Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
LR-N02-0437, Cable Raceway Fire Wrap Resolution Plan | 31 December 2002 | Cable Raceway Fire Wrap Resolution Plan | Safe Shutdown Fire Barrier Emergency Lighting Fire Protection Program |
ML053220504 | 31 December 2002 | Handwritten Note, Regarding Telephone Conversation and follow-up Letter from Alleger R1-2002-A-0113 | |
ML023640466 | 24 December 2002 | NRC Ltr Transmitting Certificates Dated 12/24/02 | |
ML052570381 | 23 December 2002 | E-mail from R. Fuhmeister of NRC to D. Vito of NRC, Regarding Salem Hilti Bolt Issues Relating to ERFBS Upgrades | Fire Barrier |
ML023610342 | 19 December 2002 | Request for Additional Information - Relief Request S1-RR-A04 | |
ML030020008 | 18 December 2002 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Reports | NJPDES |
ML052490074 | 17 December 2002 | Telephone Call Log from 12/17/02 from S. Johnson of NRC | |
ML052490080 | 17 December 2002 | E-mail to D. Vilt of NRC, Regarding Salem Accident | |
ML023500446 | 16 December 2002 | Salem Generating Station, Units 1 and 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection | Safe Shutdown Fitness for Duty Fire Barrier Temporary Modification Emergency Lighting Fire Protection Program |
LR-N02-0419, November 2002 Monthly Operating Report for Salem Unit 1 | 13 December 2002 | November 2002 Monthly Operating Report for Salem Unit 1 | |
ML052490463 | 13 December 2002 | E-mail from Vito to Schoppy Hc SSW - Unauthorized Installation of Chemistry Monitoring Equipment | |
LR-N02-0420, November 2002 Monthly Operating Report for Salem Generating Station Unit 2 | 13 December 2002 | November 2002 Monthly Operating Report for Salem Generating Station Unit 2 | |
IR 05000272/2002301 | 12 December 2002 | IR Salem, Units 1 & 2 - Operator and Senior Reactor Operator Initial Exam Rep No. 50-272/02-301 & 50-311/02-301 Dtd 12/12/02 | |
ML052570385 | 12 December 2002 | E-mail from D. Lew of NRC, Regarding RI-2002-A-0137 - Hilti Bolt Issue at Salem | |
ML052570121 | 11 December 2002 | Allegation Review Board Disposition Record, Allegation No. RI-2002-A-0113 | |
ML023450067 | 11 December 2002 | Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Presssure Boundary Integrity, 15-Day Response for Salem Nuclear Generating Station, Units 1 & 2 | Boric Acid |
ML053220505 | 11 December 2002 | Allegation Review Board Disposition Record, Regarding Allegation R1-2002-A-0113 | |
ML023520116 | 11 December 2002 | NRC Exam Notification Ltr Dtd 12/11/02 | |
L-79-002, Allegation Document Regarding RI-2002-A-0137, Preliminary Opinion | 6 December 2002 | Allegation Document Regarding RI-2002-A-0137, Preliminary Opinion | |
ML023400332 | 6 December 2002 | Memorandum from Emile L. Julian to Recipients of Letter Dated 12/04/02 from Annette L. Vietti-Cook to Norm Cohen Regarding DD-02-03 | |
ML023400353 | 6 December 2002 | Revised Letter from J. Samuel Walker to Norm Cohen Re DD-02-03 | |
ML052570387 | 3 December 2002 | E-mail from S. Johnson of NRC to D. Lew of NRC, Regarding ARB Form for Salem 1-2 (RI-2002-A-0137) | |
TAC:MB5919 | 2 December 2002 | ||
LR-N02-0409, Core Operating Limits Report - Cycle 16, Revision 0 | 2 December 2002 | Core Operating Limits Report - Cycle 16, Revision 0 | |
ML023360247 | 2 December 2002 | Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs. | Nondestructive Examination |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML052550341 | 27 November 2002 | Allegations Review Board Disposition Record, Allegation No. RI-2002-A-0132 | |
ML052490085 | 27 November 2002 | Allegation Review Board Disposition Record, Regarding Allegation No. RI-2002-A-0144 | |
ML052570390 | 27 November 2002 | Allegation Review Board Disposition Record, Allegation No. RI-2002-A-0137, Salem | |
TAC:MB6091 | 27 November 2002 | ||
ML022530356 | 27 November 2002 | Evaluation of Relief Request S-RR-A06 | |
ML023310658 | 27 November 2002 | G20020577/LTR-02-0646 - Norman Cohen Ltr Re 2.206 - Salem, Unit No. 2 | |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML022830715 | 27 November 2002 | Relief Request, Evaluation of Relief Request SC-RR-A01, TAC Nos. MB5569 & MB5570 | Boric Acid VT-2 |
ML022810540 | 27 November 2002 | Relief Request, Evaluation of Relief Request SC-RR-E01 and SC-RR-L01 | |
ML052570392 | 25 November 2002 | E-mail from S. Barber of NRC to D. Vito and S. Johnson of NRC, Regarding ARB Forms for Salem/Hope Creek RI-2002-A-0132, RI-2002-A-0137, RI-2002-A-0144 | |
LR-N02-0400, Change to Commitment Regarding 4166 Volt Switchgear Room Suppression | 25 November 2002 | Change to Commitment Regarding 4166 Volt Switchgear Room Suppression | Fire Protection Program |
ML052570386 | 25 November 2002 | E-mail from S. Barber of NRC to D. Vito and S. Johnson of NRC, Regarding ARB Forms for Salem/Hope Creek RI-2002-A-0132, RI-2002-A-0137 and RI-2002-A-0144 | |
ML023260336 | 22 November 2002 | RAI, Bulliten 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response | Boric Acid VT-2 Pressure Boundary Leakage |
TAC:MB4573 | 22 November 2002 | ||
ML053220507 | 20 November 2002 | Ltr to D. Vito of USNRC, Regarding Safety Concerns with PSEG | |
ML052570397 | 19 November 2002 | E-mail from S. Johnson of NRC to J. Linville of NRC, Regarding RI-2002-A-0137 - Salem - Hilti Bolt Issue | |
ML022900741 | 15 November 2002 | Holtec International, Request for Withholding Information from Public Disclosure (TAC Nos. MB5488 & MB5489) | |
ML060590420 | 14 November 2002 | Continuous Performance Improvement Group Meeting Minutes | |
LR-N02-0398, October 2002 Monthly Operating Report for Salem Unit 2 | 13 November 2002 | October 2002 Monthly Operating Report for Salem Unit 2 | |
ML052440486 | 13 November 2002 | E-mail from Letts to Epw Follow-up to a Prior Salem Concern | |
IR 05000272/2002007 | 13 November 2002 | IR 05000272-02-007, 05000311-02-007, Public Service Electric Gas Nuclear LLC, Salem Units 1 & 2, on 6/30 - 9/30/02, Fire Protection, Emergent Work, Operability Determinations and Surveillance Testing | Safe Shutdown High Radiation Area Fire Barrier Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Operability Determination Biofouling Fire Protection Program Operability Assessment |
ML052570134 | 13 November 2002 | E-mail from R. Lorson of NRC, Regarding follow-up to a Prior Salem Concern | |
ML053220407 | 13 November 2002 | E-Mail from R. Lorson of USNRC to B. Letts, D. Vito, G. Meyer, J. Schoppy, and S. Barber of USNRC, Regarding Follow-up to a Prior Salem Concern | |
LR-N02-0397, October 2002 Monthly Operating Report for Salem Unit 1 | 13 November 2002 | October 2002 Monthly Operating Report for Salem Unit 1 |