Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML073550467 | 21 December 2007 | Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss FENOC Fleet Wide Performance | |
ML073540379 | 19 December 2007 | Change to the Inspection Plan 1/1/08 - 12/31/08 | |
IR 05000440/2007405 | 7 December 2007 | IR 05000440-07-405(DRS); 10/22/2007 - 10/26/2007; Perry Nuclear Power Plant; Routine Security Baseline Inspection | Significance Determination Process |
PNO-III-07-015, A: Perry, Update to Scram at Perry Nuclear Power Station and Feedwater Loss | 6 December 2007 | PNO-III-07-015A: Perry, Update to Scram at Perry Nuclear Power Station and Feedwater Loss | |
Press Release-III-07-026, NRC Begins Special Inspection at Perry Plant Due to a Scram and Feedwater Problems | 29 November 2007 | Press Release-III-07-026: NRC Begins Special Inspection at Perry Plant Due to a Scram and Feedwater Problems | |
ML073321269 | 28 November 2007 | PNO-III-07-015: Scram at Perry Nuclear Power Station and Feedwater Loss | |
L-07-138, Actions Required by Confirmatory Order EA-07-199 | 26 November 2007 | Actions Required by Confirmatory Order EA-07-199 | Boric Acid |
ML073200982 | 9 November 2007 | NPDES Monthly Report Forms for the Month of October 2007 | |
ML073100248 | 1 November 2007 | Comment (2) of Todd a Henderson on Behalf of Firstenergy Nuclear Operating Company (FENOC) on Energy Solutions PRM-50-88 Re to Amend 10 CFR 50.82., Termination of License | |
ML073520539 | 28 October 2007 | LTR-07-0819 - Ltr. Tom Gurdziel, Concerns New Generation of Nuclear Plants | |
ML073100366 | 26 October 2007 | NPDES Monthly Report Station Code 004, Point Representative of Discharge | Grab sample |
IR 05000440/2007004 | 26 October 2007 | High Radiation Area Fire Barrier Hydrostatic Probabilistic Risk Assessment Temporary Modification Zebra Mussel Significance Determination Process Process Control Program Operability Determination Fire Protection Program Power change Downpower Unidentified leakage Siren Overexposure | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
IR 05000263/2007006 | 23 October 2007 | IR 05000263-07-006(DRS); 08/27/2007 Through 09/14/2007; Perry Nuclear Power Plant. Routine Engineering Baseline Inspection | Safe Shutdown Time of Discovery |
ML072780387 | 18 October 2007 | Joseph J. Hagan Ltr. Acknowledgement of Receipt of Response Letters Required by Confirmatory Order | |
ML072910222 | 12 October 2007 | Submittal of Technical Specification Bases, Revision 6 | Safe Shutdown Scram Discharge Volume Fuel cladding Offsite Circuit |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072910267 | 9 October 2007 | Submittal of NPDES Monthly Report Forms for the Month of September 2007 | Grab sample |
L-80-030, Request for Technical Assistance, Resolution of the Impact of Air Handler Unavailability on Technical Specification Equipment Based on Interpretation of GL 80-30 Dated April 10, 1980 and NRC Letter to Perry, Dated April 05, 2002 | 4 October 2007 | Request for Technical Assistance, Resolution of the Impact of Air Handler Unavailability on Technical Specification Equipment Based on Interpretation of GL 80-30 Dated April 10, 1980 and NRC Letter to Perry, Dated April 05, 2002 | Probabilistic Risk Assessment |
ML072750532 | 24 September 2007 | Letter Regarding an Occurrence That Was Reportable in Accordance with the Ohio Environmental Protection Agency (Oepa) Permit No. 3IB00016*ID | Time of Discovery |
IR 05000440/2007302 | 20 September 2007 | Er 05000440-07-302, on 08/15/2007, Firstenergy Nuclear Operating Company, Perry Nuclear Power Plant. Initial License Examination Report | |
IR 05000440/2007008 | 20 September 2007 | IR 05000440-07-008, on 8/16/2007 - 8/23/2007, Perry Nuclear Power Plant, Supplemental Inspection; Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. | Mission time |
TAC:MD6829 | 18 September 2007 | ||
ML072680852 | 18 September 2007 | License Amendment Request Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | Safe Shutdown Incorporated by reference Preplanned Activity Recently irradiated fuel |
L-07-121, Cynthia Carpenter Ltr. Actions Required by Confirmatory Order EA-07-199 | 13 September 2007 | Cynthia Carpenter Ltr. Actions Required by Confirmatory Order EA-07-199 | |
ML072630161 | 10 September 2007 | NPDES Monthly Report Forms for August 2007 | Grab sample |
ML072610695 | 7 September 2007 | Report of Facility Changes, Tests and Experiments for 09/09/2005 to Present | Reactor Vessel Water Level Control of Heavy Loads |
ML072550547 | 5 September 2007 | License Amendment Request to Revise Technical Specification 3.6.1, 3.6.4, and 3.6.5 for Containment and Drywell Isolation Device | High Radiation Area Hydrostatic Emergency Lighting Recently irradiated fuel |
ML072430076 | 31 August 2007 | 8/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan | |
ML072480608 | 24 August 2007 | Semiannual Fitness-For-Duty Report for January-June 2007 | Fitness for Duty |
NEI 06-04, Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant | 21 August 2007 | Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant | |
ML072320381 | 21 August 2007 | Summary of 08/17/07 Closed Meeting with FENOC to Discuss Security Threat-Based Event Emergency Preparedness Drill Scenario at the Perry Nuclear Power Plant | |
ML072350129 | 17 August 2007 | Voluntary Response to NRC Regulatory Issue Summary 2007-17: Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML072260535 | 15 August 2007 | Confirmatory Order (Effective Immediately) Firstenergy Nuclear Operating Company | |
ML072270257 | 15 August 2007 | Federal Register Notice Confirmatory Order - Anthony Alexander, FENOC | |
ML072330441 | 14 August 2007 | NPDES Monthly Report Forms for the Month of July 2007. No Violations Occurred During This Period | Grab sample |
ML072260025 | 14 August 2007 | EN-07-048 - Firstenergy Nuclear Operating Company, Notification of Significant Enforcement Action | |
ML073380189 | 14 August 2007 | E-mail from Lopez to EN List 2007, EN-07-048, First Energy Nuclear Operating Company | |
ML072260545 | 14 August 2007 | Transmittal of Consent and Hearing Waiver Form | |
ML072260039 | 13 August 2007 | Commitments to Be Confirmed by Order Modifying License (Effective Immediately) | |
ML072250365 | 7 August 2007 | Submittal of Eleventh Inservice Inspection Summary Report | Hydrostatic Nondestructive Examination Squib VT-2 Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML072070145 | 7 August 2007 | Summary of June 27, 2007, Public Meeting Regarding Fenoc'S Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event | |
ML072250219 | 7 August 2007 | Submittal of Revision of the National Pollutant Discharge Elimination System Permit | High winds Grab sample |
ML073380266 | 7 August 2007 | Email from C. Carpenter, OE, to D. Starkey, Subject: FENOC Order | |
ML072600302 | 6 August 2007 | Ro/Sro August 2007 Initial Retake Examination | Half scram Time to boil Temporary Modification Scram Discharge Volume Earthquake Fire Protection Program Power change |
ML073380256 | 6 August 2007 | Email from C. Carpenter, OE, to Qhalnon@Firstenerqycorp.Com, Subject: FENOC Comments on Draft Confirmatory Order | |
ML073380249 | 6 August 2007 | Email from C. Carpenter, OE, to M. Virgilio, Subject: Two Items Due Today | |
ML072150341 | 3 August 2007 | Notice of Closed Meeting with FENOC Regarding the Review of Proposed Security -Based Event Emergency Preparedness Drill Scenario (Perry Plant) | |
ML073380242 | 1 August 2007 | Email from C. Carpenter, OE, to B. Sheron, B. Mallett, C. Miller, Et Al., Subject: Periodic with Chairman Klein on 7/31/07 | |
ML072130541 | 30 July 2007 | Operator Licensing Exam Retake |