Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18066A690 | 1 November 1999 | Rev 5 to Palisades Nuclear Plant Colr. | Shutdown Margin |
ML20217F289 | 13 October 1999 | Drill 99-08 Emergency Preparedness Exercise on 991013 | Grab sample |
ML18066A676 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant | |
ML20217G721 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with | |
ML18066A627 | 2 September 1999 | LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr | |
ML18066A635 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant | |
ML18066A677 | 31 August 1999 | Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant | |
ML20211Q214 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With | |
ML18066A622 | 20 August 1999 | LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr | |
ML18066A606 | 31 July 1999 | Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr | |
ML20210Q636 | 31 July 1999 | Corrected Monthly Operating Rept for July 1999 for Waterford 3 | |
ML20210S058 | 31 July 1999 | Monthly Operating Rept for July 1999 for Waterford 3.With | |
ML20210D895 | 23 July 1999 | Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 | |
ML18066A520 | 30 June 1999 | Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr | |
ML20209H378 | 30 June 1999 | Monthly Operating Rept for June 1999 for Waterford 3 Ses. with | |
ML20195J895 | 17 June 1999 | Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) | Incorporated by reference |
ML20207E863 | 3 June 1999 | Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 | |
ML18066A484 | 31 May 1999 | Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr | |
ML20195K339 | 31 May 1999 | Monthly Operating Rept for May 1999 for Waterford 3 Ses.With | |
ML20195C304 | 28 May 1999 | Annual Rept on Abb CE ECCS Performance Evaluation Models | Fuel cladding |
ML18068A594 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr | |
ML18066A637 | 30 April 1999 | Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant | |
ML20206S740 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Waterford 3.With | |
ML20205T262 | 22 April 1999 | LER 99-S02-00:on 990216,contract Employee Inappropriately Granted Unescorted Access to Plant Protected Area.Caused by Personnel Error.Security Personnel Performed Review of Work & Work Area That Individual Was Involved with | |
ML18066A416 | 1 April 1999 | Rev 4 to COLR, for Palisades Nuclear Plant | Shutdown Margin |
ML18066A450 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr | |
ML18066A467 | 31 March 1999 | Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. | Safe Shutdown Earthquake Finite Element Analysis |
ML20205N967 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Waterford 3 Ses.With | |
ML20205E853 | 30 March 1999 | Corrected Pages COLR 3/4 1-4 & COLR 3/4 2-6 to Rev 1, Cycle 10, Colr | |
ML20205A633 | 25 March 1999 | SER Accepting Request to Use Mechanical Nozzle Seal Assemblies as an Alternative Repair Method,Per 10CFR50.55a(a)(3)(i) for Reactor Coolant Sys Applications at Plant,Unit 3 | Hydrostatic Incorporated by reference |
ML20204H140 | 23 March 1999 | Rev 1 to Engineering Rept C-NOME-ER-0120, Design Evaluation of Various Applications at Waterford Unit 3 | Hydrostatic |
ML20204H245 | 22 March 1999 | Rev 2 to C-NOME-SP-0067, Design Specification for Mechanical Nozzle Seal Assembly (Mnsa) Waterford Unit 3 | Code Reconciliation Scaffolding |
ML20204H123 | 22 March 1999 | Rev 1 to Design Rept C-PENG-DR-006, Addendum to Cenc Rept 1444 Analytical Rept for Waterford Unit 3 Piping | Hydrostatic Operating Basis Earthquake Incorporated by reference Finite Element Analysis Design basis earthquake Earthquake Liquid penetrant |
ML20204F079 | 17 March 1999 | Rev 1 to Waterford 3 COLR for Cycle 10 | Shutdown Margin |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
ML20207F349 | 5 March 1999 | LER 99-S01-00:on 990203,contraband Was Discovered in Plant Protected Area.Bottle Was Determined to Have Been There Since Original Plant Construction.Bottle Was Removed & Security Personnel Performed Search of Area.With | Contraband Scaffolding |
ML18068A535 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr | |
ML20204B514 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Waterford 3.With | |
ML20203H859 | 17 February 1999 | Safety Evaluation Accepting Licensee Second Ten Year ISI Program & Associated Relief Requests for Plant,Unit 3 | Boric Acid VT-2 Incorporated by reference |
ML18066A393 | 31 January 1999 | Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr | |
ML20199H626 | 21 January 1999 | Safety Evaluation Accepting Classification of Instrument Air Tubing & Components for Safety Related Valve Top Works.Staff Recommends That EOI Revise Licensing Basis to Permit Incorporation of Change | Hydrostatic |
ML18066A378 | 20 January 1999 | LER 98-013-00:on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With 990120 Ltr | |
ML20206F613 | 31 December 1998 | 1998 Consumers Energy Co Annual Rept. with | |
ML20199C910 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Waterford 3.With | |
ML18066A365 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr | |
ML20196F491 | 1 December 1998 | SER Accepting Request for Relief ISI2-09 for Waterford Steam Electric Station,Unit 3 & Arkansas Nuclear One,Unit 2 | Boric Acid High Radiation Area VT-2 Incorporated by reference Scaffolding |
ML20206N413 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Waterford 3.With | |
ML18066A342 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr | |
ML18066A330 | 11 November 1998 | Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used | |
ML20195C484 | 6 November 1998 | SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program | Temporary Modification Process Control Program |