LR-N02-0398, October 2002 Monthly Operating Report for Salem Unit 2
| ML023250395 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 11/13/2002 |
| From: | Garchow D Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N02-0398 | |
| Download: ML023250395 (3) | |
Text
PSEG Nuclear LLC P.O Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 3 2002 LR-N02-0398 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control D6sk Washington, DC 20555 Gentlemen:
MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for October 2002 are being forwarded.
Sincerely, D. F. jGrchow
)
Vice Pr sident - Operations RAR Attachments C Distribution 95-2168 REV 7/99 P
1.
12,
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-311 Salem 2 11/12/02 F. Todd (856) 339-1316 Reporting Period October 2002 I
I OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month Year-to-date Cumulative 745 6239 118952 745 6156 115494 0
0 0
833187 6731302 117552843 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other I - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
I
DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 11/12/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience
"* Salem 2 began the month at 100% reactor power.
"* On October 9, power was reduced due to a 500 KV Line Outage and returned to 100% later that day. On October 10, power was again reduced due to the same 500 KV Line Outage and returned to 100% later that day.
"* At the end of the month, Salem 2 completed 167 days of continuous on line operation.