ML023610342
| ML023610342 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 12/19/2002 |
| From: | Salamon G Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LRN-02-0426 | |
| Download: ML023610342 (4) | |
Text
PSEG Nuclear LLC P 0 Box 236, Hancocks Bridge, New Jersey 08038-0236 DEC 1 9 2002 LRN-02-0426 PSEG United States Nuclear Regulatory Commission NuclearLLC Document Control Desk Washington, DC 20555 SALEM GENERATING STATIONS - UNIT I FACILITY OPERATING LICENSE DPR-70 DOCKET NOS. 50-272 REQUEST FOR ADDITIONAL INFORMATION - RELIEF REQUEST S1-RR-A04 By letter dated July 8, 2002, PSEG Nuclear LLC (PSEG) submitted the subject relief request for Nuclear Regulatory Commission (NRC) approval. The relief request, S1-RR A04, was submitted for the continued use of Code Case N-532-1, Alternative Requirements to Repair and replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-400 and IWA-6000, Section Xl, Division 1.
Subsequent discussions with NRC staff in October 2002 resulted in identifying additional information omitted from the initial relief request. The information requested was the frequency for submittal of the Owner' s Activity Report Form OAR-1 to the regulatory authority. This information has been added and the relief request is re submitted in entirety.
Should you have any questions regarding this request, please contact Mr. Howard Berrick at 856-339-1862.
Sincerel Manager-Nuclear Safety and Licensing
Enclosure:
Relief Request S1-RR-A04 95-2168 REV. 7/99
Document Control Desk LRN 0426 DEC 1 9 2002 C
Mr. H. Miller Regional Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission ATTN-Mr. G. Wunder Licensing Project Manager - Hope Creek Mail Stop 08B1 Washington DC 20555-001 U.S. Nuclear Regulatory Commission ATTN-Mr. R. Fretz Licensing Project Manager - Salem Mail Stop 08B2 Washington DC 20555-001 USNRC Senior Resident Inspector - Salem (X24)
Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering P.O. Box 415 Trenton, NJ 08625 LRN-02-0426 Relief Request: S1-RR-A04 Use of Code Case N-532-1 NRC Approved (Yes or No):
Date:
Ref:
Component Description Repair and replacement documentation requirements and Inservice summary report preparation and submission.
ASME Section Xl Class 1, 2, 3, MC, CC components, and their associated Component Supports.
Code Requirement Articles IWA-4000 and IWA-6000 of the 1995 Edition, including the 1996 Addenda of Section XI.
Basis for Relief Pursuant to 10 CFR 50.55a(a)(3)(i), relief is requested on the basis-that the proposed alternative provides an acceptable level of quality and safety.
PSEG Nuclear, LLC requests the continued use of Code Case N-532-1 during the Third Inspection Interval. This case provides the alternatives to the current ASME Section Xl repair/replacement activity documentation requirements, and regulatory reporting requirements related to Inservice Inspections. It is the intent of PSEG Nuclear LLC to periodically submit the Owner's Activity Report identified by Code Case N-532-1. The Owners Activity Report Form OAR-1 will be completed by PSEG Nuclear, LLC in accordance with Code Case N-532-1 and the OAR-1 will submitted to the regulatory authority within 90 days of outage completion.
The cost effective alternatives afforded by this Code Case have been determined by the ASME to provide an acceptable alternative to existing requirements. The alternatives provide a substantial reduction in the overall administrative burden since each PSEG Nuclear LLC plant is required to meet the requirements of IWA-6000. Further, Code Case N-532-1 does not create any technical changes that would impact the existing ISI programs or the Technical Specifications at Salem (or Hope Creek), and does not introduce a condition that would compromise existing levels of safety or quality.
Relief has been previously granted (RR-AI) to utilize Code Case N-532 at Salem Generating Station, Units 1 & 2, as well as for Hope Creek Generating Station.
Reference:
NRC Safety Evaluation for Relief Request for the Implementation of Code Case N-532, TAC Nos.: M94067, M94068 & M94069, respectively.
Resubmit Si-RR-A04 reviewed.doc Enclosure Page I 12/19/2002
LRN-02-0426 Relief Request: S1-RR-A04 Use of Code Case N-532-1 Alternate Requirements PSEG Nuclear, LLC proposes to implement the alternative requirements of Code Case N-532-1. An Owners Activity Report Form OAR-1 will be prepared and certified upon completion of each refueling outage. The OAR-1 will submitted to the regulatory authority within 90 days of outage completion.
Applicability This Relief Request is applicable to:
Salem, Unit I - Third Ten-Year Interval Inservice Inspection Program.
ResubmitSI -RR-A04 reviewed.doc Enclosure Page 2 12/19/2002