ML073540379
| ML073540379 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/19/2007 |
| From: | Burgess B NRC/RGN-III/DRP/B6 |
| To: | Allen B FirstEnergy Nuclear Operating Co |
| References | |
| Download: ML073540379 (5) | |
Text
December 19, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097
SUBJECT:
CHANGE TO THE INSPECTION PLAN - PERRY NUCLEAR POWER PLANT
Dear Mr. Allen:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Bruce Burgess, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Enclosure:
As Stated cc w/encl:
J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
Please contact me at 630-829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Bruce Burgess, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58
Enclosure:
As Stated cc w/encl:
J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health DOCUMENT NAME:G:\\BRANCH TSS\\ALL MOC\\MIDCYCLE 2006 TO 2007\\ROP REALIGNMENT LETTER\\PERRY.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME BBurgess:cms DATE 12/19/07 OFFICIAL RECORD COPY
Letter to B. Allen from B. Burgess dated December 19, 2007
SUBJECT:
CHANGE TO THE INSPECTION PLAN - PERRY NUCLEAR POWER PLANT DISTRIBUTION:
RAG1 TEB TJW2 RidsNrrDirsIrib MAS KGO JKH3 MEF1 CAA1 DRPIII DRSIII PLB1 TXN
Perry Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/10/2008 03/14/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 5
BI ENG
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/05/2008 06/06/2008 7111121 IP Component Design Bases Inspection 1
RPV HEAD
- RPV HEAD DROP ANALYSIS INSPECTION Baseline Inspections 07/21/2008 08/08/2008 7111120 IP Refueling and Other Outage Activities 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/08/2008 09/12/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/08/2008 09/12/2008 71151-OR01 IP Occupational Exposure Control Effectiveness 3
BI EP
- EP EXERCISE INSPECTION / PI VERIFICATION EP Baseline Inspectio 10/06/2008 10/10/2008 7111401 IP Exercise Evaluation Baseline Inspections 10/06/2008 10/10/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/06/2008 10/10/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/06/2008 10/10/2008 71151-EP03 IP Alert & Notification System 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 7112102 IP ALARA Planning and Controls Baseline Inspections 10/20/2008 10/24/2008 71151-BI01 IP Reactor Coolant System Activity 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/17/2008 11/21/2008 7112202 IP Radioactive Material Processing and Transportation 2
BI OL
- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 12/01/2008 12/05/2008 7111111B IP Licensed Operator Requalification Program