ML19320C547
ML19320C547 | |
Person / Time | |
---|---|
Site: | Yellow Creek |
Issue date: | 07/10/1980 |
From: | Mills L TENNESSEE VALLEY AUTHORITY |
To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
Shared Package | |
ML19320C548 | List: |
References | |
NUDOCS 8007170356 | |
Download: ML19320C547 (1) | |
Similar Documents at Yellow Creek | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20153E4221988-08-29029 August 1988
[Table view]Forwards Order Revoking CPPR-172 & CPPR-173 & NRC Staff Evaluation of Site Stabilization Plan Per from Util ML20153E2331988-08-26026 August 1988 Forwards Status of Site Stabilization Activities,Per R Auluck Request.Tva Has Completed All Major Site Stabilization Activities at Plant W/Only Minor Maint Activities Remaining ML20215C5661986-10-0606 October 1986 Further Response to FOIA Request for All Records Concerning Allegations That Pullman Power Products Employees Intimidated QC Inspectors.Forwards App F Documents.App G & H Documents Withheld (Ref FOIA Exemptions 7 & 5) ML20133N7321985-10-24024 October 1985 Forwards Proposed Cancellation Plans for Plants Officially Canceled on 840829.Requests Withdrawal of CPPR-150,CPPR-152, CPPR-172 & CPPR-173.W/two Oversize Drawings ML20128Q2441985-05-17017 May 1985 Further Response to FOIA Request for Six Categories of Records Re Nuclear Waste Policy Act.App B Documents Available in Pdr.Forwards App C Documents ML18029A3981985-02-27027 February 1985 Responds to RM Diggs 850117 & 0211 Ltrs Re Determination of Fees for Const Extension Requests.Util Supports NRC Determination & Will Submit Fees ML20096F8731984-09-0505 September 1984 Forwards Motion to Terminate Appellate Jurisdiction.W/O Encl.Related Correspondence ML20077G6661983-07-27027 July 1983 Part 21 Rept Re Circuit Breakers Mfg Between Nov 1981 & Feb 1982.Breakers Should Be Inspected for Broken Puffer Linkage Studs.Stud Identified as Part Number 192247A.List of Circuit Breakers for Nuclear Plants Encl ML20023C3361983-05-12012 May 1983 Forwards Details of Deferral Plans for Yellow Creek Nuclear Plant. ML20073S5851983-02-24024 February 1983 FOIA Request for All Documents Re Decision to Terminate Const of Facility ML20071B9741983-02-24024 February 1983 Reiterates 830121 Request for CP Extension Until 870901 to Permit Final Decision Re Future of Nuclear Units Based on Load Growth/Demand.Deferral Plan Details to Be Submitted by 830506 ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20055C0611982-08-0606 August 1982 Forwards Info Re QA for Deferred Plants,In Response to NRC .Possible Cancellation of Some Units Will Be Discussed at Future Meeting of TVA Board of Directors ML20054K8881982-06-29029 June 1982 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept YCNP-SMR-7, Jan-June 1981 ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20052F0901982-05-0404 May 1982 Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds ML20069B9611982-03-0202 March 1982 Informs of Changes Re Slowdown in Const Activities.Busing of Employees No Longer Justifiable Due to Lower Employment Levels & Const Schedule Changes.Waterfowl Wetlands Wildlife Monitoring Results Show Const Has Not Affected Wildlife ML20040H4141982-02-10010 February 1982 Notifies That Facilities Ref CENPD-210,Revision 3 Per 820202 Request.Info Based on Review of PSARs ML20039B5581981-12-17017 December 1981 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept, Per Fes Section 4.5.2.5 ML20039A2811981-12-0404 December 1981 Notifies That Environ Const Noise Monitoring Procedures Will Be Revised at Hartsville & Yellow Creek & Terminated at Phipps Bend.Changes Caused by Slowdown & Cessation of Const. Summary of Const Noise Monitoring Program History Encl ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20004B4021981-05-21021 May 1981 Responds to Violations Noted in IE Insp Repts 50-566/81-02 & 50-567/81-02 Re Failure to Establish Adequate Measures to Control Welding & Nondestructive Exam.Rept Revises 810330 Rept to Reflect Bend Sample Fissure Evaluation Results ML19350D9121981-05-20020 May 1981 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept, Jan-June 1981 ML19350C7811981-03-30030 March 1981 Responds to NRC 810304 Ltr Re Violations Noted in IE Insp Repts 50-566/81-02 & 50-567/81-02.Corrective Actions: Certification of Welders Previously Certified Were Revoked & Are Tracking Potentially Unacceptable Welds ML19341D3021981-02-26026 February 1981 Forwards Revised Description of Onsite Meteorological Measurements Program.Revision Will Be Included in OL Application ML20003A0731981-01-26026 January 1981 Advises of Work W/Three Counties in Ms to Upgrade Emergency Response Capabilities.Requests That NRC Ltr Be Sent to Local Officials Explaining Use of Mitigation Funds for Emergency Response ML19341A0831980-12-23023 December 1980 Responds to NRC 801125 Ltr Re Violations Noted in IE Insp Repts 50-566/80-17 & 50-567/80-17.Corrective Actions:Part Ii,Section 5.1 of Div of Nuclear Power Operational QA Manual Rewritten ML19345D5871980-12-0505 December 1980 Forwards Socioeconomic Monitoring & Mitigation Rept, Semiannual Rept for Jul-Dec.Rept Prepared for Fes ML19338G6101980-10-24024 October 1980 Requests Expedited Review of Newport News Industrial Corp Draft Topical Rept Re Vol Reduction Sys.Util Plans to Utilize Sys at Units 1 & 2 ML19338G2151980-10-21021 October 1980 Forwards Response to NRC 800926 Lr Re Violation Noted in IE Insp Repts 50-566/80-14 & 50-567/80-14.Corrective Actions: Review of Concrete Test Dispositioned in Qcir 51057 Showed Design Strength Should Be Realized at Later than Design Age ML19338G4281980-10-0303 October 1980 Submits Second Revised Response to Infraction Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions: Radiographs Made Before 800207 re-examined for Deficiencies. Film Processing & Shim Placement Guidelines Established ML19338E1241980-08-18018 August 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions: Radiographs Before 800207 re-examined & Radiographers Instructed in Requirements of Shim Placement ML19331D1441980-08-18018 August 1980 Forwards Revised Final Response to IE Insp Repts 50-566/ 80-03 & 50-567/80-03.Response Reflects Util Decision to Radiograph Addl Seven Welds.Rept Will Be Submitted by 801027 Re Film Darkening Problem,Per NRC Request ML19320C0241980-07-11011 July 1980 Forwards Revised Final Deficiency Rept Re Placement of Earthfill in Essential Raw Cooling Water Spray Pond ML19320C5471980-07-10010 July 1980 Forwards Final Deficiency Rept Re Const QA Audit ML19320C5371980-07-10010 July 1980 Forwards Final Deficiency Rept Re Placement of Earthfill in ERCW Spray Pond ML19320C2251980-07-0909 July 1980 Forwards Second Interim Deficiency Rept Re Const QA Audit. Next Rept Will Be Submitted by 800820.W/o Encl ML19318A3751980-06-13013 June 1980 Forwards Final Deficiency Rept Re Defective Concrete Pour in Auxiliary Bldg ML19310A4311980-06-10010 June 1980 Responds to IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish Adequate Measures to Control Radiography.Radiography of Welds Scheduled for Completion by 800701 ML19320D6471980-06-0303 June 1980 Forwards Do Jourdan 800328 Ltr for Consideration ML19316B0711980-05-27027 May 1980 Forwards First Interim Deficiency Rept Re Const QA Audit YC-C-80-05.Next Rept Will Be Submitted by 800710 ML19312E4851980-05-27027 May 1980 Forwards First Interim Deficiency Rept Re Placement & Compaction of Concrete Pour A2-D1 ML19323F1361980-05-21021 May 1980 Forwards First Interim Deficiency Rept Re Const QA Audit ML19316A7591980-05-19019 May 1980 Requests NRC Cooperation in Expediting Approval of York Model 299 Type 3G Moisture Separator Discussed in Topical Rept York 80-67459,submitted 800331.Separators Required by Util by 800822 Due to Const Delays ML19323G6001980-05-19019 May 1980 Advises That Ah Gutterman Will No Longer Appear in Proceedings on Behalf of Util ML19323J0771980-05-19019 May 1980 Responds to NRC 800424 Ltr Re Violations Noted in IE Insp Repts 50-566/80-07 & 50-567/80-07.Corrective Actions:Purge Air Blower Filters & Solenoid Valve Cleaned ML19309H4951980-05-0505 May 1980 Forwards Second Interim Deficiency Rept Re Incorrect Use of Inertia Resulting in shear-related,cross-sectional Property Calculations for Control Bldg ML19309G4161980-04-28028 April 1980 Forwards Revised Response to Violation Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish & Control Radiography.Film Interpreters & Radiographers Instructed in Shim Placement ML19312E3331980-04-28028 April 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective actions:800324 & 0421 Submittals revised.Re-evaluation of Radiographs Showed Only Seven Welds Will Require Reradiographing ML19344D6381980-04-21021 April 1980 Forwards First Interim Deficiency Rept Re Improper Documentation & Utilization of Computer Program Inertia. Next Rept Will Be Submitted by 800801 1988-08-29 Category:INCOMING CORRESPONDENCE MONTHYEARML20153E2331988-08-26026 August 1988
[Table view]Forwards Status of Site Stabilization Activities,Per R Auluck Request.Tva Has Completed All Major Site Stabilization Activities at Plant W/Only Minor Maint Activities Remaining ML20133N7321985-10-24024 October 1985 Forwards Proposed Cancellation Plans for Plants Officially Canceled on 840829.Requests Withdrawal of CPPR-150,CPPR-152, CPPR-172 & CPPR-173.W/two Oversize Drawings ML18029A3981985-02-27027 February 1985 Responds to RM Diggs 850117 & 0211 Ltrs Re Determination of Fees for Const Extension Requests.Util Supports NRC Determination & Will Submit Fees ML20096F8731984-09-0505 September 1984 Forwards Motion to Terminate Appellate Jurisdiction.W/O Encl.Related Correspondence ML20023C3361983-05-12012 May 1983 Forwards Details of Deferral Plans for Yellow Creek Nuclear Plant. ML20073S5851983-02-24024 February 1983 FOIA Request for All Documents Re Decision to Terminate Const of Facility ML20071B9741983-02-24024 February 1983 Reiterates 830121 Request for CP Extension Until 870901 to Permit Final Decision Re Future of Nuclear Units Based on Load Growth/Demand.Deferral Plan Details to Be Submitted by 830506 ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20055C0611982-08-0606 August 1982 Forwards Info Re QA for Deferred Plants,In Response to NRC .Possible Cancellation of Some Units Will Be Discussed at Future Meeting of TVA Board of Directors ML20054K8881982-06-29029 June 1982 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept YCNP-SMR-7, Jan-June 1981 ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20052F0901982-05-0404 May 1982 Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds ML20069B9611982-03-0202 March 1982 Informs of Changes Re Slowdown in Const Activities.Busing of Employees No Longer Justifiable Due to Lower Employment Levels & Const Schedule Changes.Waterfowl Wetlands Wildlife Monitoring Results Show Const Has Not Affected Wildlife ML20040H4141982-02-10010 February 1982 Notifies That Facilities Ref CENPD-210,Revision 3 Per 820202 Request.Info Based on Review of PSARs ML20039B5581981-12-17017 December 1981 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept, Per Fes Section 4.5.2.5 ML20039A2811981-12-0404 December 1981 Notifies That Environ Const Noise Monitoring Procedures Will Be Revised at Hartsville & Yellow Creek & Terminated at Phipps Bend.Changes Caused by Slowdown & Cessation of Const. Summary of Const Noise Monitoring Program History Encl ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20004B4021981-05-21021 May 1981 Responds to Violations Noted in IE Insp Repts 50-566/81-02 & 50-567/81-02 Re Failure to Establish Adequate Measures to Control Welding & Nondestructive Exam.Rept Revises 810330 Rept to Reflect Bend Sample Fissure Evaluation Results ML19350D9121981-05-20020 May 1981 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept, Jan-June 1981 ML19350C7811981-03-30030 March 1981 Responds to NRC 810304 Ltr Re Violations Noted in IE Insp Repts 50-566/81-02 & 50-567/81-02.Corrective Actions: Certification of Welders Previously Certified Were Revoked & Are Tracking Potentially Unacceptable Welds ML19341D3021981-02-26026 February 1981 Forwards Revised Description of Onsite Meteorological Measurements Program.Revision Will Be Included in OL Application ML20003A0731981-01-26026 January 1981 Advises of Work W/Three Counties in Ms to Upgrade Emergency Response Capabilities.Requests That NRC Ltr Be Sent to Local Officials Explaining Use of Mitigation Funds for Emergency Response ML19341A0831980-12-23023 December 1980 Responds to NRC 801125 Ltr Re Violations Noted in IE Insp Repts 50-566/80-17 & 50-567/80-17.Corrective Actions:Part Ii,Section 5.1 of Div of Nuclear Power Operational QA Manual Rewritten ML19345D5871980-12-0505 December 1980 Forwards Socioeconomic Monitoring & Mitigation Rept, Semiannual Rept for Jul-Dec.Rept Prepared for Fes ML19338G6101980-10-24024 October 1980 Requests Expedited Review of Newport News Industrial Corp Draft Topical Rept Re Vol Reduction Sys.Util Plans to Utilize Sys at Units 1 & 2 ML19338G2151980-10-21021 October 1980 Forwards Response to NRC 800926 Lr Re Violation Noted in IE Insp Repts 50-566/80-14 & 50-567/80-14.Corrective Actions: Review of Concrete Test Dispositioned in Qcir 51057 Showed Design Strength Should Be Realized at Later than Design Age ML19338G4281980-10-0303 October 1980 Submits Second Revised Response to Infraction Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions: Radiographs Made Before 800207 re-examined for Deficiencies. Film Processing & Shim Placement Guidelines Established ML19338E1241980-08-18018 August 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions: Radiographs Before 800207 re-examined & Radiographers Instructed in Requirements of Shim Placement ML19331D1441980-08-18018 August 1980 Forwards Revised Final Response to IE Insp Repts 50-566/ 80-03 & 50-567/80-03.Response Reflects Util Decision to Radiograph Addl Seven Welds.Rept Will Be Submitted by 801027 Re Film Darkening Problem,Per NRC Request ML19320C0241980-07-11011 July 1980 Forwards Revised Final Deficiency Rept Re Placement of Earthfill in Essential Raw Cooling Water Spray Pond ML19320C5471980-07-10010 July 1980 Forwards Final Deficiency Rept Re Const QA Audit ML19320C5371980-07-10010 July 1980 Forwards Final Deficiency Rept Re Placement of Earthfill in ERCW Spray Pond ML19320C2251980-07-0909 July 1980 Forwards Second Interim Deficiency Rept Re Const QA Audit. Next Rept Will Be Submitted by 800820.W/o Encl ML19318A3751980-06-13013 June 1980 Forwards Final Deficiency Rept Re Defective Concrete Pour in Auxiliary Bldg ML19310A4311980-06-10010 June 1980 Responds to IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish Adequate Measures to Control Radiography.Radiography of Welds Scheduled for Completion by 800701 ML19320D6471980-06-0303 June 1980 Forwards Do Jourdan 800328 Ltr for Consideration ML19312E4851980-05-27027 May 1980 Forwards First Interim Deficiency Rept Re Placement & Compaction of Concrete Pour A2-D1 ML19316B0711980-05-27027 May 1980 Forwards First Interim Deficiency Rept Re Const QA Audit YC-C-80-05.Next Rept Will Be Submitted by 800710 ML19323F1361980-05-21021 May 1980 Forwards First Interim Deficiency Rept Re Const QA Audit ML19323G6001980-05-19019 May 1980 Advises That Ah Gutterman Will No Longer Appear in Proceedings on Behalf of Util ML19323J0771980-05-19019 May 1980 Responds to NRC 800424 Ltr Re Violations Noted in IE Insp Repts 50-566/80-07 & 50-567/80-07.Corrective Actions:Purge Air Blower Filters & Solenoid Valve Cleaned ML19316A7591980-05-19019 May 1980 Requests NRC Cooperation in Expediting Approval of York Model 299 Type 3G Moisture Separator Discussed in Topical Rept York 80-67459,submitted 800331.Separators Required by Util by 800822 Due to Const Delays ML19309H4951980-05-0505 May 1980 Forwards Second Interim Deficiency Rept Re Incorrect Use of Inertia Resulting in shear-related,cross-sectional Property Calculations for Control Bldg ML19312E3331980-04-28028 April 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective actions:800324 & 0421 Submittals revised.Re-evaluation of Radiographs Showed Only Seven Welds Will Require Reradiographing ML19309G4161980-04-28028 April 1980 Forwards Revised Response to Violation Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish & Control Radiography.Film Interpreters & Radiographers Instructed in Shim Placement ML19312E3421980-04-21021 April 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Advises That Revised Response to 800409 Ltr Will Be Submitted by 800428 ML19344D6691980-04-21021 April 1980 Forwards First Interim Deficiency Rept Re Defective Concrete Pour in Auxiliary Bldg.Next Rept Will Be Submitted by 800613 ML19344D6381980-04-21021 April 1980 Forwards First Interim Deficiency Rept Re Improper Documentation & Utilization of Computer Program Inertia. Next Rept Will Be Submitted by 800801 ML19354C3071980-04-21021 April 1980 Notifies That Revised Response to Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish Adequate Measures to Control Radiography,Will Be Submitted by 800428 ML19309F1201980-04-15015 April 1980 Forwards YCNP-SMR 3, Socioeconimic Monitoring & Mitigation Rept, for Jan-June 1979 1988-08-26 Category:UTILITY TO NRC MONTHYEARML20153E2331988-08-26026 August 1988
[Table view]Forwards Status of Site Stabilization Activities,Per R Auluck Request.Tva Has Completed All Major Site Stabilization Activities at Plant W/Only Minor Maint Activities Remaining ML20133N7321985-10-24024 October 1985 Forwards Proposed Cancellation Plans for Plants Officially Canceled on 840829.Requests Withdrawal of CPPR-150,CPPR-152, CPPR-172 & CPPR-173.W/two Oversize Drawings ML18029A3981985-02-27027 February 1985 Responds to RM Diggs 850117 & 0211 Ltrs Re Determination of Fees for Const Extension Requests.Util Supports NRC Determination & Will Submit Fees ML20096F8731984-09-0505 September 1984 Forwards Motion to Terminate Appellate Jurisdiction.W/O Encl.Related Correspondence ML20023C3361983-05-12012 May 1983 Forwards Details of Deferral Plans for Yellow Creek Nuclear Plant. ML20071B9741983-02-24024 February 1983 Reiterates 830121 Request for CP Extension Until 870901 to Permit Final Decision Re Future of Nuclear Units Based on Load Growth/Demand.Deferral Plan Details to Be Submitted by 830506 ML20069D8691982-09-20020 September 1982 Forwards Black Fox Station Soil Stabilization & Erosion Control Program, Per ASLB 820618 Memorandum & Order.Plan Addresses Concerns Raised in NRC 820602 Submittal ML20055C0611982-08-0606 August 1982 Forwards Info Re QA for Deferred Plants,In Response to NRC .Possible Cancellation of Some Units Will Be Discussed at Future Meeting of TVA Board of Directors ML20054K8881982-06-29029 June 1982 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept YCNP-SMR-7, Jan-June 1981 ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20069B9611982-03-0202 March 1982 Informs of Changes Re Slowdown in Const Activities.Busing of Employees No Longer Justifiable Due to Lower Employment Levels & Const Schedule Changes.Waterfowl Wetlands Wildlife Monitoring Results Show Const Has Not Affected Wildlife ML20039B5581981-12-17017 December 1981 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept, Per Fes Section 4.5.2.5 ML20039A2811981-12-0404 December 1981 Notifies That Environ Const Noise Monitoring Procedures Will Be Revised at Hartsville & Yellow Creek & Terminated at Phipps Bend.Changes Caused by Slowdown & Cessation of Const. Summary of Const Noise Monitoring Program History Encl ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20004B4021981-05-21021 May 1981 Responds to Violations Noted in IE Insp Repts 50-566/81-02 & 50-567/81-02 Re Failure to Establish Adequate Measures to Control Welding & Nondestructive Exam.Rept Revises 810330 Rept to Reflect Bend Sample Fissure Evaluation Results ML19350D9121981-05-20020 May 1981 Forwards Yellow Creek Nuclear Plant Socioeconomic Monitoring & Mitigation Rept, Jan-June 1981 ML19350C7811981-03-30030 March 1981 Responds to NRC 810304 Ltr Re Violations Noted in IE Insp Repts 50-566/81-02 & 50-567/81-02.Corrective Actions: Certification of Welders Previously Certified Were Revoked & Are Tracking Potentially Unacceptable Welds ML19341D3021981-02-26026 February 1981 Forwards Revised Description of Onsite Meteorological Measurements Program.Revision Will Be Included in OL Application ML19341A0831980-12-23023 December 1980 Responds to NRC 801125 Ltr Re Violations Noted in IE Insp Repts 50-566/80-17 & 50-567/80-17.Corrective Actions:Part Ii,Section 5.1 of Div of Nuclear Power Operational QA Manual Rewritten ML19345D5871980-12-0505 December 1980 Forwards Socioeconomic Monitoring & Mitigation Rept, Semiannual Rept for Jul-Dec.Rept Prepared for Fes ML19338G6101980-10-24024 October 1980 Requests Expedited Review of Newport News Industrial Corp Draft Topical Rept Re Vol Reduction Sys.Util Plans to Utilize Sys at Units 1 & 2 ML19338G2151980-10-21021 October 1980 Forwards Response to NRC 800926 Lr Re Violation Noted in IE Insp Repts 50-566/80-14 & 50-567/80-14.Corrective Actions: Review of Concrete Test Dispositioned in Qcir 51057 Showed Design Strength Should Be Realized at Later than Design Age ML19338G4281980-10-0303 October 1980 Submits Second Revised Response to Infraction Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions: Radiographs Made Before 800207 re-examined for Deficiencies. Film Processing & Shim Placement Guidelines Established ML19338E1241980-08-18018 August 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions: Radiographs Before 800207 re-examined & Radiographers Instructed in Requirements of Shim Placement ML19331D1441980-08-18018 August 1980 Forwards Revised Final Response to IE Insp Repts 50-566/ 80-03 & 50-567/80-03.Response Reflects Util Decision to Radiograph Addl Seven Welds.Rept Will Be Submitted by 801027 Re Film Darkening Problem,Per NRC Request ML19320C0241980-07-11011 July 1980 Forwards Revised Final Deficiency Rept Re Placement of Earthfill in Essential Raw Cooling Water Spray Pond ML19320C5471980-07-10010 July 1980 Forwards Final Deficiency Rept Re Const QA Audit ML19320C5371980-07-10010 July 1980 Forwards Final Deficiency Rept Re Placement of Earthfill in ERCW Spray Pond ML19320C2251980-07-0909 July 1980 Forwards Second Interim Deficiency Rept Re Const QA Audit. Next Rept Will Be Submitted by 800820.W/o Encl ML19318A3751980-06-13013 June 1980 Forwards Final Deficiency Rept Re Defective Concrete Pour in Auxiliary Bldg ML19310A4311980-06-10010 June 1980 Responds to IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish Adequate Measures to Control Radiography.Radiography of Welds Scheduled for Completion by 800701 ML19312E4851980-05-27027 May 1980 Forwards First Interim Deficiency Rept Re Placement & Compaction of Concrete Pour A2-D1 ML19316B0711980-05-27027 May 1980 Forwards First Interim Deficiency Rept Re Const QA Audit YC-C-80-05.Next Rept Will Be Submitted by 800710 ML19323F1361980-05-21021 May 1980 Forwards First Interim Deficiency Rept Re Const QA Audit ML19323G6001980-05-19019 May 1980 Advises That Ah Gutterman Will No Longer Appear in Proceedings on Behalf of Util ML19323J0771980-05-19019 May 1980 Responds to NRC 800424 Ltr Re Violations Noted in IE Insp Repts 50-566/80-07 & 50-567/80-07.Corrective Actions:Purge Air Blower Filters & Solenoid Valve Cleaned ML19309H4951980-05-0505 May 1980 Forwards Second Interim Deficiency Rept Re Incorrect Use of Inertia Resulting in shear-related,cross-sectional Property Calculations for Control Bldg ML19312E3331980-04-28028 April 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective actions:800324 & 0421 Submittals revised.Re-evaluation of Radiographs Showed Only Seven Welds Will Require Reradiographing ML19309G4161980-04-28028 April 1980 Forwards Revised Response to Violation Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish & Control Radiography.Film Interpreters & Radiographers Instructed in Shim Placement ML19344D6691980-04-21021 April 1980 Forwards First Interim Deficiency Rept Re Defective Concrete Pour in Auxiliary Bldg.Next Rept Will Be Submitted by 800613 ML19312E3421980-04-21021 April 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Advises That Revised Response to 800409 Ltr Will Be Submitted by 800428 ML19344D6381980-04-21021 April 1980 Forwards First Interim Deficiency Rept Re Improper Documentation & Utilization of Computer Program Inertia. Next Rept Will Be Submitted by 800801 ML19354C3071980-04-21021 April 1980 Notifies That Revised Response to Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03 Re Failure to Establish Adequate Measures to Control Radiography,Will Be Submitted by 800428 ML19309F1201980-04-15015 April 1980 Forwards YCNP-SMR 3, Socioeconimic Monitoring & Mitigation Rept, for Jan-June 1979 ML19309A4881980-03-24024 March 1980 Forwards Response to Infraction Noted in NRC 800228 Ltr Re IE Insp Repts 50-566/80-03 & 50-567/80-03.Radiographs W/Unacceptable Shim Placement Will Be Reshot.Film Interpreters & Radiographers Instructed in Shim Placement ML19309F5871980-03-24024 March 1980 Responds to NRC 800228 Ltr Re Violations Noted in IE Insp Repts 50-566/80-03 & 50-567/80-03.Corrective Actions:All Radiographs W/Unacceptable Shim Placement Will Be Reshot ML19296D1471980-02-22022 February 1980 Forwards Final Deficiency Rept Re Defective Electrical Conduit ML19305C8111980-01-23023 January 1980 Responds to NRC 791228 Ltr Re Violations Noted in IE Insp Repts 50-566/79-18 & 50-567/79-18.Corrective Actions: Chemical & Vol Control Sys Charging Pumps Relocated from Storage to Area W/Power Supply.Heaters Connected ML19260D8701979-12-21021 December 1979 Forwards Response to NRC 791130 Ltr Re Violation Noted in IE Insp Repts 50-566/79-17 & 50-567/79-17.Corrective Actions:Testing Program Initiated to Provide Necessary Chemical Analysis Info for All Cb & I Welds on Containment ML19256F6431979-11-26026 November 1979 Forwards First Interim Deficiency Rept Re Defective Electrical Conduit 1988-08-26 |
Text
_ _ _ _ _ _ _ _ _ _ _
. k i !
TENNESSEE VALLEY AUTHORITY T dies $nuc Ytr"eYt Yow *e/ II July 10,1930 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Dear Mr. O'Reilly:
YELLOW CREEK NUCLMR PLANT UNITS 1 AND 2 - CONSTRUCTION QA ALTIT YC-C-60 FINAL REPORT The subject deficiency was initially reported to NRC-0IE Inspector M. Thomas on April 25, 1960, in accordance with 10 CFR 50.55(e).
Enclosed is our final report. An interim report was submitted on May 27, 19do.
If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 357-2581.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure cc: Mr. Victor Stallo, Jr., Director (Encicaure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 f Bo/f s
//
L
^""
8007170 V8 """"'5**'"*'