Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217G74630 September 1999Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML20212K97830 September 1999Safety Evaluation Accepting USI A-46 Implementation ProgramSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
ML20217G44630 September 1999Monthly Operating Repts for Sept 1999 for Pingp.With
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212C50031 August 1999Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station
ML20216E71531 August 1999Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with
ML20211D64925 August 1999Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy
ML20211D39824 August 1999Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectivelyPower-Operated Valves
Backfit
ML20211C2534 August 1999Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
ML20210R03831 July 1999Monthly Operating Rept for July 1999 for Cooper Nuclear Station
ML20210Q48931 July 1999Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with
ML20211B59731 July 1999Cycle 20 Voltage-Based Repair Criteria 90-Day Rept
ML20210J29229 July 1999Special Rept:On 990406,OG TS & Associated Charcoal Absorbers Were Removed from Svc.Caused by Scheduled Maint on Hpci. Evaluation of Offsite Effluent Release Dose Effects Was Performed to Ensure Plant Remained in Compliance
ML20209H82815 July 1999Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear StationPower-Operated Valves
Backfit
ML20209J11315 July 1999Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing ActionsShutdown Margin
ML20211A99812 July 1999Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure
ML20209E10630 June 1999Monthly Operating Rept for June 1999 for Cns.With
ML20209F98130 June 1999Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20196F40823 June 1999Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI UnitsShutdown Margin
ML20196B38517 June 1999Summary Rept of Facility Changes,Test & Experiments,Per 10CFR50.59 for Period 970901-990331.Summary of Commitment Changes Made During Same Time Period Also EnclHot Short
Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Coatings
Temporary Modification
Emergency Lighting
Incorporated by reference
Condition Adverse to Quality
Missed surveillance
Abnormal operational transient
Corrosion bonding
Design basis earthquake
Foreign Material Exclusion
Scram Discharge Volume
Feedwater Controller Failure
Severe Accident Management Guideline
Rod Drop Event
Earthquake
Fuel cladding
Through Wall Leak
Offsite Circuit
Continuous fire watch
Fire Protection Program
Fire Watch
Scaffolding
Grace period
ML20195K28531 May 1999Monthly Operating Rept for May 1999 for Cooper Nuclear Station.With
ML20195G51831 May 1999Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not IncludedHydrostatic
ML20207B59326 May 1999SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMsHigh Radiation Area
Hydrostatic
VT-2
Liquid penetrant
ML20196L25013 May 1999Rev 0 to PINGP Unit 1 COLR Cycle 20
ML20206P04812 May 1999Safety Evaluation Concluding That NPP Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at CNS & Adequately Addressed Actions Requested in GL 96-05Stroke time
Past operability
ML20206J0814 May 1999Rev 14 to CNS QA Program for OperationSafe Shutdown
Nondestructive Examination
Temporary Modification
Foreign Material Exclusion
Backfit
ML20206P97530 April 1999Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station
ML20206L61930 April 1999Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with
ML20205Q08931 March 1999Monthly Operating Rept for Mar 1999 for Cooper Nuclear Station.With
ML20205N10831 March 1999Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with
ML20205Q51015 March 1999Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229
ML20204G89515 March 1999CNS Inservice Insp Summary Rept Fall 1998 Refueling Outage (RFO-18)Hydrostatic
Nondestructive Examination
VT-2
Finite Element Analysis
Liquid penetrant
ML20207M92312 March 1999Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results
ML20204B37011 March 1999SER Accepting Third 10-year Interval Inservice Insp Plan Requests for Relief for RI-17,Rev 1 and RI-25,Rev 0.Request for Relief RI-13,Rev 2 Involving Snubber Testing & Is Being Evaluated in Separate ReportScaffolding
ML20207J69528 February 1999Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant
ML20204C97528 February 1999Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station
ML20202J7714 February 1999Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual ReptBoric Acid
Shutdown Margin
Fuel cladding
ML20202G37631 January 1999Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI UnitsBoric Acid
Shutdown Margin
Stroke time
Rod Drop Event
Fuel cladding
ML20207L28131 January 1999Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2
ML20202J17322 January 1999Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & SafetyWeld Overlay
VT-2
Liquid penetrant
ML20199E67514 January 1999Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station
ML20195B91931 December 19981998 NPPD Annual Rept. with
ML20206P78631 December 1998Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With
ML20205H05631 December 1998Northern States Power Co 1998 Annual Rept. with
ML20198J64417 December 1998Rev 0 to PINGP COLR Unit 2-Cycle 19
ML20196J9647 December 1998Safety Evaluation Accepting Licensee Third 10-yr Interval Inservice Insp Plan Request for Relief RI-27,rev 1Incorporated by reference
Scaffolding
ML20206N27330 November 1998Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With
ML20198D24730 November 1998Monthly Operating Rept for Nov 1998 for Cooper Nuclear Station.With