ML22362A071 | 28 December 2022 | Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report Numbers 05000341/2023010 | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Fire impairment Job Performance Measure Large early release frequency Fire Protection Program |
NRC-2022-0063, Comment (3) of Glenda Patzsch-Velasquez on Performance-Based Containment Leak Test Program | 19 December 2022 | Comment (3) of Glenda Patzsch-Velasquez on Performance-Based Containment Leak Test Program | |
NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | 16 December 2022 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | Safe Shutdown Time of Discovery Stroke time Surveillance Frequency Control Program Offsite Circuit |
NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums | 29 November 2022 | DTE Electric Company - Guarantee of Payment of Deferred Premiums | |
ML22322A108 | 18 November 2022 | Confirmation of Initial License Examination | |
ML22325A124 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides | Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Coatings Nondestructive Examination Cyber Security Condition Adverse to Quality Surveillance Frequency Control Program Excess Flow Check Valve Safeguards Contingency Plan Earthquake Turbine Missile Pressure Boundary Leakage Grace period Unidentified leakage |
NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 | 17 November 2022 | Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 | |
ML22325A154 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Figures (for Public Use) | |
ML22325A147 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures | Aging Management |
ML22325A146 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | Fitness for Duty Offsite Dose Calculation Manual Commercial Grade Dedication Probabilistic Risk Assessment Coatings Nondestructive Examination Emergency Lighting Condition Adverse to Quality Process Control Program Pandemic Fire Protection Program Grace period |
ML22325A145 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML22325A144 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Loop seal Grab sample Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Annual Radioactive Effluent Release Report Process Control Program Earthquake Hardened vent Power Uprate Measurement Uncertainty Recapture |
ML22325A143 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Fitness for Duty Process Control Program Safeguards Contingency Plan Fire Protection Program Grace period |
ML22325A142 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics | Safe Shutdown Ultimate heat sink Grab sample Hydrostatic Finite Element Analysis Earthquake Recently irradiated fuel |
ML22325A138 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Reactor Vessel Water Level Grab sample Stroke time Anticipated operational occurrence Weld Overlay Hydrostatic Operating Basis Earthquake Multiple Spurious Operation Abnormal operational transient Pressure and Temperature Limits Report Feedwater Controller Failure License Renewal Earthquake Fuel cladding Liquid penetrant Pressure boundary leak Dissimilar Metal Weld Unidentified leakage Unidentified leak Power Uprate |
ML22325A136 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities | High Radiation Area Fire Barrier Anticipated operational occurrence Coatings VT-2 Condition Adverse to Quality Aging Management Surveillance Frequency Control Program Moisture barrier License Renewal Earthquake Control of Heavy Loads Biofouling EVT-1 Liquid penetrant Fire Protection Program Dissimilar Metal Weld Power Uprate Measurement Uncertainty Recapture |
ML22325A135 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Hot Short Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Squib Emergency Lighting Incorporated by reference Test box Abnormal operational transient Scram Discharge Volume Overtravel Earthquake Fuel cladding Pressure Boundary Leakage Pressure boundary leak Unidentified leakage |
ML22325A134 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Hot Short Safe Shutdown High winds Ultimate heat sink Grab sample Fire Barrier Tornado Missile Hydrostatic Coatings Emergency Lighting FLEX Spent Fuel Pool Instrumentation Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Liquid penetrant Fire Protection Program Fire Watch Early Warning Fire Detection Scaffolding Power Uprate |
ML22325A133 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Feedwater Controller Failure Earthquake Turbine Missile Power change Coast down |
ML22325A132 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Abnormal operational transient Feedwater Controller Failure Earthquake Fuel cladding Recently irradiated fuel Fire Protection Program Power change Power Uprate Measurement Uncertainty Recapture Failure to Scram |
ML22325A131 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Grab sample Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Finite Element Analysis Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Overtravel Earthquake Fuel cladding Power change |
ML22325A130 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Reactor Vessel Water Level Ultimate heat sink Grab sample Stroke time Water Inventory Control Hydrostatic Coatings Nondestructive Examination Emergency Lighting FLEX Scram Discharge Volume MELLLA Excess Flow Check Valve Earthquake Hardened vent Fuel cladding GOTHIC Power Uprate Measurement Uncertainty Recapture |
ML22325A129 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Main Page | |
ML22325A125 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | Safe Shutdown Ultimate heat sink Fire Barrier Stroke time Tornado Missile Temporary Modification Emergency Lighting Open Phase Condition Earthquake Turbine Missile |
ML22325A127 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Stroke time Hydrostatic Squib Emergency Lighting Scram Discharge Volume |
ML22325A126 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Coatings Power Uprate Measurement Uncertainty Recapture |
ML22325A139 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | Safe Shutdown Ultimate heat sink Non-Destructive Examination Grab sample Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Emergency Lighting Finite Element Analysis FLEX Tornado-Generated Missile Tornado Generated Missile Abnormal operational transient Tornado Missile Protection Design basis earthquake Scram Discharge Volume TORMIS Earthquake Hardened vent Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Power change |
NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report | 14 November 2022 | Submittal of Biennial Review of the Fermi 1 Safety Analysis Report | |
ML22307A125 | 9 November 2022 | Summary of October 19, 2022, Teleconference Meeting with DTE Electric Company Regarding Proposed License Amendment Pertaining to the Emergency Core Cooling System Strainer Performance Evaluation for Fermi 2 | |
ML22313A103 | 9 November 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 | Safe Shutdown Packing leak Condition Adverse to Quality Significance Determination Process Large early release frequency |
IR 05000341/2022003 | 8 November 2022 | Integrated Inspection Report 05000341/2022003 | Past operability Nondestructive Examination Temporary Modification Functionality Assessment Significance Determination Process Process Control Program Operability Determination Fire Protection Program Downpower Operability Assessment |
IR 05000016/2022001 | 8 November 2022 | NRC Inspection Report No. 05000016/2022001(DRSS) - Enrico Fermi Atomic Power Plant, Unit 1 | |
IR 05000341/2022420 | 1 November 2022 | Security Baseline Inspection Report 05000341/2022420 | Affidavit |
ML22301A174 | 28 October 2022 | Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) | |
IR 05000341/2022501 | 17 October 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000341/2022501 | |
ML22285A101 | 13 October 2022 | Enrico Fermi Atomic Power Plant, Unit 1 - NRC Analysis of DTE Electric Company'S Decommissioning Funding Status Report (Docket No. 50-016) | |
ML22305A550 | 13 October 2022 | News Release-III-22-024: NRC Names New Inspector at Fermi Nuclear Power Plant | New Resident Inspector |
ML22314A049 | 10 October 2022 | DTE Electric Company Submittal of Fermi 3 Periodic Reports | |
NRC-22-0041, Evacuation Time Estimate Report | 5 October 2022 | Evacuation Time Estimate Report | Pandemic Coronavirus |
PMNS20221029, Preapplication Meeting with DTE Electric Company to Discuss a Planned License Amendment Request for Fermi 2 Regarding the Emergency Core Cooling System Strainer Performance Evaluation for Fermi 2 | 5 October 2022 | Preapplication Meeting with DTE Electric Company to Discuss a Planned License Amendment Request for Fermi 2 Regarding the Emergency Core Cooling System Strainer Performance Evaluation for Fermi 2 | |
ML22216A006 | 31 August 2022 | ECCS Strainer LAR Pre-Submittal Presentation Material | Probabilistic Risk Assessment Coatings Large early release frequency Exemption Request |
NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 | 29 August 2022 | Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 | |
ML22241A062 | 29 August 2022 | NRR E-mail Capture - Fermi 2: Acceptance Review of LAR Regarding Adoption of TSTF-582 | |
IR 05000341/2022005 | 25 August 2022 | Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2022005) | Commercial Grade Dedication Exemption Request Coronavirus |
NRC-22-0030, Inservice Inspection Summary Report | 10 August 2022 | Inservice Inspection Summary Report | |
NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 4 August 2022 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level High Radiation Area Stroke time Water Inventory Control Operating Basis Earthquake Squib Qualified Offsite Circuit Surveillance Frequency Control Program Excess Flow Check Valve Control of Heavy Loads Power Operated Valves Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
IR 05000341/2022002 | 4 August 2022 | Integrated Inspection Report 05000341/2022002 | Safe Shutdown Half scram Hydrostatic Past operability Enforcement Discretion Squib Functionality Assessment Significance Determination Process Operability Determination TORMIS Fire Protection Program Fire Watch Downpower Unidentified leakage |
ML22188A089 | 21 July 2022 | Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System | Open Phase Condition |
ML22187A125 | 6 July 2022 | Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000341/2022004 | Ultimate heat sink Temporary Modification Flow Induced Vibration |
ML22144A105 | 24 May 2022 | Summary of Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Fermi | Open House |