod
Main Steam
Low Pressure Coolant Injection
IR 05000390/202200410 February 2023Watts BarIntegrated Inspection Report 05000390/2022004 and 05000391/2022004Steam Generator
Feedwater
Reactor Protection System
Emergency Diesel Generator
Auxiliary Feedwater
Residual Heat Removal
Emergency Gas Treatment System
Emergency Core Cooling System
Safety Relief Valve
Control Rod
Containment Spray
RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)30 January 2023RobinsonTechnical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)
AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation26 January 2023CookRequest for Approval of Change Regarding Neutron Flux InstrumentationSteam Generator
Reactor Coolant System
Auxiliary Feedwater
ML23001A00031 December 202299902078
05200050
LLC Submittal of the NuScale Standard Design Approval Application - Part 4, US460 Generic Technical Specifications, Volumes 1 and 2, Revision 0Steam Generator
Reactor Coolant System
Feedwater
Main Steam Isolation Valve
Shutdown Cooling
Reactor Pressure Vessel
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Rod
Main Steam
ML23304A37031 December 202205200050LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 16, TR-101310-NP, US460 Standard Design Approval Technical Specifications DevelopmentSteam Generator
Reactor Coolant System
Feedwater
Reactor Pressure Vessel
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Control Rod
ML23062A65129 December 2022CallawayRevision OL-26 to Final Safety Analysis Report, Chapter 16, Technical RequirementsSteam Generator
Reactor Coolant System
Feedwater
Service water
Reactor Protection System
Emergency Diesel Generator
Auxiliary Feedwater
Primary containment
Shutdown Cooling
HVAC
Reactor Pressure Vessel
Residual Heat Removal
Control Room Emergency Ventilation
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Rod
Containment Spray
ML23067A15729 December 2022CallawayTechnical Specifications, Chapter 3.3, InstrumentationSteam Generator
Reactor Coolant System
Feedwater
Auxiliary Feedwater
Control Room Emergency Ventilation
Remote shutdown
Containment Spray
ML23067A16429 December 2022CallawayTechnical Specifications, Chapter 5, Administrative ControlsSteam Generator
Reactor Coolant System
Residual Heat Removal
Control Room Emergency Ventilation
Emergency Core Cooling System
Control Room Envelope
Containment Spray
ML23067A17529 December 2022CallawayRev. 18 to Technical Specification, Bases Change, Chapter 3.3, InstrumentationSteam Generator
Reactor Coolant System
Feedwater
Service water
Main Steam Isolation Valve
Auxiliary Feedwater
Main Turbine
Residual Heat Removal
Control Room Emergency Ventilation
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Rod
Main Steam
Containment Spray
ML23067A18529 December 2022CallawayRev. 18 to Technical Specification, Bases Change, Chapter B 3.9, Refueling OperationsReactor Coolant System
Service water
Reactor Pressure Vessel
Residual Heat Removal
Emergency Core Cooling System
Decay Heat Removal
Control Rod
ML22363A19429 December 202299902078
05200050
LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 16, Technical Specifications, Revision 0Steam Generator
Reactor Coolant System
Feedwater
Shutdown Cooling
Reactor Pressure Vessel
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Control Rod
ML22305A69928 December 2022ByronIssuance of Amendment Nos. 231 and 231 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1Steam Generator
ML21242A21621 December 2022Diablo CanyonIssuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261Steam Generator
Reactor Coolant System
Feedwater
Reactor Protection System
Main Steam Isolation Valve
Auxiliary Feedwater
Residual Heat Removal
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Control Rod
Containment Spray
AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring15 December 2022CookReport Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux MonitoringIntermediate Range Monitor
ML22336A0388 December 2022CatawbaPresentation Slides December 8, 2022, pre-submittal Meeting to Discuss Proposed License Amendment Request Regarding TS 3.7.11, Control Room Area Chilled Water System (Cracws)Steam Generator
Reactor Coolant System
ML22341A6137 December 2022Palo VerdeApplication to Revise Technical Specifications to Adopt TSTF-107- a, Separate Control Rods That Are Untrippable Versus InoperableEmergency Core Cooling System
Control Rod
L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2 December 2022Prairie IslandApplication to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)Steam Generator
Reactor Coolant System
Reactor Pressure Vessel
ML22340A20230 November 2022CookTechnical Specifications Bases, List of Effective PagesSteam Generator
Reactor Coolant System
Feedwater
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Primary containment
Main Transformer
Main Turbine
Residual Heat Removal
Control Room Emergency Ventilation
Circulating Water System
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Main Condenser
Control Rod
Main Steam
Containment Spray
ML22340A16530 November 2022CookTechnical Requirements Manual and Technical Requirements Manual Bases, List of Effective Pages (Unit 1)Steam Generator
Reactor Coolant System
Feedwater
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Shutdown Cooling
HVAC
Reactor Pressure Vessel
Control Room Emergency Ventilation
Remote shutdown
Steam Jet Air Ejector
Emergency Core Cooling System
Containment Spray
ML22340A16030 November 2022CookTechnical Specifications Bases, List of Effective PagesSteam Generator
Reactor Coolant System
Feedwater
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Primary containment
Main Transformer
Main Turbine
Residual Heat Removal
Control Room Emergency Ventilation
Circulating Water System
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Main Condenser
Control Rod
Main Steam
Containment Spray
ML22340A13230 November 2022CookTechnical Requirements Manual and Technical Requirements Manual Bases, List of Effective Pages (Unit 2)Steam Generator
Reactor Coolant System
Feedwater
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Shutdown Cooling
HVAC
Reactor Pressure Vessel
Control Room Emergency Ventilation
Remote shutdown
Steam Jet Air Ejector
Emergency Core Cooling System
Containment Spray
ML22318A19921 November 2022CookSummary of November 7, 2022, Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2
PMNS20221117, Pre-Application Meeting Regarding Neutron Flux Channels3 November 2022CookPre-Application Meeting Regarding Neutron Flux Channels
RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)1 November 2022RobinsonTechnical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)
ML22326A11631 October 2022Vogtle4 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 3 of 3) and Chapter 7, Instrumentation and Controls (Part 1 of 2)Steam Generator
Reactor Coolant System
Feedwater
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Emergency Response Data System
Safety Parameter Display System
HVAC
Residual Heat Removal
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Control Rod
Main Steam
Containment Spray
ND-22-0831, (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 131 October 2022Vogtle(Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 1Steam Generator
Reactor Coolant System
Feedwater
Residual Heat Removal
Automatic Depressurization System
Control Rod
1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation31 October 2022Arkansas NuclearApplication to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump OperationSteam Generator
Reactor Coolant System
Feedwater
Reactor Protection System
Main Turbine
Emergency Core Cooling System
Decay Heat Removal
Control Rod
ML22276A16124 October 2022Watts Bar
Sequoyah
Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsSteam Generator
Emergency Diesel Generator
Safety Parameter Display System
NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC14 October 2022Vogtle
Farley
Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOCSteam Generator
Reactor Coolant System
Emergency Diesel Generator
Emergency Core Cooling System
Control Rod
Containment Spray
ML22263A41820 September 2022Davis BesseEnclosure F - DBNPS, Unit 1, Technical Specification Bases, Rev. 32Steam Generator
Reactor Coolant System
Feedwater
Secondary containment
Service water
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Primary containment
Main Transformer
Main Turbine
Shutdown Cooling
Reactor Pressure Vessel
Residual Heat Removal
Control Room Emergency Ventilation
Shield Building
Fuel Pool Cooling and Cleanup
Circulating Water System
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Control Rod
Main Steam
Containment Spray
WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report29 August 2022Wolf CreekTechnical Specification 5.6.8 - Post Accident Monitoring (PAM) Report
ML22220A19910 August 2022VogtleAttachment 1 - NUREG-2194, Vol. 1, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 Plants, Volume 1, SpecificationsSteam Generator
Reactor Coolant System
Feedwater
Main Steam Isolation Valve
Reactor Pressure Vessel
Residual Heat Removal
Shield Building
Automatic Depressurization System
Main Steam Safety Valve
Remote shutdown
Main Steam Line
Control Room Envelope
Control Rod
Main Steam
RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.10 August 2022Calvert Cliffs
Byron
Braidwood
Ginna
R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.Steam Generator
Reactor Coolant System
Emergency Core Cooling System
Main Steam Line
ML22220A20010 August 2022VogtleAttachment 2 - NUREG-2194, Vol. 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 Plants. Volume 2, BasesSteam Generator
Reactor Coolant System
Feedwater
Service water
Main Steam Isolation Valve
Primary containment
Main Turbine
Shutdown Cooling
HVAC
Reactor Pressure Vessel
Residual Heat Removal
Shield Building
Fuel Pool Cooling and Cleanup
Automatic Depressurization System
Circulating Water System
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Main Condenser
Control Rod
Main Steam
RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)9 August 2022RobinsonTechnical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)
ML22215A2392 August 2022Summer(VCSNS) Unit 1, Special Report 2022-003-01, Inoperable Radiation Monitoring Instrumentation Channel
ML22166A38928 July 2022Prairie IslandIssuance of Amendments 239 and 227 24-Month Operating CycleSteam Generator
Reactor Coolant System
Feedwater
Residual Heat Removal
Emergency Core Cooling System
Containment Spray
IR 05000456/202200226 July 2022BraidwoodIntegrated Inspection Report 05000456/2022002; 05000457/2022002; and 07200073/2022001Reactor Coolant System
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Residual Heat Removal
ML22199A27715 July 2022Three Mile IslandE-mail Attachment: Federal Register Notice - Volume 87Steam Generator
Reactor Coolant System
Shutdown Cooling
Residual Heat Removal
Intermediate Range Monitor
CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)13 July 2022Watts Bar
Sequoyah
Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)Steam Generator
Emergency Diesel Generator
ML22175A01929 June 2022Monthly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date July 15, 2022Steam Generator
Shutdown Cooling
Residual Heat Removal
Intermediate Range Monitor
RA-22-0121, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of29 June 2022OconeeSubmittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of CoSteam Generator
Reactor Coolant System
Feedwater
Service water
Reactor Protection System
Main Turbine
HVAC
Residual Heat Removal
Circulating Water System
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Main Condenser
Control Rod
Main Steam
Emergency Feedwater System
ML22046A23321 June 2022CookIssuance of Amendment Nos. 360 and 342 Regarding Change to the Technical Specification Requirement for Containment Water Level InstrumentationSteam Generator
Reactor Coolant System
Auxiliary Feedwater
Emergency Core Cooling System
Containment Spray
ML22179A14815 June 2022VogtleTechnical Specifications Bases, Revision 70Steam Generator
Reactor Coolant System
Feedwater
Service water
Reactor Protection System
Main Steam Isolation Valve
Primary containment
Main Turbine
Shutdown Cooling
HVAC
Reactor Pressure Vessel
Residual Heat Removal
Shield Building
Fuel Pool Cooling and Cleanup
Automatic Depressurization System
Circulating Water System
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Main Condenser
Control Rod
Main Steam
ML22153A1772 June 2022CallawayAttachment 1 - Marked-Up Existing Technical SpecificationsReactor Coolant System
Emergency Core Cooling System
Control Rod
ML22144A12718 May 2022Beaver ValleyRev. 43 to Technical Specification BasesSteam Generator
Reactor Coolant System
Feedwater
Service water
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Main Transformer
Main Turbine
Shutdown Cooling
Residual Heat Removal
Control Room Emergency Ventilation
Fuel Pool Cooling and Cleanup
Circulating Water System
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Main Condenser
Control Rod
Main Steam
Containment Spray
WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual11 May 2022Watts BarPeriodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements ManualSteam Generator
Reactor Coolant System
Feedwater
Secondary containment
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Main Turbine
HVAC
Auxiliary Building Gas Treatment System
Residual Heat Removal
Control Room Emergency Ventilation
Shield Building
Main Steam Safety Valve
Remote shutdown
Emergency Gas Treatment System
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Main Condenser
Control Rod
Main Steam
Containment Spray
LR-N22-0043, Core Operating Limits Report - Cycle 299 May 2022SalemCore Operating Limits Report - Cycle 29Reactor Coolant System
Control Rod
ML22129A1329 May 2022Sequoyah10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary ReportSteam Generator
Feedwater
Main Turbine
Residual Heat Removal
Emergency Gas Treatment System
Emergency Core Cooling System
Containment Spray
ML22077A1342 May 2022Beaver ValleyIssuance of Amendment Nos. 314 and 204 Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsSteam Generator
Reactor Coolant System
Main Steam Line
ML22102A0122 May 2022CookIssuance of Amendment Nos. 359 and 340 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsSteam Generator
Control Room Emergency Ventilation
Emergency Core Cooling System
ML22118B14328 April 2022GinnaSupplemental Information No. 2 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSteam Generator
Reactor Coolant System
Feedwater
Service water
Main Steam Isolation Valve
Auxiliary Feedwater
Residual Heat Removal
Main Steam Safety Valve
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Main Condenser
Control Rod
Main Steam
Containment Spray
L-PI-22-001, 7 to Updated Safety Analysis Report, Enclosure 4, Bases Changes and License Amendments28 April 2022Prairie Island7 to Updated Safety Analysis Report, Enclosure 4, Bases Changes and License AmendmentsSteam Generator
Reactor Coolant System
Feedwater
Secondary containment
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Primary containment
Main Turbine
Shutdown Cooling
Safety Parameter Display System
Residual Heat Removal
Shield Building
Fuel Pool Cooling and Cleanup
Circulating Water System
Main Steam Safety Valve
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Main Condenser
Control Rod
Main Steam
Containment Spray