ML052570381

From kanterella
Jump to navigation Jump to search
E-mail from R. Fuhmeister of NRC to D. Vito of NRC, Regarding Salem Hilti Bolt Issues Relating to ERFBS Upgrades
ML052570381
Person / Time
Site: Salem  
Issue date: 12/23/2002
From: Fuhrmeister R
NRC Region 1
To: Vito D
NRC Region 1
References
FOIA/PA-2004-0314
Download: ML052570381 (1)


Text

Sharon Johnson - Salem Hilti Bolt Issues Relating to ERFBS Ugrades Page 1 From:

Roy Fuhrmeister I -5 To:

David Vito Date:

12/23102 4:20PM

Subject:

Salem Hilti Bolt Issues Relating to ERFBS Upgrades Reviewing the information provided in the allegation revealed no new information on Hilti Bolt capabilities.

The individual merely provided the Part 21 and Generic Communications (such as Information Notices) materials which are available on the NRC web page.

The specific details of the replacement electrical raceway fire barrier system (ERFBS) will be reviewed during the triennial fire protection inspection to be conducted in February '03. We wiT be reviewing the seismic and missle evaluations of the ERFBS, as well as the fire test data.

Roy L. Fuhrmeister CC:

Glenn Meyer, James Linville; Raymond Lorson; Sharon Johnson rtO wd Cos.kA'W (\\eA fS.

1AlL tf(114 l63 4 ^4~,

noed adht 4ca C04-ac ar 1,,t Li te l

H 145 Id Ad Ai WA k 11 Atljy A

Ai-i a

hle Ad t4 tkQ By a4Wq Ofka4 cod

<2 f

Lo k I