Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07355046721 December 2007Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss FENOC Fleet Wide Performance
ML07354037919 December 2007Change to the Inspection Plan 1/1/08 - 12/31/08
IR 05000440/20074057 December 2007IR 05000440-07-405(DRS); 10/22/2007 - 10/26/2007; Perry Nuclear Power Plant; Routine Security Baseline InspectionSignificance Determination Process
PNO-III-07-015, A: Perry, Update to Scram at Perry Nuclear Power Station and Feedwater Loss6 December 2007PNO-III-07-015A: Perry, Update to Scram at Perry Nuclear Power Station and Feedwater Loss
Press Release-III-07-026, NRC Begins Special Inspection at Perry Plant Due to a Scram and Feedwater Problems29 November 2007Press Release-III-07-026: NRC Begins Special Inspection at Perry Plant Due to a Scram and Feedwater Problems
ML07332126928 November 2007PNO-III-07-015: Scram at Perry Nuclear Power Station and Feedwater Loss
L-07-138, Actions Required by Confirmatory Order EA-07-19926 November 2007Actions Required by Confirmatory Order EA-07-199Boric Acid
ML0732009829 November 2007NPDES Monthly Report Forms for the Month of October 2007
ML0731002481 November 2007Comment (2) of Todd a Henderson on Behalf of Firstenergy Nuclear Operating Company (FENOC) on Energy Solutions PRM-50-88 Re to Amend 10 CFR 50.82., Termination of License
ML07352053928 October 2007LTR-07-0819 - Ltr. Tom Gurdziel, Concerns New Generation of Nuclear Plants
ML07310036626 October 2007NPDES Monthly Report Station Code 004, Point Representative of DischargeGrab sample
IR 05000440/200700426 October 2007High Radiation Area
Fire Barrier
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Zebra Mussel
Significance Determination Process
Process Control Program
Operability Determination
Fire Protection Program
Power change
Downpower
Unidentified leakage
Siren
Overexposure
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
IR 05000263/200700623 October 2007IR 05000263-07-006(DRS); 08/27/2007 Through 09/14/2007; Perry Nuclear Power Plant. Routine Engineering Baseline InspectionSafe Shutdown
Time of Discovery
ML07278038718 October 2007Joseph J. Hagan Ltr. Acknowledgement of Receipt of Response Letters Required by Confirmatory Order
ML07291022212 October 2007Submittal of Technical Specification Bases, Revision 6Safe Shutdown
Scram Discharge Volume
Fuel cladding
Offsite Circuit
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML0729102679 October 2007Submittal of NPDES Monthly Report Forms for the Month of September 2007Grab sample
L-80-030, Request for Technical Assistance, Resolution of the Impact of Air Handler Unavailability on Technical Specification Equipment Based on Interpretation of GL 80-30 Dated April 10, 1980 and NRC Letter to Perry, Dated April 05, 20024 October 2007Request for Technical Assistance, Resolution of the Impact of Air Handler Unavailability on Technical Specification Equipment Based on Interpretation of GL 80-30 Dated April 10, 1980 and NRC Letter to Perry, Dated April 05, 2002Probabilistic Risk Assessment
ML07275053224 September 2007Letter Regarding an Occurrence That Was Reportable in Accordance with the Ohio Environmental Protection Agency (Oepa) Permit No. 3IB00016*IDTime of Discovery
IR 05000440/200730220 September 2007Er 05000440-07-302, on 08/15/2007, Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report
IR 05000440/200700820 September 2007IR 05000440-07-008, on 8/16/2007 - 8/23/2007, Perry Nuclear Power Plant, Supplemental Inspection; Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area.Mission time
TAC:MD682918 September 2007
ML07268085218 September 2007License Amendment Request Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Incorporated by reference
Preplanned Activity
Recently irradiated fuel
L-07-121, Cynthia Carpenter Ltr. Actions Required by Confirmatory Order EA-07-19913 September 2007Cynthia Carpenter Ltr. Actions Required by Confirmatory Order EA-07-199
ML07263016110 September 2007NPDES Monthly Report Forms for August 2007Grab sample
ML0726106957 September 2007Report of Facility Changes, Tests and Experiments for 09/09/2005 to PresentReactor Vessel Water Level
Control of Heavy Loads
ML0725505475 September 2007License Amendment Request to Revise Technical Specification 3.6.1, 3.6.4, and 3.6.5 for Containment and Drywell Isolation DeviceHigh Radiation Area
Hydrostatic
Emergency Lighting
Recently irradiated fuel
ML07243007631 August 20078/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan
ML07248060824 August 2007Semiannual Fitness-For-Duty Report for January-June 2007Fitness for Duty
NEI 06-04, Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant21 August 2007Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant
ML07232038121 August 2007Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant
ML07235012917 August 2007Voluntary Response to NRC Regulatory Issue Summary 2007-17: Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML07226053515 August 2007Confirmatory Order (Effective Immediately) Firstenergy Nuclear Operating Company
ML07227025715 August 2007Federal Register Notice Confirmatory Order - Anthony Alexander, FENOC
ML07233044114 August 2007NPDES Monthly Report Forms for the Month of July 2007. No Violations Occurred During This PeriodGrab sample
ML07226002514 August 2007EN-07-048 - Firstenergy Nuclear Operating Company, Notification of Significant Enforcement Action
ML07338018914 August 2007E-mail from Lopez to EN List 2007, EN-07-048, First Energy Nuclear Operating Company
ML07226054514 August 2007Transmittal of Consent and Hearing Waiver Form
ML07226003913 August 2007Commitments to Be Confirmed by Order Modifying License (Effective Immediately)
ML0722503657 August 2007Submittal of Eleventh Inservice Inspection Summary ReportHydrostatic
Nondestructive Examination
Squib
VT-2
Liquid penetrant
Dissimilar Metal Weld
Scaffolding
ML0720701457 August 2007Summary of June 27, 2007, Public Meeting Regarding Fenoc'S Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event
ML0722502197 August 2007Submittal of Revision of the National Pollutant Discharge Elimination System PermitHigh winds
Grab sample
ML0733802667 August 2007Email from C. Carpenter, OE, to D. Starkey, Subject: FENOC Order
ML0726003026 August 2007Ro/Sro August 2007 Initial Retake ExaminationHalf scram
Time to boil
Temporary Modification
Scram Discharge Volume
Earthquake
Fire Protection Program
Power change
ML0733802566 August 2007Email from C. Carpenter, OE, to Qhalnon@Firstenerqycorp.Com, Subject: FENOC Comments on Draft Confirmatory Order
ML0733802496 August 2007Email from C. Carpenter, OE, to M. Virgilio, Subject: Two Items Due Today
ML0721503413 August 2007Notice of Closed Meeting with FENOC Regarding the Review of Proposed Security -Based Event Emergency Preparedness Drill Scenario (Perry Plant)
ML0733802421 August 2007Email from C. Carpenter, OE, to B. Sheron, B. Mallett, C. Miller, Et Al., Subject: Periodic with Chairman Klein on 7/31/07
ML07213054130 July 2007Operator Licensing Exam Retake