LR-N02-0419, November 2002 Monthly Operating Report for Salem Unit 1

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Salem Unit 1
ML023600201
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/13/2002
From: Waldinger L
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N02-0419
Download: ML023600201 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 DEC 1 3 2001 LR-N02-0419 0 PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for November 2002 are being forwarded.

Sincerely, Lon Waldinger Operations Director RAR Attachments C Distribution 95-2168 REV 7199

.'veý

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-272 Salem 1 12/9/02 F. Todd (856) 339-1316 Reporting Period November 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-aate Uumulative 588 7216 141444 562 7111 136807 0

0 0

582479 7787250 1139070648 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONI F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 2 1111102 S

138-C 4

1R15 Refueling Outage 1116102 3

11112102 F

20 B

2 Feed Pump trip due to work on CN27.

11113102 (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-272 Salem 1 12/9/02 R. Ritzman (856) 339-1445 Summary Of Monthly Ooeratina Experience

"* Salem 1 entered the month in a refueling outage, which was completed on November 6.

" On November 12, Salem 1 entered a forced outage due to a plant trip caused by the loss of a feed pump. The unit was placed back on line on November 13, returning to 100% power on the November 14.

"* At the end of the month, Salem 1 completed 17 days of continuous on-line operation.