ML20153E23326 August 1988Forwards Status of Site Stabilization Activities,Per R Auluck Request.Tva Has Completed All Major Site Stabilization Activities at Plant W/Only Minor Maint Activities Remaining
ML20133N73224 October 1985Forwards Proposed Cancellation Plans for Plants Officially Canceled on 840829.Requests Withdrawal of CPPR-150,CPPR-152, CPPR-172 & CPPR-173.W/two Oversize Drawings
ML18029A39827 February 1985Responds to RM Diggs 850117 & 0211 Ltrs Re Determination of Fees for Const Extension Requests.Util Supports NRC Determination & Will Submit Fees
ML20096F8735 September 1984Forwards Motion to Terminate Appellate Jurisdiction.W/O Encl.Related Correspondence
ML20023C33612 May 1983Forwards Details of Deferral Plans for Yellow Creek Nuclear Plant.
ML20071B97424 February 1983Reiterates 830121 Request for CP Extension Until 870901 to Permit Final Decision Re Future of Nuclear Units Based on Load Growth/Demand.Deferral Plan Details to Be Submitted by 830506
ML20069D86920 September 1982Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal
ML20055C0616 August 1982Forwards Info Re QA for Deferred Plants,In Response to NRC .Possible Cancellation of Some Units Will Be Discussed at Future Meeting of TVA Board of Directors
ML20054K88829 June 1982Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept YCNP-SMR-7, Jan-June 1981
ML20054K15323 June 1982Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects
ML20069B9612 March 1982Informs of Changes Re Slowdown in Const Activities.Busing of Employees No Longer Justifiable Due to Lower Employment Levels & Const Schedule Changes.Waterfowl Wetlands Wildlife Monitoring Results Show Const Has Not Affected Wildlife
ML20039B55817 December 1981Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept, Per Fes Section 4.5.2.5
ML20039A2814 December 1981Notifies That Environ Const Noise Monitoring Procedures Will Be Revised at Hartsville & Yellow Creek & Terminated at Phipps Bend.Changes Caused by Slowdown & Cessation of Const. Summary of Const Noise Monitoring Program History Encl
ML20009D9318 July 1981Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel).Biofouling
ML20004B40221 May 1981Responds to Violations Noted in IE Insp Repts 50-566/81-02 & 50-567/81-02 Re Failure to Establish Adequate Measures to Control Welding & Nondestructive Exam.Rept Revises 810330 Rept to Reflect Bend Sample Fissure Evaluation Results
ML19350D91220 May 1981Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept, Jan-June 1981
ML19350C78130 March 1981Responds to NRC 810304 Ltr Re Violations Noted in IE Insp Repts 50-566/81-02 & 50-567/81-02.Corrective Actions: Certification of Welders Previously Certified Were Revoked & Are Tracking Potentially Unacceptable Welds
ML19341D30226 February 1981Forwards Revised Description of Onsite Meteorological Measurements Program.Revision Will Be Included in OL Application
ML19341A08323 December 1980Responds to NRC 801125 Ltr Re Violations Noted in IE Insp Repts 50-566/80-17 & 50-567/80-17.Corrective Actions:Part Ii,Section 5.1 of Div of Nuclear Power Operational QA Manual Rewritten
ML19345D5875 December 1980Forwards Socioeconomic Monitoring & Mitigation Rept, Semiannual Rept for Jul-Dec.Rept Prepared for Fes
ML19338G61024 October 1980Requests Expedited Review of Newport News Industrial Corp Draft Topical Rept Re Vol Reduction Sys.Util Plans to Utilize Sys at Units 1 & 2
ML19338G21521 October 1980Forwards Response to NRC 800926 Lr Re Violation Noted in IE Insp Repts 50-566/80-14 & 50-567/80-14.Corrective Actions: Review of Concrete Test Dispositioned in Qcir 51057 Showed Design Strength Should Be Realized at Later than Design Age
ML19338G4283 October 1980Submits Second Revised Response to Infraction Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions: Radiographs Made Before 800207 re-examined for Deficiencies. Film Processing & Shim Placement Guidelines Established
ML19338E12418 August 1980Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions: Radiographs Before 800207 re-examined & Radiographers Instructed in Requirements of Shim Placement
ML19331D14418 August 1980Forwards Revised Final Response to IE Insp Repts 50-566/ 80-03 & 50-567/80-03.Response Reflects Util Decision to Radiograph Addl Seven Welds.Rept Will Be Submitted by 801027 Re Film Darkening Problem,Per NRC Request
ML19320C02411 July 1980Forwards Revised Final Deficiency Rept Re Placement of Earthfill in Essential Raw Cooling Water Spray Pond
ML19320C54710 July 1980Forwards Final Deficiency Rept Re Const QA Audit
ML19320C53710 July 1980Forwards Final Deficiency Rept Re Placement of Earthfill in ERCW Spray Pond
ML19320C2259 July 1980Forwards Second Interim Deficiency Rept Re Const QA Audit. Next Rept Will Be Submitted by 800820.W/o Encl
ML19318A37513 June 1980Forwards Final Deficiency Rept Re Defective Concrete Pour in Auxiliary Bldg
ML19310A43110 June 1980Responds to IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish Adequate Measures to Control Radiography.Radiography of Welds Scheduled for Completion by 800701
ML19312E48527 May 1980Forwards First Interim Deficiency Rept Re Placement & Compaction of Concrete Pour A2-D1
ML19316B07127 May 1980Forwards First Interim Deficiency Rept Re Const QA Audit YC-C-80-05.Next Rept Will Be Submitted by 800710
ML19323F13621 May 1980Forwards First Interim Deficiency Rept Re Const QA Audit
ML19323G60019 May 1980Advises That Ah Gutterman Will No Longer Appear in Proceedings on Behalf of Util
ML19323J07719 May 1980Responds to NRC 800424 Ltr Re Violations Noted in IE Insp Repts 50-566/80-07 & 50-567/80-07.Corrective Actions:Purge Air Blower Filters & Solenoid Valve Cleaned
ML19309H4955 May 1980Forwards Second Interim Deficiency Rept Re Incorrect Use of Inertia Resulting in shear-related,cross-sectional Property Calculations for Control Bldg
ML19312E33328 April 1980Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective actions:800324 & 0421 Submittals revised.Re-evaluation of Radiographs Showed Only Seven Welds Will Require Reradiographing
ML19309G41628 April 1980Forwards Revised Response to Violation Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish & Control Radiography.Film Interpreters & Radiographers Instructed in Shim Placement
ML19344D66921 April 1980Forwards First Interim Deficiency Rept Re Defective Concrete Pour in Auxiliary Bldg.Next Rept Will Be Submitted by 800613
ML19312E34221 April 1980Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Advises That Revised Response to 800409 Ltr Will Be Submitted by 800428
ML19344D63821 April 1980Forwards First Interim Deficiency Rept Re Improper Documentation & Utilization of Computer Program Inertia. Next Rept Will Be Submitted by 800801
ML19354C30721 April 1980Notifies That Revised Response to Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish Adequate Measures to Control Radiography,Will Be Submitted by 800428
ML19309F12015 April 1980Forwards YCNP-SMR 3, Socioeconimic Monitoring & Mitigation Rept, for Jan-June 1979
ML19309A48824 March 1980Forwards Response to Infraction Noted in NRC 800228 Ltr Re IE Insp Repts 50-566/80-03 & 50-567/80-03.Radiographs W/Unacceptable Shim Placement Will Be Reshot.Film Interpreters & Radiographers Instructed in Shim Placement
ML19309F58724 March 1980Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions:All Radiographs W/Unacceptable Shim Placement Will Be Reshot
ML19296D14722 February 1980Forwards Final Deficiency Rept Re Defective Electrical Conduit
ML19305C81123 January 1980Responds to NRC 791228 Ltr Re Violations Noted in IE Insp Repts 50-566/79-18 & 50-567/79-18.Corrective Actions: Chemical & Vol Control Sys Charging Pumps Relocated from Storage to Area W/Power Supply.Heaters Connected
ML19260D87021 December 1979Forwards Response to NRC 791130 Ltr Re Violation Noted in IE Insp Repts 50-566/79-17 & 50-567/79-17.Corrective Actions:Testing Program Initiated to Provide Necessary Chemical Analysis Info for All Cb & I Welds on Containment
ML19256F64326 November 1979Forwards First Interim Deficiency Rept Re Defective Electrical Conduit