MONTHYEARPNO-III-18-002, Beaver Valley, Davis-Besse, Perry Notification of Bankruptcy Filing by Firstenergy Solutions2018-04-0404 April 2018 PNO-III-18-002: Beaver Valley, Davis-Besse, Perry Notification of Bankruptcy Filing by Firstenergy Solutions PNO-III-16-002, Perry Nuclear Power Plant: Unplanned Shutdown Greater than 72 Hours Due to Spurious Opening of Safety Relief Valves and Subsequent Plant Restart2016-02-18018 February 2016 PNO-III-16-002 Perry Nuclear Power Plant: Unplanned Shutdown Greater than 72 Hours Due to Spurious Opening of Safety Relief Valves and Subsequent Plant Restart PNO-III-16-001, A, Perry Nuclear Plant, Unplanned Shutdown Greater than 72 Hours Due to Reactor Coolant System Leakage Exceeding Technical Specification Limits and Subsequent Plant Restart2016-02-0505 February 2016 PNO-III-16-001A, Perry Nuclear Plant, Unplanned Shutdown Greater than 72 Hours Due to Reactor Coolant System Leakage Exceeding Technical Specification Limits and Subsequent Plant Restart ML16032A3942016-01-29029 January 2016 PNO-III-16-001 Perry Nuclear Power Plant, Unplanned Shutdown Greater than 72 Hours Due to Reactor Coolant System Leakage Exceeding Technical Specification Limits ML14316A5802014-11-12012 November 2014 PNO-lll-14-011: Unplanned Shutdown Greater than 72 Hours Due to a Loss of Feedwater ML14301A0342014-10-27027 October 2014 PNO-lll-14-009A Update to Unplanned Shutdown Greater than 72 Hours Due to a Loss of Feedwater PNO-III-14-009, Perry Nuclear Power Plant - Unplanned Shutdown Greater than 72 Hours Due to a Loss of Feedwater2014-10-24024 October 2014 PNO-III-14-009: Perry Nuclear Power Plant - Unplanned Shutdown Greater than 72 Hours Due to a Loss of Feedwater PNO-III-14-004, Perry Nuclear Power Plant Notification of Unusual Event Due to Toxic Chemical Leak2014-04-0303 April 2014 PNO-III-14-004: Perry Nuclear Power Plant Notification of Unusual Event Due to Toxic Chemical Leak ML13169A3672013-06-18018 June 2013 PNO-lll-13-005, Perry Nuclear Power Plant Shutdown Greater than 72 Hours Due to a Pressure Boundary PNO-III-13-001, Unplanned Shutdown Greater than 72 Hours Due to an Automatic Reactor Protection System Actuation2013-01-29029 January 2013 PNO-III-13-001, Unplanned Shutdown Greater than 72 Hours Due to an Automatic Reactor Protection System Actuation PNO-III-12-017, Perry Nuclear Power Plant Unusual Event Declared After Carbon Monoxide Detectors Alarmed in the Radwaste Building Control Room2012-11-29029 November 2012 PNO-III-12-017 - Perry Nuclear Power Plant Unusual Event Declared After Carbon Monoxide Detectors Alarmed in the Radwaste Building Control Room PNO-III-12-005, Perry Unplanned Shutdown Greater than 72 Hours2012-06-19019 June 2012 PNO-III-12-005 - Perry Unplanned Shutdown Greater than 72 Hours PNO-III-11-012, A - Perry Unplanned Shutdown Greater than 72 Hours (Update)2011-10-19019 October 2011 PNO-III-11-012A - Perry Unplanned Shutdown Greater than 72 Hours (Update) ML1127801372011-10-0505 October 2011 PNO-III-11-012 - Perry - Unplanned Shutdown Greater than 72 Hours PNO-III-10-006, A: Perry, - Update - Manual Reactor Scram Due to Loss of Control Rod Drive Charging Water Header Pumps2010-05-19019 May 2010 PNO-III-10-006A: Perry, - Update - Manual Reactor Scram Due to Loss of Control Rod Drive Charging Water Header Pumps ML1013407362010-05-14014 May 2010 PNO-III-10-006-Perry-Manual Reactor Scram Due to Loss of Control Rod Drive Charging Water Header Pumps PNO-III-10-005, A - Perry - Update - Turbine-Driven Feedwater Pump Fire Caused by Leak in Lube Oil System2010-03-31031 March 2010 PNO-III-10-005A - Perry - Update - Turbine-Driven Feedwater Pump Fire Caused by Leak in Lube Oil System PNO-III-09-012, A: Perry, Manual Reactor Scram During Planned Shutdown (Update)2009-11-0303 November 2009 PNO-III-09-012A: Perry, Manual Reactor Scram During Planned Shutdown (Update) ML0929203402009-10-19019 October 2009 PNO-III-09-012: Perry, Manual Reactor Scram During Planned Shutdown PNO-III-07-015, A: Perry, Update to Scram at Perry Nuclear Power Station and Feedwater Loss2007-12-0606 December 2007 PNO-III-07-015A: Perry, Update to Scram at Perry Nuclear Power Station and Feedwater Loss ML0733212692007-11-28028 November 2007 PNO-III-07-015: Scram at Perry Nuclear Power Station and Feedwater Loss PNO-III-07-009, A: Perry: Update to Unexpected Reactor Shutdown Exceeding 72 Hours Due to Problem with Reactor Recirculation Pump Motor2007-07-24024 July 2007 PNO-III-07-009-A: Perry: Update to Unexpected Reactor Shutdown Exceeding 72 Hours Due to Problem with Reactor Recirculation Pump Motor ML0718606072007-07-0505 July 2007 PNO-III-07-009: Perry: Unexpected Reactor Shut Down Exceeding 72 Hours Due to Problem with Reactor Recirculation Pump Motor PNO-III-06-016, Perry Nuclear Power Plant Unusual Event Declared Due to Earth Quake2006-06-21021 June 2006 PNO-III-06-016 Perry Nuclear Power Plant Unusual Event Declared Due to Earth Quake PNO-III-06-009, Perry Nuclear Power Plant Low Level Tritium Identified in Underdrain System2006-04-0606 April 2006 PNO-III-06-009 - Perry Nuclear Power Plant Low Level Tritium Identified in Underdrain System PNO-III-04-015, Perry Nuclear Power Plant, Inadvertent Discharge of CO2 Fire Protection System in Turbine Building2004-11-12012 November 2004 PNO-III-04-015: Perry Nuclear Power Plant, Inadvertent Discharge of CO2 Fire Protection System in Turbine Building PNO-III-04-014, Perry Nuclear Power Plant, Chemical Spill in Water Treatment Building2004-11-0404 November 2004 PNO-III-04-014: Perry Nuclear Power Plant, Chemical Spill in Water Treatment Building PNO-III-04-007, Perry, Alert Declared Because of Malfunctioning Radiation Monitor2004-07-20020 July 2004 PNO-III-04-007: Perry, Alert Declared Because of Malfunctioning Radiation Monitor PNO-III-03-022, Perry-Alert Declared Due to High Radiation Alarm in Fuel Handling Building2003-04-24024 April 2003 PNO-III-03-022: Perry-Alert Declared Due to High Radiation Alarm in Fuel Handling Building PNO-III-02-039, Reactor Scram During Main Turbine Testing Leads to Shutdown Greater than 72 Hours2002-09-23023 September 2002 PNO-III-02-039: Reactor Scram During Main Turbine Testing Leads to Shutdown Greater than 72 Hours 2018-04-04
[Table view] |
Text
PRELIMINARY NOTIFICATION- REGION III November 28, 2007 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III-07-015
This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III staff on this date.
Facility Perry Nuclear Power Station FirstEnergy Nuclear Operating Company Perry, Ohio Docket: 50-440 License: NPF-58 Licensee Emergency Classification Notification of Unusual Event Alert Site Area Emergency General Emergency x Not Applicable
SUBJECT:
SCRAM AT PERRY NUCLEAR POWER STATION AND FEEDWATER LOSS
DESCRIPTION:
On November 28, 2007, at 6:32 a.m. CST, FirstEnergy Nuclear Operating Company notified the NRC that the Perry Nuclear Power Station shut down due to an automatic scram.
The cause of the scram has not yet been confirmed. Coincident with the scram, the plant experienced a loss of both turbine-driven reactor feedwater pumps. The utility had not determined what caused the failure of the turbine-driven feedwater pumps.
Following the scram, the plant experienced problems with some of the equipment used to maintain proper water level in the reactor: the reactor core isolation cooling system and the motor-driven feedwater pump.
Proper water levels in the reactor have been maintained through the use of the high pressure core spray system and the reactor core isolation cooling system. The residual heat removal system has also been available, if needed.
The utility made no emergency declara tion because the pl ant did not lose the ability to maintain a safe water level in the reactor.
The plant is in a stable shutdown condition.
The utility is looking into the causes of the scram, the initial problem with the turbine-driven feedwater pumps and subsequent problems with the reactor core isolation cooling system and the motor-driven feedwater pump.
Region III staff and m anagement monitored the situation from its Incident Response Center. NRC resident inspectors were evaluating the situation onsite. A Special Inspection Team has been dispatched to further review plant response and equipment issues.
The NRC continues to evaluate the utility' s response.
The State of Ohio has been notified.
The information in this preliminary notification is current as of 11:30 a.m. on November 28, 2007.
This information has been reviewed with plant management.
CONTACTS:
Bruce Burgess Mark Franke 630/829-9629 440/259-3610