Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RBG-33517, Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed | 10 September 1990 | Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed | Condition Adverse to Quality |
RBG-33466, Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range | 30 August 1990 | Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range | Post Accident Monitoring |
ML17056A977 | 30 August 1990 | Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Revs 4 & 5 to Odcm. | |
ML18038A323 | 30 August 1990 | Forwards Semiannual Radioactive Effluent Release Rept Jan- June 1990 & Revs 6-8 to Odcm. Radioactive Effluent Release Rept Includes Summary of Liquid,Gaseous & Solid Effluents & Justification for Revs to ODCM | Grab sample Annual Radiological Environmental Operating Report Process Control Program |
RBG-33496, Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment | 28 August 1990 | Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment | |
RBG-33460, Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.21 | 28 August 1990 | Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.21 | |
RBG-33450, Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-900301 | 28 August 1990 | Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-900301 | |
ML17286A280 | 27 August 1990 | Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d) | Fitness for Duty |
ML18038A322 | 24 August 1990 | Forwards NRC Form 474, Simulation Facility Certification & Supporting Documentation | Emergency Lighting Job Performance Measure Fuel cladding Coast down |
ML17286A267 | 23 August 1990 | Provides Info on Steps Taken to Minimize Potential Effects of NRC Maint Insp Interface Record, Form on Candor of Supply Sys Personnel When Talking W/Nrc Inspectors | |
RBG-33424, Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 900929 | 22 August 1990 | Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 900929 | |
ML18038A320 | 21 August 1990 | Discusses Status of Completion of Generic Safety Issue 75, Item 2.2.2 Re Vendor Interface for safety-related Components | |
ML17285B434 | 20 August 1990 | Withdraws 900302 Request for Amend to Tech Spec 3.8.1.1, AC Sources Reducing Excessive Testing of Diesel Generators. | |
ML17286A264 | 20 August 1990 | Advises That Tech Spec Rev Re ATWS Recirculation Pump Trip Will Be Submitted by 900928,per Discussions W/ P Eng & H Lee | |
ML18038A325 | 20 August 1990 | Forwards Rev 3 to Nine Mile Point Requalification Program Action Plan, Certifying That All short-term Corrective Actions Completed | |
ML20058Q115 | 15 August 1990 | Forwards Response to Regulatory Effectiveness Review on 900604-08.Response Withheld (Ref 10CFR73.21) | |
ML17285B417 | 10 August 1990 | Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised | |
IR 05000397/1990014 | 10 August 1990 | Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised | |
RBG-33372, Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified | 10 August 1990 | Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified | |
ML17285B404 | 2 August 1990 | Submits Justification for Continued Operation W/Emergency Diesel Generator 2 Shorted Turns | |
RBG-33310, Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages | 1 August 1990 | Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages | |
RBG-33300, Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting | 30 July 1990 | Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting | |
ML17285B398 | 30 July 1990 | Advises That Installation of Detector Check Valve in Fire Protection Underground Piping Sys Complete,Per 890911 Ltr. Sys Monitors for Underground Sys Leakage Over Entire Fire Protection Sys | |
ML17285B399 | 27 July 1990 | Forwards Justification for Continued Operation Re Emergency Diesel Generator 2 Shorted Turns.Justification Concludes That Diesel Generator Capable of Supporting Present Operability Requirements of Tech Specs | |
RBG-33294, Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank | 26 July 1990 | Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank | |
ML20055G526 | 18 July 1990 | Forwards Decommissioning Rept Indicating Reasonable Assurance That Funds Available to Decommission Facility. Financial Assurance of Cotenants Also Encl | |
RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16 | 13 July 1990 | Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16 | |
ML17285B371 | 12 July 1990 | Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Confirms That Items 1,2,3,4 & 5 of Requested Actions of Operating Reactors Completed | |
ML17285B376 | 12 July 1990 | Discusses Potential for Surface Entry & Mining Near Plant Sites.Concludes That NRC Need Not Consider Issue as One Requiring Continued Monitoring | |
ML17285B378 | 11 July 1990 | Requests Waiver of Compliance from Tech Spec 3.8.1.2 Re Ac Sources - Shutdown.Waiver Will Allow Performance of Rotor Pole Ac Voltage Drop Test to Provide Confirmation That for Extended Run Degradation Condition Will Not Occur | Fuel cladding |
ML17285B384 | 10 July 1990 | Forwards Util 1990 Emergency Exercise Scenario.W/O Encl | |
ML17285B366 | 5 July 1990 | Advises of Listed Organizational & Personnel Changes, Effective 900707.J Burn Will Be New Director of Projects, C Powers Promoted to Director of Engineering & J Baker Promoted to Plant Manager | |
RBG-33150, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed | 2 July 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed | |
RBG-33143, Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 1990 | 29 June 1990 | Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 1990 | |
ML17285B364 | 29 June 1990 | Advises That All Equipment Identified W/Atws Safety Function Acceptable from Environ Qualification Standpoint. ATWS Equipment Has Been Determined to Be Qualified to Normal Design Environ Conditions Followed by ATWS Accident Environ | |
ML17285B357 | 28 June 1990 | Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. | Safe Shutdown Scram Discharge Volume |
ML20055D239 | 28 June 1990 | Forwards Response to Re Violations Noted in Insp Rept 50-397/90-12.Response Withheld (Ref 10CFR73.21) | |
RBG-33132, Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs | 28 June 1990 | Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs | Affidavit |
ML17058A584 | 27 June 1990 | Forwards Rev 8 to Updated FSAR for Nine Mile Point Unit 1. Changes Re Findings Noted in Insp Rept 50-220/88-201 Included in Rev.Rev Does Not Reflect Changes Re Reg Guide 1.97,Rev 2 | |
ML18038A305 | 26 June 1990 | Responds to Generic Ltr 90-04 Re Status of Implementation of Generic Safety Issue Requirements.Tabulated Info Re Generic Safety Issue Title,Applicability,Status & Remarks Encl | Scram Discharge Volume |
RBG-33113, Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License | 26 June 1990 | Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License | Missed surveillance |
RBG-33120, Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads | 26 June 1990 | Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads | |
RBG-33114, Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon | 26 June 1990 | Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon | |
RBG-33100, Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 1990 | 22 June 1990 | Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 1990 | Ultimate heat sink |
ML17285B350 | 22 June 1990 | Advises That Mods to Recirculation Pump Trip Sys Implemented During 1990 Spring Refueling Outage.Remaining ATWS Items to Be Resolved as Listed | |
ML17285B351 | 20 June 1990 | Forwards WPPSS-FTS-129, BWR Transient Analysis Model, for Review & Approval | |
ML17285B344 | 20 June 1990 | Advises That Util Intends to Utilize R-value of 0.13% Delta K/K in Cycle 6 Implementing Procedures.Should R-value Change in Final Startup & Operations Rept,Changed Value Shall Be Used Instead | Shutdown Margin |
ML17285B345 | 19 June 1990 | Forwards Rev 10 to EPIP 13.1.1, Classifying Emergency. Rev Includes New Format of Matrix Charts Intended to Improve Identification of Symptomatic & situation-based Emergency Conditions | |
ML17285B343 | 18 June 1990 | Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601 | |
ML17285B346 | 15 June 1990 | Responds to NRC Evaluation Findings of Licensed Operator Requalification Program.Quality of Written Exam & Job Performance Measure Question Bank Testing Matls Will Be Improved to Meet Std Prior to Next Program Evaluation Cycle | Job Performance Measure |