ML20151Z901 | 3 August 1998 | Rev 2 to 5AWI 6.1.0, Design Change General | Finite Element Analysis Battery sizing |
ML20151Z918 | 3 August 1998 | Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification | |
ML20248M142 | 6 April 1998 | Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) | Hot Short Safe Shutdown Fitness for Duty High Radiation Area Fire Barrier Probabilistic Risk Assessment Coatings Temporary Modification Emergency Lighting Exemption Request Maintenance Rule Program Biofouling Fire Protection Program Fire Watch Scaffolding Backfit |
ML20151Z956 | 5 January 1998 | Rev 0 to 5AWI 6.1.7, Design Change Work Orders | |
ML20151Z944 | 20 October 1997 | Rev 0 to 5AWI 6.1.6, Design Review & Approval | Safe Shutdown Scaffolding |
ML20137W362 | 17 March 1997 | Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays | Fire Barrier |
ML20136H010 | 29 January 1997 | Rev 12 to Abnormal Procedure AB-3, Earthquakes | Safe Shutdown Design basis earthquake Earthquake |
ML20138G875 | 8 November 1996 | Rev 2 to TN-40 Cask Unloading Procedure | Grab sample Scaffolding |
ML20134L915 | 28 October 1996 | Rev 35 to Swi O-2, Shift Organization,Operation & Turnover | Safe Shutdown Earthquake |
ML20151Z929 | 15 October 1996 | Rev 0 to 5AWI 6.1.3, Design Change Package,Logs & Records | |
ML20151Z935 | 15 October 1996 | Rev 0 to 5AWI 6.1.4, Design Change Description/Safety Assessment | |
ML20151Z939 | 15 October 1996 | Rev 0 to 5AWI 6.1.5, Design Change Implementation Plans | |
ML20151Z907 | 15 October 1996 | Rev 0 to 5AWI 6.1.1, Design Inputs | Safe Shutdown Boric Acid Fire Barrier Coatings Emergency Lighting Battery sizing |
ML20151Z960 | 15 October 1996 | Rev 0 to 5AWI 6.1.9, Design Change Turnover for Operation | |
ML20151Z975 | 15 October 1996 | Rev 0 to 5AWI 6.1.10, Design Change Close-Out | Safe Shutdown Boric Acid High winds Fire Barrier Hydrostatic Probabilistic Risk Assessment Coatings Battery sizing |
ML20148P275 | 8 September 1996 | Rev 11 to Loss of All Safeguards AC Power | Emergency Lighting |
ML20141A414 | 8 May 1996 | Rev 14 to H4, Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20116H892 | 2 January 1996 | User'S Guide for Preslock,Gate Valve Pressure Locking Analysis Program Using the Commonwealth Edison Model | |
ML20117F945 | 16 October 1995 | Rev 13 to Odcm | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML20093J005 | 16 October 1995 | Rev 13 to H Procedure H4, Odcm | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML20086D618 | 6 July 1995 | Rev 1 to PINGP Unit 1 ISI Exam Plan Third Interval 931217- 031216 | Hydrostatic Dissimilar Metal Weld |
ML20077A799 | 31 October 1994 | Rev 0 to NSP Prairie Island Nuclear Generating Plant Unit 2 ISI Exam Plan Third Interval 941221-201220,2004 | |
ML20079B239 | 14 October 1994 | Transco Procedure Tiqap 9.20,For Installation of KM-1 Fire Barrier Systems for Electrical Raceway Systems | Fire Barrier |
ML20073D134 | 13 September 1994 | Rev 3 to H10.1, ASME Section XI Inservice Testing Implementing Program | Safe Shutdown Boric Acid Stroke time Hydrostatic Power Operated Valves |
ML20071Q643 | 30 December 1993 | Rev 0 to NSP Prairie Island Nuclear Generating Plant Unit 1 ISI Exam Plan Third Interval 931217-031216 | Boric Acid Hydrostatic Scaffolding |
ML20056G162 | 20 August 1993 | Rev 2 to Prairie Island Nuclear Generating Plant Units 1 & 2 IST Program Manual | Safe Shutdown Boric Acid Stroke time |
ML20096H441 | 11 May 1992 | Rev 3 to Prairie Island Nuclear Generating Plant ASME Code Section XI Inservice Insp & Testing Program Second 10-Yr Insp Interval,831216-931216 | Stroke time Power Operated Valves |
ML20082B929 | 1 June 1991 | Rev 1 to VVP9000520/1, Verification & Validation Plan for Class 1E Qualified Safeguard Load Sequencer | |
ML20056A339 | 31 July 1990 | Rev 2 to ASME Code Section XI Inservice Insp & Testing Program,Second 10-Yr Insp Interval | |
ML20126C071 | 19 July 1990 | Rev 0 to Operations Manual,Section H7.3, Integral Welded Attachment Evaluation Criteria for Prairie Island Nuclear Generating Plant | |
ML20012A323 | 5 October 1989 | Rev 11 to Odcm. | |
ML20246P131 | 27 April 1989 | Rev 10 to, Prairie Island Nuclear Generating Plant Offsite Dose Calculation Manual (Odcm) | Offsite Dose Calculation Manual |
ML20207L115 | 21 September 1988 | Criteria for Determining Justification for Continued Operation When Encountering Major Discrepancies in As-Built Safety-Related Piping | Design basis earthquake Earthquake |
ML20151C410 | 12 July 1988 | Rev 0 to Northern States Power Co,Section Ii:Exercise Objectives & Guidelines | |
ML20153B949 | 15 April 1988 | Rev 2 to D59, Process Control Program for Solidification/ Dewatering of Radwaste from Liquid Sys | Boric Acid Process Control Program |
ML20196E648 | 10 September 1987 | Rev 1 to Process Control Program Manual | Boric Acid Process Control Program |
ML20237L108 | 29 July 1987 | Rev 1 to Prairie Island Nuclear Generating Plant,Inservice Insp & Testing Program Manual | |
ML20236J835 | 13 July 1987 | Errata to Rev 1 to ASME Code Section XI Inservice Insp & Testing Program Manual,Correcting Administrative Errors Recently Found in 870812 Submittal | |
ML20238A866 | 29 June 1987 | Rev 9 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20209B736 | 20 January 1987 | Rev 1 to, Inservice Insp & Testing Program Manual | Boric Acid Stroke time Hydrostatic VT-2 Power Operated Valves Dissimilar Metal Weld |
ML20212A026 | 13 January 1987 | Rev 8 to Prairie Island Nuclear Generating Plant Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20207Q466 | 1 January 1987 | Rev 20 to Corporate Nuclear Emergency Plan Implementing Procedure, Table of Contents Record of Rev | |
ML20214M011 | 14 February 1986 | Rev 6 to Prairie Island Nuclear Generating Plant Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20206E419 | 22 August 1985 | Rev 0 to Corporate Administrative Work Instruction N1AWI 6.1.5, Requisition Contents | Hydrostatic Nondestructive Examination |
ML20087D075 | 14 November 1984 | Rev 4 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20107B395 | 8 October 1984 | Public Version of Rev 29 to Emergency Plan Inplementing Procedures,Including F3-1, Onsite Emergency Organization, F3-2, Classification of Emergencies, & F3-3, Responsibilities During Notification of Unusual Events | |
ML20097A338 | 24 August 1984 | Rev 5 to Prairie Island Nuclear Generating Plant Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20095L233 | 29 February 1984 | Revised Radiation Environ Monitoring Plan | |
ML20080C871 | 3 February 1984 | Rev 0 to Emergency Plan Evaluation Exercise 840313,Section Ii:Exercise Objectives & Guidelines | |
ML20087M950 | 19 January 1984 | Public Version of Rev 5 to Emergency Plan Implementing Procedure F3-13, Offsite Dose Calculation, Temporary Memo 83-48,Rev 23 to Table of Contents & Jm Felton 840322 Release Memo | Grab sample Met Tower |