Text
FENOC Perry Nuclear Power Station Oft"%10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 BarryS. Allen 440-280-5382 Vice President a
4-280-8029 August 17, 2007 PY-CEI/NRR-3054L United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Perry Nuclear Power Plant Docket No. 50-440
Subject:
Voluntary Response to NRC Regulatory Issue Summary 2007-1 7:
Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
As requested in NRC Regulatory Issue Summary (RIS) 2007-1 7, Preparation and Scheduling of Operator Licensing Examinations, enclosed is the voluntary response concerning the estimated number of candidates to be examined during scheduled examination visits.
The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for fiscal years 2008 through 2011.
There are no regulatory commitments contained in this letter or its attachments. If there are any questions concerning this matter, please contact Mr. Jeffrey Lausberg - Manager, Regulatory Compliance at (440) 280-5940.
Very truly yours e&
For Barry S. Allen Enclosure NRC Region III NRC Resident Inspector Office NRC Project Manager Nancy L. Salgado, NRR Hironori Peterson, Rill
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERTOR ICENINGestimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPER TOR ICENINGNuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMIATIONDATAe-mail to infocollects@nrc.gov, and to the Desk Officer. Office of Information EXAMIATIONDATAand Regulatory Affairs. NEOB-1 0202, (3150-0131). Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Perry Nuclear Power Plant I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONSII B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY201 0 CY2011 NUMBER OF REACTOR 0
3 3
3 OPERATORS NUMBER OF SENIOR REACTOR 0
10 10 10 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR0222 OPERATORS - UPGRADE0222 NUMBER OF SENIOR REACTOR0000 OPERATORS - LIMITED0000 PROPOSED DATES PRIMARY DATE 01/12/2009 01/11/2010 01/10/2011 ALTERNATE DATE 01/19/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (8-2005)
NRC ORM538 8-205)PRINTED ON RECYCLED PAPER