ML072430076

From kanterella
Jump to navigation Jump to search
8/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan
ML072430076
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/31/2007
From: Caldwell J
Region 3 Administrator
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML072430076 (7)


Text

August 31, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1

Dear Mr. Allen:

On August 14, 2007, the NRC staff completed its performance review of Perry for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and resultant inspection plan.

On May 1, 2007, the NRC staff completed an update of our assessment of the Perry Nuclear Power Plant. Our May 2, 2007, letter informed FirstEnergy Nuclear Operating Company that all actions had been completed for Perry to exit the Multiple/Repetitive Degraded Cornerstone column of the NRCs Action Matrix. Therefore, effective the second quarter 2007, the Perry plant exited the Multiple/Repetitive Degraded Cornerstone column and was placed in the Regulatory Response column, based on the White Emergency AC Power System mitigating systems performance index from January 2007. Regarding the White Performance Index, Region III conducted Supplemental Inspection 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," during the week of August 20 to assess the root cause analysis and implementation of corrective actions for the performance index. The results will be documented in a report within 30 days of the end of the supplemental inspection.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection scheduled for April 2008. The inspections scheduled within the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

B. Allen In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan DISTRIBUTION See next page

B. Allen In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan DISTRIBUTION See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Perry\Perry MOC 2007 letter.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME GWright:dtp BBurgess AHsia for JCaldwell CPederson DATE 08/21/07 08/21/07 08/28/07 08/29/07 OFFICIAL RECORD COPY

Letter to B. Allen from J. Caldwell dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1 cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC R. Anderson, Vice President, Nuclear Support - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health President, Geauga County Board Director, Department of Emergency Services Geauga County Sheriff President, Ashtabula County Board of Commissioners Ashtabula County Sheriff Director, Ashtabula County Emergency Management Agency Mayor, Village of Genoa Genoa Village Administrator President, Lake County Board of Commissioners Lake County Sheriff Painesville City Manager Lake County Administrator Director, Lake County Emergency Management Agency President, Village of Fairport Harbor Mayor, City of Eastlake Mayor, City of Wickliffe President, Geneva City Council City Manager, Geneva Mayor, City of Kirtland Mayor, City of Mentor City Manager, Mentor Mayor, City of Mentor on the Lake Administrative Director Mayor, City of Willoughby Hills Mayor, City of Willoughby Mayor, City of Willowick Mayor, Village of Madison Village Administrator, Village of Madison Chairman, Board of Madison Township Trustees Mayor, Village of Kirtland Hills Mayor, Village of Geneva-on-the-Lake Mayor, Lakeline Village Mayor, Village of Timberlake Mayor, Village of Grand River INPO

Letter to B. Allen from J. Caldwell dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1 DISTRIBUTION:

RAG1 TJW2 TEB RidsNrrDirslpab JLC1 MAS KGO RML2 SAM9 SRI Perry DRPIII DRSIII PLB1 TXN

Perry Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 08/27/2007 09/14/2007 Baseline Inspections IP 7111117B Permanent Plant Modifications 08/27/2007 09/14/2007 Baseline Inspections BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 1 IP 7111402 Alert and Notification System Testing 10/16/2007 10/20/2007 Baseline Inspections IP 7111403 Emergency Response Organization Augmentation Testing 10/16/2007 10/20/2007 Baseline Inspections IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP01 Drill/Exercise Performance 10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP02 ERO Drill Participation 10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP03 Alert & Notification System 10/16/2007 10/20/2007 Baseline Inspections 95003 - INDEPENDENT CAP FOLLOW UP 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 10/01/2007 11/30/2007 Supplemental Program BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 IP 7112101 Access Control to Radiologically Significant Areas 10/22/2007 10/26/2007 Baseline Inspections IP 7112102 ALARA Planning and Controls 10/22/2007 10/26/2007 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 10/22/2007 10/26/2007 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 10/22/2007 10/26/2007 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/10/2007 12/14/2007 Baseline Inspections RPV HEAD - RPV HEAD DROP ANALYSIS INSPECTION 1 IP 7111120 Refueling and Other Outage Activities 01/07/2008 02/15/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 03/10/2008 03/14/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 03/10/2008 03/14/2008 Baseline Inspections BI ENG - COMPONENT DESIGN BASES INSPECTION 5 IP 7111121 Component Design Bases Inspection 04/14/2008 05/16/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 IP 7111401 Exercise Evaluation 10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP01 Drill/Exercise Performance 10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 10/06/2008 10/10/2008 Baseline Inspections

Perry Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112102 ALARA Planning and Controls 10/13/2008 10/17/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 10/13/2008 10/17/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112202 Radioactive Material Processing and Transportation 11/17/2008 11/21/2008 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 12/01/2008 12/05/2008 Baseline Inspections