Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G746 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20212K978 | 30 September 1999 | Safety Evaluation Accepting USI A-46 Implementation Program | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Earthquake |
ML20217G446 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pingp.With | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212C500 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station | |
ML20216E715 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with | |
ML20211D649 | 25 August 1999 | Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy | |
ML20211D398 | 24 August 1999 | Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively | Power-Operated Valves Backfit |
ML20211C253 | 4 August 1999 | Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 | Boric Acid Hydrostatic Nondestructive Examination VT-2 |
ML20210R038 | 31 July 1999 | Monthly Operating Rept for July 1999 for Cooper Nuclear Station | |
ML20210Q489 | 31 July 1999 | Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with | |
ML20211B597 | 31 July 1999 | Cycle 20 Voltage-Based Repair Criteria 90-Day Rept | |
ML20210J292 | 29 July 1999 | Special Rept:On 990406,OG TS & Associated Charcoal Absorbers Were Removed from Svc.Caused by Scheduled Maint on Hpci. Evaluation of Offsite Effluent Release Dose Effects Was Performed to Ensure Plant Remained in Compliance | |
ML20209H828 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station | Power-Operated Valves Backfit |
ML20209J113 | 15 July 1999 | Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions | Shutdown Margin |
ML20211A998 | 12 July 1999 | Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure | |
ML20209E106 | 30 June 1999 | Monthly Operating Rept for June 1999 for Cns.With | |
ML20209F981 | 30 June 1999 | Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20196F408 | 23 June 1999 | Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units | Shutdown Margin |
ML20196B385 | 17 June 1999 | Summary Rept of Facility Changes,Test & Experiments,Per 10CFR50.59 for Period 970901-990331.Summary of Commitment Changes Made During Same Time Period Also Encl | Hot Short Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Grab sample Fire Barrier Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Coatings Temporary Modification Emergency Lighting Incorporated by reference Condition Adverse to Quality Missed surveillance Abnormal operational transient Corrosion bonding Design basis earthquake Foreign Material Exclusion Scram Discharge Volume Feedwater Controller Failure Severe Accident Management Guideline Rod Drop Event Earthquake Fuel cladding Through Wall Leak Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Scaffolding Grace period |
ML20195K285 | 31 May 1999 | Monthly Operating Rept for May 1999 for Cooper Nuclear Station.With | |
ML20195G518 | 31 May 1999 | Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included | Hydrostatic |
ML20207B593 | 26 May 1999 | SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs | High Radiation Area Hydrostatic VT-2 Liquid penetrant |
ML20196L250 | 13 May 1999 | Rev 0 to PINGP Unit 1 COLR Cycle 20 | |
ML20206P048 | 12 May 1999 | Safety Evaluation Concluding That NPP Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at CNS & Adequately Addressed Actions Requested in GL 96-05 | Stroke time Past operability |
ML20206J081 | 4 May 1999 | Rev 14 to CNS QA Program for Operation | Safe Shutdown Nondestructive Examination Temporary Modification Foreign Material Exclusion Backfit |
ML20206P975 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station | |
ML20206L619 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with | |
ML20205Q089 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Cooper Nuclear Station.With | |
ML20205N108 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with | |
ML20205Q510 | 15 March 1999 | Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 | |
ML20204G895 | 15 March 1999 | CNS Inservice Insp Summary Rept Fall 1998 Refueling Outage (RFO-18) | Hydrostatic Nondestructive Examination VT-2 Finite Element Analysis Liquid penetrant |
ML20207M923 | 12 March 1999 | Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results | |
ML20204B370 | 11 March 1999 | SER Accepting Third 10-year Interval Inservice Insp Plan Requests for Relief for RI-17,Rev 1 and RI-25,Rev 0.Request for Relief RI-13,Rev 2 Involving Snubber Testing & Is Being Evaluated in Separate Report | Scaffolding |
ML20207J695 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant | |
ML20204C975 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station | |
ML20202J771 | 4 February 1999 | Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept | Boric Acid Shutdown Margin Fuel cladding |
ML20202G376 | 31 January 1999 | Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units | Boric Acid Shutdown Margin Stroke time Rod Drop Event Fuel cladding |
ML20207L281 | 31 January 1999 | Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 | |
ML20202J173 | 22 January 1999 | Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety | Weld Overlay VT-2 Liquid penetrant |
ML20199E675 | 14 January 1999 | Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station | |
ML20195B919 | 31 December 1998 | 1998 NPPD Annual Rept. with | |
ML20206P786 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With | |
ML20205H056 | 31 December 1998 | Northern States Power Co 1998 Annual Rept. with | |
ML20198J644 | 17 December 1998 | Rev 0 to PINGP COLR Unit 2-Cycle 19 | |
ML20196J964 | 7 December 1998 | Safety Evaluation Accepting Licensee Third 10-yr Interval Inservice Insp Plan Request for Relief RI-27,rev 1 | Incorporated by reference Scaffolding |
ML20206N273 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With | |
ML20198D247 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Cooper Nuclear Station.With |