October 2002 Monthly Operating Report for Salem Unit 1
ML023250393
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/13/2002
From: Garchow D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N02-0397
Download: ML023250393 (3)


Text

PSEG Nuclear LLC P.O Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 3 2002 LR-N02-0397 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit I Technical Specifications, the operating statistics for October 2002 are being forwarded.

Sincerely, D. F. Garchw Vice President - Operations RAR Attachments C Distribution 95-2168 REV 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-272 Salem 1 11/12/02 F. Todd (856) 339-1316 Reporting Period October 2002 I

OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1130 1096 Month Year-to-aate Loumulatve 236 6629 140856 236 6549 136244 0

0 0

225322 7204771 138488169 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 2 10110102 S

509 C

2 IRIS Refueling Outage 10131102 (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 11/12/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

"* Salem 1 entered the month at approximately 100% reactor power.

"* On October 6, power was reduced to approximately 68% due to a 500 KV Line Outage.

"* On October 10, the unit was shutdown for a scheduled refueling outage.

"* At the end of the month, Salem 1 remained in the refueling outage.