Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
LR-N02-0437, Cable Raceway Fire Wrap Resolution Plan31 December 2002Cable Raceway Fire Wrap Resolution PlanSafe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
ML05322050431 December 2002Handwritten Note, Regarding Telephone Conversation and follow-up Letter from Alleger R1-2002-A-0113
ML02364046624 December 2002NRC Ltr Transmitting Certificates Dated 12/24/02
ML05257038123 December 2002E-mail from R. Fuhmeister of NRC to D. Vito of NRC, Regarding Salem Hilti Bolt Issues Relating to ERFBS UpgradesFire Barrier
ML02361034219 December 2002Request for Additional Information - Relief Request S1-RR-A04
ML03002000818 December 2002New Jersey Pollutant Discharge Elimination System Discharge Monitoring ReportsNJPDES
ML05249007417 December 2002Telephone Call Log from 12/17/02 from S. Johnson of NRC
ML05249008017 December 2002E-mail to D. Vilt of NRC, Regarding Salem Accident
ML02350044616 December 2002Salem Generating Station, Units 1 and 2 - Notification of Conduct of a Triennial Fire Protection Baseline InspectionSafe Shutdown
Fitness for Duty
Fire Barrier
Temporary Modification
Emergency Lighting
Fire Protection Program
LR-N02-0419, November 2002 Monthly Operating Report for Salem Unit 113 December 2002November 2002 Monthly Operating Report for Salem Unit 1
ML05249046313 December 2002E-mail from Vito to Schoppy Hc SSW - Unauthorized Installation of Chemistry Monitoring Equipment
LR-N02-0420, November 2002 Monthly Operating Report for Salem Generating Station Unit 213 December 2002November 2002 Monthly Operating Report for Salem Generating Station Unit 2
IR 05000272/200230112 December 2002IR Salem, Units 1 & 2 - Operator and Senior Reactor Operator Initial Exam Rep No. 50-272/02-301 & 50-311/02-301 Dtd 12/12/02
ML05257038512 December 2002E-mail from D. Lew of NRC, Regarding RI-2002-A-0137 - Hilti Bolt Issue at Salem
ML05257012111 December 2002Allegation Review Board Disposition Record, Allegation No. RI-2002-A-0113
ML02345006711 December 2002Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Presssure Boundary Integrity, 15-Day Response for Salem Nuclear Generating Station, Units 1 & 2Boric Acid
ML05322050511 December 2002Allegation Review Board Disposition Record, Regarding Allegation R1-2002-A-0113
ML02352011611 December 2002NRC Exam Notification Ltr Dtd 12/11/02
L-79-002, Allegation Document Regarding RI-2002-A-0137, Preliminary Opinion6 December 2002Allegation Document Regarding RI-2002-A-0137, Preliminary Opinion
ML0234003326 December 2002Memorandum from Emile L. Julian to Recipients of Letter Dated 12/04/02 from Annette L. Vietti-Cook to Norm Cohen Regarding DD-02-03
ML0234003536 December 2002Revised Letter from J. Samuel Walker to Norm Cohen Re DD-02-03
ML0525703873 December 2002E-mail from S. Johnson of NRC to D. Lew of NRC, Regarding ARB Form for Salem 1-2 (RI-2002-A-0137)
TAC:MB59192 December 2002
LR-N02-0409, Core Operating Limits Report - Cycle 16, Revision 02 December 2002Core Operating Limits Report - Cycle 16, Revision 0
ML0233602472 December 2002Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs.Nondestructive Examination
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML05255034127 November 2002Allegations Review Board Disposition Record, Allegation No. RI-2002-A-0132
ML05249008527 November 2002Allegation Review Board Disposition Record, Regarding Allegation No. RI-2002-A-0144
ML05257039027 November 2002Allegation Review Board Disposition Record, Allegation No. RI-2002-A-0137, Salem
TAC:MB609127 November 2002
ML02253035627 November 2002Evaluation of Relief Request S-RR-A06
ML02331065827 November 2002G20020577/LTR-02-0646 - Norman Cohen Ltr Re 2.206 - Salem, Unit No. 2
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02283071527 November 2002Relief Request, Evaluation of Relief Request SC-RR-A01, TAC Nos. MB5569 & MB5570Boric Acid
VT-2
ML02281054027 November 2002Relief Request, Evaluation of Relief Request SC-RR-E01 and SC-RR-L01
ML05257039225 November 2002E-mail from S. Barber of NRC to D. Vito and S. Johnson of NRC, Regarding ARB Forms for Salem/Hope Creek RI-2002-A-0132, RI-2002-A-0137, RI-2002-A-0144
LR-N02-0400, Change to Commitment Regarding 4166 Volt Switchgear Room Suppression25 November 2002Change to Commitment Regarding 4166 Volt Switchgear Room SuppressionFire Protection Program
ML05257038625 November 2002E-mail from S. Barber of NRC to D. Vito and S. Johnson of NRC, Regarding ARB Forms for Salem/Hope Creek RI-2002-A-0132, RI-2002-A-0137 and RI-2002-A-0144
ML02326033622 November 2002RAI, Bulliten 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day ResponseBoric Acid
VT-2
Pressure Boundary Leakage
TAC:MB457322 November 2002
ML05322050720 November 2002Ltr to D. Vito of USNRC, Regarding Safety Concerns with PSEG
ML05257039719 November 2002E-mail from S. Johnson of NRC to J. Linville of NRC, Regarding RI-2002-A-0137 - Salem - Hilti Bolt Issue
ML02290074115 November 2002Holtec International, Request for Withholding Information from Public Disclosure (TAC Nos. MB5488 & MB5489)
ML06059042014 November 2002Continuous Performance Improvement Group Meeting Minutes
LR-N02-0398, October 2002 Monthly Operating Report for Salem Unit 213 November 2002October 2002 Monthly Operating Report for Salem Unit 2
ML05244048613 November 2002E-mail from Letts to Epw Follow-up to a Prior Salem Concern
IR 05000272/200200713 November 2002IR 05000272-02-007, 05000311-02-007, Public Service Electric Gas Nuclear LLC, Salem Units 1 & 2, on 6/30 - 9/30/02, Fire Protection, Emergent Work, Operability Determinations and Surveillance TestingSafe Shutdown
High Radiation Area
Fire Barrier
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Biofouling
Fire Protection Program
Operability Assessment
ML05257013413 November 2002E-mail from R. Lorson of NRC, Regarding follow-up to a Prior Salem Concern
ML05322040713 November 2002E-Mail from R. Lorson of USNRC to B. Letts, D. Vito, G. Meyer, J. Schoppy, and S. Barber of USNRC, Regarding Follow-up to a Prior Salem Concern
LR-N02-0397, October 2002 Monthly Operating Report for Salem Unit 113 November 2002October 2002 Monthly Operating Report for Salem Unit 1