| | Start date | Site | Title |
|---|
| 05000461/LER-1917-003, Regarding Implementation of Enforcement Guidance Memorandum (Egm) 11-003, Revision 3 | 3 July 2017 | Clinton | Regarding Implementation of Enforcement Guidance Memorandum (Egm) 11-003, Revision 3 |
| 05000440/LER-2017-001 | 17 March 2017 | Perry | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 |
| 05000461/LER-2016-008, Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 | 15 July 2016 | Clinton | Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 |
| IR 05000298/2015002 | 11 August 2015 | Cooper | IR 05000298/2015002; on 04/01/2015 - 06/30/2015; Cooper Nuclear Station; Maintenance Risk Assessments and Emergent Work Control |
| 05000298/FIN-2015002-01 | 30 June 2015 23:59:59 | Cooper | Failure to Prevent Reactor Thermal Power from Exceeding 2419 MWt for Preplanned Activity |
| IR 05000335/2014002 | 30 April 2014 | Saint Lucie | IR 05000335-14-002, 05000389-14-002; on 01/01/2014 - 03/31/2014; St. Lucie Nuclear Plant Units 1 & 2; Follow-up of Events and Notice of Enforcement Discretion; Radiological Hazard Assessment and Exposure Controls |
| ENS 49013 | 8 May 2013 21:00:00 | Pilgrim | Main Annunciator System Inoperable Due to Maintenance |
| ENS 48997 | 3 May 2013 09:42:00 | Pilgrim | Loss of Main Control Room Annunciators During Planned Spds Maintenance |
| 05000325/LER-2012-006, (Bsep), Unit 1, Operation Prohibited by Technical Specifications Due to Operation with a Potential for Draining the Reactor Vessel (OPDRV) | 19 November 2012 | Brunswick | (Bsep), Unit 1, Operation Prohibited by Technical Specifications Due to Operation with a Potential for Draining the Reactor Vessel (OPDRV) |
| IR 05000327/2011005 | 30 January 2012 | Sequoyah | IR 05000327-11-005, 05000328-11-005, 05000327-11-501, 05000328-11-501; on 10/1/2011 - 12/31/2011; Sequoyah Nuclear Plant, Units 1 and 2; Surveillance Testing, Identification and Resolution of Problems, and Event Followup |