PSEG Nuclear LLC P.O Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 3 2002 LR-N02-0397 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit I Technical Specifications, the operating statistics for October 2002 are being forwarded.
Sincerely, D. F. Garchw Vice President - Operations RAR Attachments C Distribution 95-2168 REV 7/99
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 11/12/02 F. Todd (856) 339-1316 Reporting Period October 2002 I
OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-aate Loumulatve 236 6629 140856 236 6549 136244 0
0 0
225322 7204771 138488169 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 2 10110102 S
509 C
2 IRIS Refueling Outage 10131102 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 11/12/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
"* Salem 1 entered the month at approximately 100% reactor power.
"* On October 6, power was reduced to approximately 68% due to a 500 KV Line Outage.
"* On October 10, the unit was shutdown for a scheduled refueling outage.