LR-N02-0419, November 2002 Monthly Operating Report for Salem Unit 1
| ML023600201 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 12/13/2002 |
| From: | Waldinger L Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N02-0419 | |
| Download: ML023600201 (3) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 DEC 1 3 2001 LR-N02-0419 0 PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for November 2002 are being forwarded.
Sincerely, Lon Waldinger Operations Director RAR Attachments C Distribution 95-2168 REV 7199
.'veý
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 12/9/02 F. Todd (856) 339-1316 Reporting Period November 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-aate Uumulative 588 7216 141444 562 7111 136807 0
0 0
582479 7787250 1139070648 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONI F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 2 1111102 S
138-C 4
1R15 Refueling Outage 1116102 3
11112102 F
20 B
2 Feed Pump trip due to work on CN27.
11113102 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 12/9/02 R. Ritzman (856) 339-1445 Summary Of Monthly Ooeratina Experience
"* Salem 1 entered the month in a refueling outage, which was completed on November 6.
" On November 12, Salem 1 entered a forced outage due to a plant trip caused by the loss of a feed pump. The unit was placed back on line on November 13, returning to 100% power on the November 14.
"* At the end of the month, Salem 1 completed 17 days of continuous on-line operation.