Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20059L665 | 21 September 1990 | Forwards Application for Amend to License NPF-1,consisting of License Change Application 203,Rev 1.Rev Reduces Scope of Previous Changes Re Tech Spec Table 3.6-1, Containment Isolation Valves | |
ML20059J969 | 14 September 1990 | Forwards Estimates of Facility Operator Licensing, Requalification & Generic Fundamentals Exam Requirements for FY91-94,per Generic Ltr 90-07 | |
ML20059J984 | 14 September 1990 | Responds to Re Violations Noted in Insp Rept 50-344/90-21.Corrective Action:Individual Employee Terminated on Day of Event | |
ML20059J032 | 7 September 1990 | Requests That Six Listed Candidates Take PWR & Generic Fundamentals Exam to Be Administered on 901010 | |
ML20059D803 | 31 August 1990 | Forwards Update on Actions for NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs | |
ML20059D083 | 30 August 1990 | Revises Response to Violations Noted in Insp Rept 50-344/90-02.License Document Change Request Correcting FSAR Discrepancy Noted in App A,Violation C Re Request for Design Change Initiated & Will Be Incorporated Into Amend 14 | |
ML20059D240 | 30 August 1990 | Extends Commitment Date from 900831 to 901031 to Amend FSAR Per Util 900404 Response to Notice of Violation | |
ML20059C174 | 28 August 1990 | Forwards Rev 31 to Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML20059D320 | 28 August 1990 | Responds to Deficiencies Identified by FEMA During 891115 Emergency Preparedness Exercise at Plant.Corrective Actions: Procedures Revised to Prioritize Roadblocks & Clearly Define Roadblocks for 5-mile & 10-mile Locations | |
ML20059D560 | 28 August 1990 | Forwards Fitness for Duty Performance Rept for 900103-0630. Overall Positive Rate for All Testing Conducted at Plant from 900103-0630 Is 0.71% | Fitness for Duty |
ML20058M786 | 3 August 1990 | Forwards Monthly Operating Rept for Jul 1990.W/o Encl | |
ML20056A155 | 31 July 1990 | Forwards Updated Response to Address Maint/Surveillance Area of SALP for Period from Jan 1989 - Mar 1990.Overall Plant Performance During Period Acceptable & Found to Be Directed Toward Safe Operation | |
ML20055J342 | 26 July 1990 | Forwards Decommissioning Financial Assurance Certification Rept for Plant,Per 10CFR50.75.Certifies That Finanical Assurance Utilizing Methodology as Listed Will Be Available to Decommission Plant | |
ML20055G713 | 20 July 1990 | Comments on Operator Licensing Exams Administered on 900717 | |
ML20055G714 | 19 July 1990 | Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Plant Has Four Rosemount Model 1153DD6 Differential Pressure Transmitters Installed to Associated Logics for Safety Injection | |
ML20055F879 | 16 July 1990 | Forwards 1989 Annual Repts for Portland General Corp,Eugene Water & Electric Board & Pacific Power & Light Co | |
ML20055F691 | 13 July 1990 | Responds to Generic Ltr 90-04, Request for Info on Status of Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions | |
ML20055F816 | 13 July 1990 | Advises of New Addressee for Nrc/Util Correspondence | |
ML20055F244 | 12 July 1990 | Forwards Response to SALP Evaluation for Jan 1989 - Mar 1990 Re Maint/Surveillance.Util Plans to Improve Performance in Areas of Operation Through Commitment of Support from Nuclear Div Mgt & Personal Involvement of Corporate Mgt | |
ML20055E340 | 6 July 1990 | Forwards Application for Renewal of Plant NPDES Permit | |
ML20055F296 | 6 July 1990 | Forwards Addl Info Re ATWS Mitigating Sys Actuation Circuitry | |
ML20055E175 | 6 July 1990 | Provides Update to 891130 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Rev to Maint Procedure 12-4, Valve Air Actuators, to Include Maint Insp Completed in Apr 1990 | |
ML20055E028 | 6 July 1990 | Informs That Actions Committed to in Util Re Replacement of Breaker During 1990 Refueling Outage & Provision of Rept Documenting Replacement of Breaker, Complete,Per NRC Bulletin 88-010 | |
ML20055E024 | 6 July 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-344/90-11.Corrective Actions:Generic Issues That Contributed to Violation Will Be Discussed During Mgt Meetings & Quality Insp Supervisor Counseled | |
ML20058K489 | 30 June 1990 | Discusses Reduced Min Measured RCS Flow for Plant.Encl Figure 3.2-3 & Evaluation Support Operation W/No Tech Spec Setpoint Changes | |
ML20055D041 | 29 June 1990 | Discusses Design Verification Program Re Main Steam Support Structure.Extension of Completion Date for Project Justified Since Documentation,Not Mod of Main Steam Support Structure Is Reason for Delay | |
ML20055D044 | 29 June 1990 | Advises That Response to Generic Ltr 90-04 Re Status of Generic Safety Issues at Facility Delayed from 900629 to 900713 | |
ML20055D709 | 26 June 1990 | Forwards Steam Generator Tube Plugging Rept,Per Inservice Insp | |
ML17347B588 | 1 March 1990 | Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits | |
ML18094B322 | 28 February 1990 | Forwards Executed Amend 14 to Indemnity Agreement B-74 | |
ML15217A103 | 28 February 1990 | Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation Manuals | Offsite Dose Calculation Manual Process Control Program |
ML20011F382 | 26 February 1990 | Confirms Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900223 for Payment of NRC Review Fees of 10CFR50 Applications & 10CFR55 Svcs Per 10CFR170,for Period of 890101-0617 for Listed Invoices | |
ML20006G062 | 22 February 1990 | Forwards Revised Proprietary Pages to DPC-NE-2004, Core Thermal Hydraulic Methodology Using VIPRE-01, Reflecting Minor Methodology Changes Made During Review & Approval Process.Pages Withheld | |
ML20055C269 | 20 February 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-344/89-30.Corrective Actions:Administrative Order 5-8 Temporary Mods to Be Evaluated for Need to Improve Control Over Temporary Mods Issued for Both Trains of Sys | |
ML20006E144 | 16 February 1990 | Forwards Suppl to Rev 1 to Updated FSAR for Braidwood Station,Units 1 & 2 & Byron Station,Units 1 & 2,per 881214 & 891214 Submittals | |
ML20006E907 | 16 February 1990 | Discusses Plants Design Control Program.Util Adopted Concept of Design Change Implementation Package (Dcip).Dcip Will Contain or Ref Design Change Notice Prepared Per Approved Procedures | |
ML20006E420 | 14 February 1990 | Requests NRC Approval for Use of Alloy 690 Steam Generator Tube Plugs for Facility,Prior to 900301,pending Final ASME Approval of Code Case for Alloy 690 | |
ML20011E615 | 12 February 1990 | Forwards Revs 1 to Security Plan & Security Training & Qualification Plan & Rev 2 to Security Contingency Plan. Salem Switchyard Project Delayed.Revs Withheld (Ref 10CFR73.21) | |
ML20011E499 | 6 February 1990 | Discusses Liability & Funding Requirements Re NRC Decommissioning Funding Rules & Verifies Understanding of Rules.Ltr from NRC Explaining Liability & Requirements of Rule Requested | |
ML20006D691 | 2 February 1990 | Provides Alternative Design Solution to Dcrdr Implementation at Facilities.Simpler Design Devised,Using Eyelet Screw Inserted in Switch Nameplate Which Is Identical to Providing Caution Cards in Close Proximity to Switch Handle | |
ML20006C566 | 31 January 1990 | Provides Certification Re Implementation of Fitness for Duty Program Per 10CFR26 at Plants | Fitness for Duty |
ML20006B796 | 29 January 1990 | Forwards Summaries of Latest ECCS Evaluation Model Changes | |
ML18153C095 | 29 January 1990 | Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Belief in Appropriateness to Address Generic Ltr 89-13 Concerns within Context of Established Programmatic Improvements Noted | Coatings Biofouling |
ML20006C671 | 29 January 1990 | Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Plants Have Established Preventive Maint Program for Intake Structure & Routine Treatment of Svc Water Sys W/Biocide to Control Biofouling | Ultimate heat sink Coatings Biofouling |
ML20006D661 | 29 January 1990 | Advises That 900117 License Amend Request to Remove Certain cycle-specific Parameter Limits from Tech Specs Inadvertently Utilized Outdated Tech Specs Pages.Requests That Tech Specs Changes Made Via Amends 101/83 Be Deleted | |
ML20011E252 | 29 January 1990 | Forwards Proprietary Safety Analysis Physics Parameters & Multidimensional Reactor Transients Methodology. Three Repts Describing EPRI Computer Code Also Encl.Proprietary Rept Withheld (Ref 10CFR2.790) | |
ML18094B286 | 26 January 1990 | Forwards Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Aggressive Program of Monitoring,Insp & Matl Replacement Initiated in Advance of Generic Ltr 89-13 Issuance | Coatings Biofouling |
ML18153C087 | 26 January 1990 | Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Refueling Procedures to Be Revised & Familiarization Sessions Will Be Conducted Prior to Each Refueling Outage | Shutdown Margin |