Responds to NRC 791228 Ltr Re Violations Noted in IE Insp Repts 50-566/79-18 & 50-567/79-18.Corrective Actions: Chemical & Vol Control Sys Charging Pumps Relocated from Storage to Area W/Power Supply.Heaters Connected
ML19305C811
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 01/23/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19305C798 List:
References
NUDOCS 8004100495
Download: ML19305C811 (2)


Text

-. . . _. - .. .- . _ . ,_ _. - -- - - - - . -

O

O, Tessesses v^t'ev Aursoniry CHATTANOOGA. TENNESSEER3I I C PEm J. .: ,

v>

400 Chestnut Street Tower dETA. 0' 2

January l 23,)1980t d @ N *. g . g s{

Mr. James P. O'Reilly, Director j Office of Inspection and Enforcement .

U.S. Nuclear Regulatory Commission '

, Region II - Suite 3100 4

101 Marietta Street l

Atlanta, Georgia 30303 '

Dear Mr. O'Reilly:

' YELLOW CREEK NUCLEAR PLANT UNITS 1 AND 2 - INFRACTION 50-566/50-567/

79-18 CVCS CHARGING PUMP MOTOR SPACE IIEATERS DEENERGIZED ,

This is 1.' response to C. E. Murphy's letter dated December 28, 1979, RII: TUG 50-566/79-18, 50-567/79-18, concerning activities at the t

Yellow Creek Puclear Plant which appeared to have been in violation of NRC regulaties. Enclosed is our response to the citation.

4 If you have any questions concerning this matter, please get in touch '

I 1

with D. L. Lambert at FTS 854-2581.

I Very truly yours, 1

TENNESSEE VALLEY AUTii0RITY l s

Y}O M

. 'M. Mills, Manager Nuclear Regulation and Safety ,

t

[ Enclosure i cc: Mr. Victor Stello, Jr., Director (Enclosure)  !

Office of Ins p0: tion and Enforcement t U.S. Nuclear Regulatory Commission Washington, DC 20555 l 6

a 3o0410?9' M .

gg7,

[ An Equal Opportunity Employer

. - . . - - - ...,.; ,., _ . ...... -  : - = . r- - - :.-. . -

L 0

ENCLOSURE YELLOW CREER NUCLEAR PLANT UNITS 1 AND 2 INFRACTION 566/567/79-18-02 i CVCS CHARGING PUMP MOTOR SPACE 11 EATERS DEENERGIZED Infraction 79-18-02  ;

i As required by Criterion V of Appendix B to 10 CFR 50 and as implemented by TVA Topical Report TVA-TR75-1A, Section 17.1A.5, " Activities af fecting quality shall be prescribed by documented instructions, procedures, or drawings. . .and shall be accomplished in accordance with these instruc-tions, procedures, or drawings." Receiving, Inspection, Storage, and Preventive Maintenance Instruction M-121, Revision 0, requires that space heaters on the safety-related chemical and volume control system -

(CVCS) charging pumps be energized at all times.

Contrary to the above, on December 12, 1979, the six CVCS charging pumps in storage at Warehouse A had neither power applied to their space heaters nor arrangements for providing power to the space heaters.

Corrective Action Taken and Results Achieved Quality Control Inspection Report (QCIR) 12499 was issued to document this deficiency. The motors were then relocated to another area within the B-level storage in Warehouse A which had provisions for supplying power.

The heaters were then connected and energized. The motors, in accordance with manufacturer's instructions, will be meggered before they are placed into final operation. This will locate any damage which may have been incurred.

Steps Taken to Avoid Recurrence To preclude recurrence of this problem, the Materials Services Unit (MSU) will review the Receiving, Inspection, Storage, and Preventive Maintenance Instructions for the applicable storage requirements as received items are placed into the preventive maintenance program. Additionally, the MSU will review manufacturer's instructions and note any instructions affixed to equipment.

Date of Full Compliance Full compliance was achieved on December 27, 1979.