FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 Barry S. Allen Vice President 440-280-5382 Fax: 440-280-8029 September 10, 2007 PY-CEJOEPA-0475L Ohio Environmental Protection Agency Division of Water Pollution Control Enforcement Section, ES/MOR P.O. Box 1049 Columbus, Ohio 43216-1049 Ladies and Gentlemen:
Enclosed are the NPDES monthly report forms for the month of August 2007. No violations occurred during this period.
If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.
Sincerely, Enclosures cc: NRC Region IT[
NRC Resident Inspector NRC Project Manager NRC Document Control Desk (Docket No. 50-440)
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP Station Code Reported Date (Month Year):
Application 9/4/2007 Perry Nuclear Power Plant 004 August 2007 31B00016*ID Perry Nuclear Power Plant 10 Center Road Sampling Station Description PerryOH44081 Point Representative of Discharge in(1) -Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab Analyst in(2)
Enter frequency of sampling CCB12S Liz Ryan (1)1 3
_FL 13 (2) 1 1
1 1
999 999
( (01094)
(50060)
(00400)
(01119)
(00011)
(34044)
(50050)
Zinc, Total Chlorine, Total pH Copper, Total FWater Temperature Oxidants, Total Flow Rate Recoverable Residual S.U.
Recoverable F
Residual MGD Day ug/l mg/l ug/l mg/l 01 AA 5.2 76 AH 96 5
02 AA 78 AH 99.5
........................................................... i...........................
03 AA 8.6
§0 AR 122
....i............................
................... i.................
04 AA 80 AH 133.9
=
05i..................................A..
7 9 1 4..
2...............
.2....
i.79.AH.1 06 AA79 AH 147.3 07 AA 8.6 79 AH 140.4 08 AA 7i9-
-ARH---
115-. 1 09 AA 80 AH 124.8
.........1.............
.....i............
8.6..............................................................................
....................... A--
.... -....9..........................
10 AA 8.6 79 AH 119 11AA 78 AR 108.6 12 AA 78 AH 122
. 3
.H..
13 AA 79 AR 125 14 AA 8.43 78 AR 117.2 15 AA 78 AH 111.3 16 1AA 78 AR 110.1 1 6 7 8 i 1- - -...........
17 iAA 8.42 79 AH 111.9 76 AH 18 AA 76i 113 19 AA 77 AR 121.9 20 AA AA 77 AR 150.4 2 i.............
2...
.A..
......1..
..3.
21 AA 7652A76132 22!
AA7 AR 120.4 23 AA 79 AR 121.4 24 AA 8.56 79 AH 108.2
.................................1.
25 AA 80 AH 132.3
....... 7.9.-...
26 AA 79 AH 142.5
- 7.
8...
A 27~
28 AA 8.7 78 AH 120.4 i.....................
.......H i...........
1.*
i...........................
i171i.iiiiii i........
30A 79 AR 131.5 3
.8 8
3..........
31
-AA 8.58 79 AR 128.3 TOTAL 0
0 77.1
]
5.2 2428 0
3823.8 AVG 0
0 N/A 5.2 78.3226 0
123.3484 MAX 0
0 8.7 5.2 80 0
150.4 MIN 0
0 8.42 5.2 76 0
]
96 o.....
o...................
-l 8.......
0..............................
I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
Date Report Completed:
Signature of Reporter:
Title of Reporter:
09/04/2007 A
ý Vice President, Nuclear Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of 2
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP Station Code Reported Date (Month Year)
Application 9/4/2007 Perry Nuclear Power Plant 004 August 2007 31B00016*ID Perry Nuclear Power Plant 10 Center Road Sampling Station Description PerryOH44081 Point Representative of Discharge in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab Analyst:
- 2.
e
[..
e....
.e.c y.......
.o f. s. r p.
ln.
.B...
L !.._ _~
n...................................................
in2 ne frqec ofsapln Cf15Li Ra m
l) 3 11_
1 (78739)
Chlorination/Brol Duration Day Minutes 0 1 90
.z 02
'77 7..............
....0 03 I 77 04 100
- 05.
06.....110 07 i
107 08 100 09 102 10 100 II............
i...........
.....i 11100 5 'i.
12 1-00
............... i...................
13100
~....................
14 100 15 100 16 00 17 100 18 1
100 191 100-20 100 21100 22 100 23 100 24 100 25 100 L.....
26 i 100 27 1
100 27 28 100 29 100 30 100 i...............
31:
.TOTAL!
2933 0
0 0
0 AVG M
.A0X 110 SMIN 70 0
0 0
_0 0
0 0
Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 2 of 2
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Road Perry OH 44081 Station Code Reported Date (Month Year):
004 August 2007 Sampling Station Description :
Point Representative of Discharge Application 31B00016*ID 9/4/2007 Reporting Code Result Date Additional Remarks 01094 08/20/2007 :Less than MDL iMdl
!8.
34044
- 34044 34044
.34044 34044 34044 34044
.34044
.... 4 -5 4...........--
34044 4.
34044
- . j 4 4 34044 34044
.34044-34044
.- 34-044 08/01/2007 No bromination events this date 08/02/2007 08/03/2007 08/04/2007 S.0............../....................
08/04/2007 08/07/2007 08/05/2007
/
0..................
08/06/2007 08/02/2 007 08/13/2 007 08/04/200'7 08/15/2007 0 8/11/2007 08/18/2007 No bromination events this date No bromination events this date No bromination No bromination No brom.ination Mo bromination b
r...
I............................
.No bromination No bromination No bromination No bromination
,No brmiato
.......I..
events this date events this date events this date events this date events this date events this date events this date e n t ia.-ete.--.........
events this date t...
.br..in ti.......
events this date No bromination events this date No No No bromination events this date bromination events this date br nati.n....events th.....
br-minati'n evns this-dat No bromination events this date 34044 08/19/2007 No bromination events this date 34044 08/20/2007 No bromination events this date 34044 34044 34044 34044 3 4 04..............4........
34044 34044 34044 3.................
4....
4............
0.....
34044 34044
.0 50060 L.......
..... i..
50060 50060 50060 50060 08 /21/2 0 07 08/22/2007 08/23/2007 08/24/2007 08/25/2007 08 /2. /20 07 08/24/2007
.... 2 6 I....
08/26/2007 08/29/2007 08/30/2007 08 /31/2 007 08 /01/2 007 No bromination events this date No bromination events this date No bromination events this date No bromination events this date No bromination events this date No bromination events this date No bromination events this date No bromination events this date brominatio
-eve.n s this date........................................
No bromination events this date No brom.nation events this date Less than MDL 08/02/2007
.ess than MDL 08/03/2007 Less than MDL 08/04/2007
.ess than MDL 08/05/2007 Less than MDL 08/08/2007 Less than MDL 08/07/2007 Less than MDL
.05 05
............. i...........
.05
.05
- .05
.. 05
.05
Reporting Code Result Date Additional Remarks Mdll 50060 08/08/2007 Less than MDL 50060 08/09/2007 less than MDL S
50060 08/10/2007 Less than MDL S
50060 08/11/2007 iLess than MDL 50060 08/12/2007 Less than MDL 50060 08/13/2007 Less than MDL 50060 08/14/2007 Less than MDL
.50060 08/15/2007
.Less than MDL 50060 08/16/2007 Less than MDL 50060 08/17/2007 Less than MDL 50060 08/18/2007 less than MDL 50060 08/19/2007 !Less than MDL 50060 08/20/2007 Less than MDL 50060 08/2/0 L 50060 08/21/2007 :Less than MDL 500....
66 60..
0..
8/23
-/2 0 0 7 -"L e s~s -th an -M D L -
5 0 0 60.0 8a..................
..................... M......
50060 08/25/2007 Less than MDL 50060 08/26/2007 Less than MDL 50060 08/27/2007 less than MDL i~~ ~
~ ~....
- 2 Tf*
- * - i 50060 08/28/2007 less than MDL 50060.
08/29/200 Less the 50060 08/23/2007 Less than MDL 50060 08/23/2007 Less than MDL 50060 08/26/2007 iLess than MDL 50060 08/27/2007 !Less than MDL S...................
.% 6
... q "'?**
- h * *
.. 05
- .05
.. 05
.. 05
.. 05
,.05 0.........................................................5...........
.. 05 0~5
..05
.05
.05
.05 05
.05
.05
.05
..05
.05 05
- .05 i.05 0~5 i
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP Station Code Reported Date (Month Year)
Application 9/4/2007 Perry Nuclear Power Plant 094 August 2007 31B00016*ID Perry Nuclear Power Plant 10 Center Road Sampling Station Description PerryOH44081 Actually 004 when chlorination greater than 120 minutes in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab Analyst in(2) - Enter frequency of sampling CCB125 Liz Ryan (1) 1 3
3 3
3 1
_[
3 (2) 999 1
1 1
1 999 (00011)
(00400)
(01094)
(01119)
(34044)
(50050)
(50060)
Water pH Zinc, Total Copper, Total Oxidants, Total Flow Rate Chlorine, Total Temperature S.U.
Recoverable Recoverable Residual MGD i
Residual Day F
ug/l ug/l mg/l mg/l 01 AL 02 03I 06..............................
07.
08 09 101.....
1 0....
[.......
i............................................
1"1 12 ~
......[ {
4.....
.iiiii...........
{............................
i 2 i.........................
14 I
17 18 3 0 19 20 21 22 24 25 26 27 28 29 30 31 TOTAL 0
0 I0 0
0 0
0 AVG 0
N/A 0
MAX 0o MIN 0
0 0
0 0
0 0
I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
Date Report Completed:
Signature of Reporter:
Title of Reporter:
09/04/2007 '
Vice President, Nuclear Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of 2
MONTHLY REPORT FORM Name, Address City, County, ZIP:
Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Road Perry OH 44081 4500 Station Code:
094 Reported Date (Month Year):
August 2007 Application 31B00016*ID 91412007 Sampling Station Description :
Actually 004 when chlorination greater than 120 minutes Reporting Code Result Date Additional Remarks 00011 C08/01/2007 No chlorination of greater than 120 minutes
.Mdl
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP Station Code Reported Date (Month Year)
Application 9/4/2007 Perry Nuclear Power Plant 601 August 2007 31B00016*ID Perry Nuclear Power Plant Sampling Station Description :
PerryOH44R81 Discharge from Regenerate Neutralization Pits in(t) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab :
Analyst:
in(2) - Enter frequency of sampling CCB1 25 Liz Ryan 1(2)1 1
999 (00400)
(00530)
(00550)
(50050) pH Total Suspended Oil and Grease, Flow Rate S.U.
Solids Total MGD Day mg/l mg/l AL i
[....
i........
02 03 04 I
05 06 07 11
- i..............
12 13
.i 04
.......... I..................
15 16 I...7 17
..........................÷...............
18 I...
19 S 20**i ~......
.............................i.......................................i...
218 24,
25 i........
26 S27 28 29 231
- TOTAL 0
0 0
0 0
0 0
AVG N /A A
MAX 0
MIN I
0 0
0 0
0 0 ______0 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of tine and imprisonment.
Date Report Completed:
Signature of Reporter:
Title of Reporter:
09/04/2007 144*/A.~
Vice President, Nuclear Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of 1
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Road Perry OH 44081 Station Code 601 Reported Date (Month Year):
August 2007 Application 31B00016*ID 9/4/2007 Sampling Station Description :
Discharge from Regenerate Neutralization Pits Reporting Code Result Date Additional Remarks 00400 08/01/2007 No discharge performed this month
.Mdl
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP Station Code Reported Date (Month Year)
Application 9/4/2007 Perry Nuclear Power Plant 602 August 2007 31B00016*ID Perry Nuclear Power Plant 10 Center Road Sampling Station Description PerryOH44081 Discharge from Chemical Cleaning Lagoon in(1) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab Analyst in(2) - Enter frequency of sampling CCB125 Liz Ryan
........ -t.......
3......................
(1)-
2 2
3 23 (2) 99 98 J
998 J1 999 (00980)
(01119)
(00400)
(00530)
(00550)
(50050)
Iron, Total Copper, Total pH Total Suspended 1 Oil and Grease, Flow Rate Recoverable Recoverable S.U.
Solids Total MGD Day ug/l ug/l mg/l mg/l 01 AL 02 03.....0
.............i..........................
i.........
[....
.]...........
T.............
05---------....
06 7 ----.-.
07
_ [.......
.. i....
8-0 10
- O i............
i.......................
t.......................
[...........
10.1.'-
15 1...
8......
19 i
- i..........
121 i......
1 3 j
14 16..
24 1
I.....................
20 21 22 23
!1................
.. i......................................
24 25 26 27 28 29 30
-1 31 tOTAL' 0
0 0
0 0
0 0
AVG 0
N/A MAX 0
MIN 0
0 0
0 I0 0
0 I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
Date Report Completed:
Signature of Reporter:
Title of Reporter:
09/04/2007 kaAA*
Vice President, Nuclear Form No EPA 4500 (8-91)
(Generated by SWIMS)
Formerly EPA SURI Page 1 of 1
MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:
Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Road Perry OH 44081 Station Code:
602 Reported Date (Month Year):
August 2007 Application 31B00016*ID 9/4/2007 Sampling Station Description :
Discharge from Chemical Cleaning Lagoon
.Reporting Code Result Date Additional Remarks 00980 08/01/2007 No discharge performed this month
...M.................d........l.
MONT4I-LY REPORT FORM Name, Address City, County, ZIP:
Perry N uclear Power Plant Perry Nuclear Power Plant 10 Center Road PerryOI 1 4 40 8 1 4500 Station Code Reported Date (Month Year):
800 August 2007 Sampling Station Description Intake Water from Lake Erie Application
- 9/4/2007 31B00016*ID in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:
in(2) - Enter frequency of sampling CCB12 5 L
3 H3 (2)1 1
999 1
(01119)
(00011)
(01094)
I Copper, Total iWater Temperature!
Zinc, Total Recoverable F
Recoverable Day !
ug/l ug/l 01 2
70 02 7
- o.
03T77 04:
77 054 0
5
_ 06!
- i................................
0776 09*
S.....
i................................................
10 76 11
__76
.1
.6 12 7
13.76 1 5
! 16 i1 17 7
. :i.......
1 5
l
- t, o...........
[.....................
18 t...................
j4 21 71
................i..
22 21.
23 3
251 27 75 221 373 2V 7451114 2
775 1.
Analyst Liz Ryan
-w I
MIN I 2
i 70 21.,
- erlti under the penalty of law that I have personally examined and am familiar with the information submitted and based on.my juiyof those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate j crnplete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
ate Report Completed:
Signature of Reporter:
Title of Reporter:
9/04/2007 Vice President, Nuclear
,No EPA 4500 (8-91) erated by SWIMS)
,erly EPA SURI Page 1 of 1
MON4THLY REPORT FORM Name, Address City, County, ZIP:
Perry Nuclear Power Plant Perry Nuclear Power Plant 10 Center Road Perry OH 44081 4500 Station Code 800 Reported Date (Month Year):
August 2007 Application 31S00016*ID 9/4/2007 Sampling Station
Description:
Intake Water from Lake Erie