. - . _ .

NORTHERN STATES POWER COMPANY 414 NICOLLET MALL  !

MINNEAPOLIS, MINNESOTA 55401 PRAIRIE ISLAND NUCLEAR GENERATING PLANT i UNIT 1 .

I 1717 WAKONADE DRIVE E j WELCH, MINNESOTA 55089 1 1

INSERVICE INSPECTION EXAMINATION PLAN REVISION 1 l THIRD INTERVAL .

DECEMBER 17,1993 THROUGH DECEMBER 16,2003  !

t L

  • t I

Prepared By: '

Monica Vi Reviewed By: ,

Chuck Kinney Approved By: /I/7dm 12 h/ /d I &

/

Jeff Ricker t/

b 9507100273 950706 PDR ADOCK 05000282 commercial service Date12/28/73 Q PDR ISI- Third Ten Year, Rev i 7/6/95

NORTHERN STATES POWER INSERVICE INSPECTION l PRAIRIE ISLAND EXAMINATION PLAN  :

UNIT 1 - 3RD INTERVAL l

RECORD OF REVISIONS l Eaga Her

-l ~

~1 l 1-1 0  !

2-1 and 2-2 0 i 3-1 and 3-2 1 -i 4-1 through 4 1.

5-1 1 l 6-1 through 6-6 1  ;

7-1 0 7-2 1 I

Table (1 thru 56) i 1

O t

I i .

a 1

O i Revision 1 7/6/95

.i-

{

p 4 NORTHERN STATES POWER INSERVICE INSPECTION  !

.n PRAIRIE ISLAND EXAMINATION PLAN -  ;

. UNIT 1: 3RD INTERVAL i

SOURCE DOCUMENTS i l

10CFR50.55a (56FR3794)-

1974 Summer 75 B&PV Code Section XI-  !

8 1989 B&PV Code Section XI l

NRC Bulletin 82-02 Degradation of threaded fasteners in the reactor coolant - 1 pressure boundary of PWR plants -  ;

NRC Bulletin 88-11 Pressurizer surge line thermal stratification j n

NSP Letter dated February 10,1993, entitled " Supplemental Reply to a Notice of .

Deviaiton NRC Inspection Report Nos. 282/92008 and 306/92008 Final Safety Analysis Report Commitment for Inservice Examination of High  !

Energy Line Piping".

Regulatory Guide 1.150, Rev.1 O Regulatory Guide 1.58, Rev.1 j Regulatory Guide 1.147, Rev.11 dated October 1994 Code Case N-307-1 Revised Ultrasonic Examination Volume foe -J Class l Bolting, Table IWB-2500-1,  !

Examination Category B-G-1, When the Examinations are Conducted from the Center Drilled Hole Code Case N-356 Certification Period for Level 11 NDE Personnel,Section XI, Division 1,2 and 3 Code Case N-401-1 Eddy Current Examination,Section XI, Division 1

.1 Code Case N-402-1 Eddy Current Calibration Standards,Section XI, Division 1 Code Case N-481 Alternate Examination Requirements for Cast Austenitic Pump Casings  !

l Code Case N-498 Alternate Rules for 10-Year Hydrostatic Pressure Testing for Class 1 and 2 Systems 3-1 Revision 1 7/6/95 i

>4 w l e ,

l NORTHERN STATES POWER ~ INSERVICE INSPECTION j PRAIRIE ISLAND EXAMINATION PLAN N UNIT 1 3RD INTERVAL _;

7 L 1 Use of ASME Section XI Code Cases not included in Regulatory Guide 1.147, Revision 11.

i Code Case N-416-1 ' Alternate Rules for Hydrostatic Testing of j Repair or Replacement of Class 2 Piping, )

Section XI, Division 1 (Approved for Use in by NRC SER dated June 24,1995) t Code Case N-491 Alternative Rules for Examination of Class 1, 2,3, and MC Component Supports of Light-Water Cooled Power Plants (Rev 1' Approved '

by ASME on 4/30/93; Original included in ,

Regulatory Guide 1.147, Revision 11) .;

O J

l

..l O

3-2 Revision 1 7/6/95 I

.v NORTHERN STATES POWER lNSERVICE INSPECTION

' PRAIRIE ISLAND EXAMINATION PLAN UNIT 1 - 3RD INTERVAL REQUESTS FOR RELIEF -  !

Relief Reauest No. Descriotion Egy, _ )

1-  :

2 Cooling water 0 -l l

5 Regenerative Heat Exchanger 2 l 1

6 Use of Existing Calibration Blocks 0

)

I 1

i

)

l i

l O )

1

-1 1

l l

l 4-1 Revision 1 7/6/95 {

i

.- - . = . . .- . . - . . . ~ . . . - _ . , ..

I NORTHERN STATES POWER ~ INSERVICE INSPECTION PRAIRIE ISLAND EXAMINATION PLAN p

,&)

UNIT 1- _3RD INTERVAL _

ISI Relief Request No.' 2 (Rev. 0) i Cooling Water Hydrostatic Testing l SYSTEM: Cooling Water Class: 3 Category:: D-C . Item: D 3.10 j Examination Reauirements.

-l

' The piping will not be hydrostatically tests at each inspection interval by _

IWD-2500-1.

.f Basis for Relief:

The cooling water system is designed such that Unit 1 and Unit 2.-

safeguards equipment is supplied from both sides of the cooling water  !

system header. Consequently, the entire supply and return header must be '!

in operation at all times to meet operating license requirements. i Alternate Examination:

~

The cooling water system will be visually examined every one-third interval  !

for conditions adverse to system _ operation. Additionally, the system is in constant operation and any leaks would be immediately known.' Portions that are isolatable from the main headers will be pressure tested in accordance with the applicable requirements.

Reference:

Relief Request No. 28 - Second Ten Year Interval dated December 22,1983; NRC SER dated December 28; 1984.

Acoroval Status:

Not yet approved. . Submitted with Examination Plan, Rev 0.

4-2 Revision 1 7/6/95

_,_ I

NORTHERN STATES POWER INSERVICE INSPECTION PRAIRIE ISLAND EXAMINATION PLAN 7~  ; UNIT 1 3RD INTERVAL Li ISI Relief Request No. 5 (Rev. 2) (Page 1 of 2)

Regenerative Heat Exchanger SYSTEM: Reactor Coolant Class: 1 Category: B-B ltem: B 2.51 B-D B 3.160 Examination Reauirements:

a) The acceptance standard used for the volumetric examinata circumferential head weld will not be IWB-3510.

b) A volumetric exarnination of the nozzle inner radius will not be performed.

,m

( ) Basis for Relief:

a) The acceptance standard is for ferritic vessels; the regenerative heat exchanger is austenitic.

The regenerative heat exchanger is more pipe like than vessel like. The head is a 6 inch pipe cap; made of cast stainless; 0.375 inches thick. The integral tubesheet is a 6 inch forging; stainless; 0.500 inches thick at the weld, b) The integral tubesheet component includes the 2 inch nozzles. The '

forged nozzles ends are socket welded to the inlet and outlet pipe. This arrangement results in complex geometry and limited accessible scan areas. Therefore, a volumetric examination would provide no meaningful information. Since the heat exchangers are in a locked radiation area, ALARA considerations would recommend not performing an examination which provides no significant benefit.

Alternate Examination:

a) The acceptance standard used for the limited volumetric examination of the regenerative heat exchanger circumferential head weld will be IWB-

[)

v 3514.1, IWB-3514.3 and Table IWB-3514-2 for austenitic piping.

4-3 Revision 1 7/6/95

l NORTHERN STATES POWEsR INSERVICE INSPECTION PRAIRIE ISLAND EXAMINATION PLAN r~N UNIT 1 3RD INTERVAL

. '(_f.

I ISI Relief Request No. 5 (Rev. 2) (Page 2 of 2) l Regenerative Heat Exchanger Ste II 'J *

-t /'k V_. <

==!

'l/ /

j k 'i

g. -_

n wnwll'/.Ths ys' sw *

i. \ \

h REGENEIIATIVE llEAT j] EXCilANGER

( _ ,_

s.w' INTEGRAL TUBESIIEET AND CAP ,

b) When insulatation is re moved for the regeneratiie heat hiichanger circumferential head weld examination, the nozzle area will be visually inspected

Reference:

Relief Request Nos. 45 and 66 - Second Ten Year Interval  :

dated December 22,1983; NRC SER dated December 28, 1984.

Time Period Relief is Reauested For Relief is requested for the Third Ten Year interval.

Acoroval Status:

Not yet approved. Submitted Rev 2 July 6,1995. ,

A U

4-4 Revision 1 -

7/6/95 .

i

r i

" ~ NORTHERN STATES POWER INSERVICE INSPECTION f PRAIRIE ISLAND. EXAMINATION PLAN '

~ UNIT 1 - 3RD INTERVAL w

" ISI Relief Request No. 6 (Rev. 0)(Page 1 of 3)

Use of Existing Calibration Blocks b

SYSTEM: Variousi Class: 1 and 2 Category: B-B ltem: B 2.11, B 2.12, B 2.40, B 2.51.- '

E B-F- . B 5.10, B 5.40, B 5.70, B 5.130 -'

B-J - B 9.11, B 9.12, B 9.31 -

L C-A. C 1.10, C 1.20 -

C-B ' C 2.32 C-F-1 C 5.11, C 5.12, C 5.21, C' 5.22 C-F-2: C 5.51, C 5.52 l

' Examination Reauirements:

IWA-2232 states that ultrasonic examination shall be conducted in accordance with Appendix 1.

Appendix 1,1-2100 states that ultrasonic examination of vessel welds greater than 2 inches thick shall be conducted in accordance with Acticle 4 of Section V as supplemented by Appendix 1.

Section V, Article 4, T-441.1.2 outlines the material specification requirements for calibration blocks.: T-441.1.2.1 requires. calibration blocks to be fabricated from one of the following: (a) nozzle drop out from the component; (b) a component prolongation; (c) material from the same material specification, product form, and heat treatment as one of the materials being joined.

Appendix 1,1-2200' states that ultrasonic examination of vessel welds less than or equal to 2 inches thick and all piping welds shall be conducted in accordance with Appendix 111, as supplemented by Appendix 1.

Appendix lil, lll-3411 outlines the material specification requirements for calibration blocks. Appendix lil, Ill-3411 requires (a) the calibration blocks for similiar metal welds shall be fabricated from one of the same materials specified for the piping being joined by the weld; (b) calibration blocks for .

O 4-5 Revision 1 7/6/95

. NORTHERN b . ATES POWS .I ' INSERVICE INSPECTION -

PRAIRIE ISLAND - EXAMINATION PLAN UNIT 1., 3RD INTERVAL -

h ISl' Relief Request No. 6_(Rev. 0)(Pag [2 of 3)

Use of Existing Calibration Blocks dissimiliar metal welds to be fabricated from the material specified for the side of the weld from which the examination will be conducted. If the examination will be conducted from both sides, calibration reflectors shall be provided in both materials; (c) Where the examination is to be performed from only one side of the joint, the calibration block material shall be of the same specification as the material on _that side of the joint; (d) If material of the same specification is not available, material of similar chemical analysis, tensile properties, and metallurgical structure may be used.

Examination Reauirement Not Met Several of the calibration blocks currently being used lack the documentation necessary to demenstrate compliance with the material -

specification requirements of Article?. of Section V and Appendix Ill.

Several of the calibration blocks currently being used on pipe to fitting or fitting to fitting joints where examination is performed from both sides of the joint are fabricated to pipe material specifications.

Basis for Relief:

Documentation requirements existing at the time of fabrication did not I require traceability to the material's chemical or physical certifications. l Existing calibration blocks certification is _ verified through appropriate P- ,

number grouping. The P-number grouping provides adequate assurance i that the blocks will establish the proper ultrasonic calibration and sensitivity. I l

i a

O ,

4-6 Revision 1 7/6/95

NORTHERN STATES POWER INSERVICE INSPECTION PRAIRIE ISLAND EXAMINATION PLAN UNIT 1 3RD INTERVAL

(~).

L)

ISI Relief Request No. 6 (Rev. 0)(Page 3 of 3)

Use of Existing Calibration Blocks

' Prooosed Alternative Existing calibration blocks will be used as is.

Any calibration blocks obtained in the future will be obtained with documentation to demonstrate compliance the material specification requirements of ASME Code Section V Article 4 or Section XI, Appendix ill, as applicable.

Alstification for Granting Relief it would be impractical to fabricate a new set of calibration blocks in order to O

V satisfy the documentation requirements of the current Code. Existing records, indicate the appropriate P-number grouping, thereby providing adequate assurance that the blocks will establish the proper ultrasonic calibration and sensitivity.

Any new calibration block will be obtained with the documentation necessary to demonstrate compliance with the material specification  ;

requirements. l Time Period Relief is Reauested For -

Relief is requested for the Third Ten Year interval.

Approval Status Not yet approved. Submitted Rev 0 April 17,1995.

l O

4-7 Revision 1 7/6/95

NORTHERN STATES POWER INSERVICE INSPECTION PRAIRIE ISLAND EXAMINATION PLAN o -

UNIT 1 3RD INTERVAL

.O-ASME Code Section XI ISI Boundary Drawings Drawina Title Revision

1. Reactor Coolant 0
2. Residual Heat Removal 0'
3. Chemical and Volume Control 0
4. Chemical and Volume Control 0
5. Chemical and Volume Control 0
6. Safety injection i
7. Safety injection 1
8. Waste Disposal 0
9. Main Steam 0
10. Feedwater 0

] 11. Containment Spray

12. Steam Generator Blowdown Unit #1 0

0

13. Post Loca Hydrogen Control 0

- - - - - Indicates NDE Required Indicates No NDE Required i

Code Class 1 i; Code Class 2 l i; Code Class 3 Code Class Non-Safety o 5-1 Revision 1 7/6/95

{ q

./

,-. )Q blN

- 04 g

)

l

  1. 11 Accumulator Mmh,-,

To LoopW ~ W ~

CoM Le9 n- _ _ , , _wro;o g _ _ _,_ _ _ g g _,, ,_ _ W _ _ d _ _ _ , CoH Leg 3, ,gg, - sus-s ws2o7s 5 I ak167 e From Reactor Vessel y__--

g

- .- -. y uv-no-.- - - - - -iji- --e- -tme pes ss stSe - - -l- - .o-CAS- - - -+ Injection Line ws2074 l

l 1

d slw --04 I

l l

l '

l  !

1 l #12 Accumulator l

g [ \

G i Alb j l (g .l i

i n. actor Cooi.nt ,

Drain Tank

  • "q'"

c 1

.n,2 x

v l l l l

l 8 k wtwa %-8 l i.

~2

+w,_-_--e o,

I , I l

li Co $e'g m _ldlba _ _ _ _ _ q,- - . _

- _ _ -,., _ ;I I g not j ,swS4_ w sacss sus.7 l

1, I d.4 b i 7,- - g . L - _ _. _ _ _- - _ - -___--n3 .

[ , w32067 sw&9 l l L - _ l:

i - _ - _ _ _ - .4 _ ., W 32066 j g m.., 1 - ,m2 -t v- -ws*, --c = CL" , l To Reactor enT e ' -

Vessel I Ev  ? I y =l~ :,

4. - - .4 m.uo.4 R V

_ _ MV 32075 W-32077

+e e = =M M -

Containment Sump 'B' **"D NLC "

1 g, -

uv:n'o,.

f s

wsw.

NSP - PRAIRIE ISLAND UNIT 1 - ISI

6. Safety injection DWN:A(6 CHKD:h\ ~ APPD: N REF. DWG: NF-39813 REV: 1

4 f '. ~

v J .

Recue to BAT Froes BATS T ' elm 1

, _tcves) 'y f 1 m

,I{,+-

{L sktSto w' dest sioiso T=*

To Unit 2 M I

ss.2 g ww2cas

_ vi-32'cs2 ,

% s Si-tS13 skt-t 4 T? Cold L , , _ , ,,,,____,g, _ __ %

sitt assi r ,_ _ _ _, ,y, If {

I ''*

sList J. w32ts2 -g -

s,, _

1 ):. miecuan Pump Et&3 MM ^

[ .T u sk$s-s To Reactor Vessel

...d l wm-

=

inw on. -- - + - - - - + ' - - gMs6 52- r --- p g,_ "

sr.

I m321s3 l .- si2 ss=vy w32cs4

.l- T hjusanPump jg jl T

s>1616 If skisz ,

I I . w3220s l%g]: w32207 - vvt:20ss

! I sL153 h h #154 t

. ,,o.1- ~ > ._wszzos .

.t3 - _4_2 1. _

w322o2 -)

ib- J L c

. To conurent Spray Pwmps k..

i From Residual Heat Exchangers .

- 7. Safety injection NSP - PRAIRIE ISLAND UNIT 1 .ISI <

Note: All Piping Shown D "

DWN:Ag CHKD:M APPD:

REF. DWG: NF-39814 REV: 1

I g

NORTHERN STATES POWER INSERVICE INSPECTION

c. , iPRAIRIE ISLAND EXAMINATION PLAN 1 p.- UNIT 1 - 3RD INTERVAL-- l G j l

> ISI ISOMETRIC DRAWINGS 1 1

Drawing 1 Number- Rev Title

, lSI-1 A. 3 Loop.'B' Charging Line 2" l F ISI-1B 2 Loop 'B' Charging Line 2" l ISI-1C 2 Loop 'B' Charging Line 2" ISI-1D '2 Loop 'B' Charging Line 2" ISI-1E 2 Loop 'B' Charging Line 2"  ;

ISI-1F 2 Loop 'B' Charging Line 2-

1S1-2 2 12" Accumulator Discharge '

ISI-3A 3 Loop 'A' RHR Takeoff 8" ISI-3B - 2 Loop 'A' RHR Takeoff 8" i ISl-3C 2 Loop 'A' RHR Takeoff 8" ISI-5A 4 Spray to Pressurizer -!

181-5B. 3 Spray to Pressurizer O ISI-5C - 2 Spray to Pressurizer ISI-5D 3 Spray to Pressurizer ISI-6 2 Loop 'A' 3" RTD Return  :

ISI-7 2 2" RTD Takeoff Cold Leg' Loop 'A' ISI-8 2 2" RTD Takeoff Loop 'A' Hot Leg 1S1-9 3 SIS High Head Loop 'A' Cold Leg ISI-10 3 2" Drain (on Crossover) Loop 'A' ISI-11 A 3 2" & 11/2" Seal Injection Loop 'A' l

ISI-11B 2 ~2" & 11/2" Seal Injection Loop 'A' ISI-11C 2 2" & 11/2" Seal injection Loop 'A' l

, ISI-11D 3 2" & 11/2" Seal Injection Loop 'A'  !

ISI-12A 0 Reactor Coolant Loop 'A' l ISI-12B 0 Reactor Coolant Loop 'A'

~ lSI-12C 0 Reactor Coolant Loop 'A' ISI-13A 0 Reactor Coolant Loop 'B' ISI-13B 0 Reactor Coolant Loop 'B' ISI-13C 0 Reactor Coolant Loop 'B' ISI-14 2 Reactor Coolant Pump '11' pJs ISI-17 2 12" Accumulator Discharge 6-1 Revision 1 7/6/95

~ ^

J NORTHERN STATES POWER- INSERVICE INSPECTION PRAIRIE ISLAND EXAMINATION PLAN

-w - UNIT 1' 3RD INTERVAL

" ISI ISOMETRIC DRAWINGS Drawing Number - Rev Title ,

181-18 2 10" RHR Return' Loop 'B'

-ISI-19A 2 8" RHR Takeoff Loop 'B'

  • ISI-19B 2 8" RHR Takeoff Loop 'B' j

~1S1-21 2 3" RTD Return Loop 'B' I ISI-22 2 2" RTD Takeoff Cold Leg Loop 'B' ISI-23 2 2" RTD Takeoff Hot Leg LoopB'.

ISI-24 2 SIS High Head Loop 'B' ISI-25 3 2'.' Crossover Drain Loop 'B' )

- ISI-26 2. 2" CVCS Letdown Loop 'B' )

ISI-27A 3 Seal Injection Loop 'B' ~

ISI-27B 3 Seal Injection Loop 'B' ISI-27C 3 Seal Injection Loop 'B'

.O ISI-27D 0 Seal injection Loop 'B' 1S1-28 3 10" Pressurizer Surge ISI-29A 0 6" Press Safety Loop 'A' ISI-29B 0 6" Press Safety Loop 'B' ISI-30A 0 Reactor Vessel Safety injection & j Reactor Coolant Loop 'A' )

181-30B 0 Reactor Vessel Safety injection'& 1 Reactor Coolant Loop 'B' j ISI-31 2 3". Pressurizer Relief i ISI-32A 0 2" Auxiliary. Spray 181-32B 0 2" Auxiliary Spray ISI-33A -- 0 2" Low Head RV Injection Loop 'A' ,

- ISI-33B 0 2" Low Head RV injection Loop 'B'  !

ISI 2 Reactor Coolant Pump '12'  !

ISI-37 2 Reactor Vessel Studs, Nuts & Washers 1S1-38 2 Reactor Vessel Conoseal Bolting

3. Pressurizer 1S1-41 1S1-42 2 Pressurizer Nozzles O- ISI-43A 0 Steam Generator 11 4

6 Revision 1 7/6/95

i I

~

NORTHERN STATES POWERi INSERVICE INSPECTION '

PRAIRIE ISLAND - EXAMINATION PLAN UNIT 1: 3RD INTERVAL l

,0,

-ISI ISOMETRIC DRAWINGS Drawing l Number- Rev Title ,

ISI-43B 0 Steam Generator 12 ~

ISI-43C - 0 Steam Generator 11 '

ISI-43D ~ 0 Steam Generator 12.

ISI-44 2 Regenerative Heat Exchanger ISI-46 2 RCS Draindown Line 1S1-47 2 PLO Cap _B j ISI-48 2 Reactor Vessel Shell Welds Reactor Vessel Closure Head Weld 1 ISI-49 2 ISI-50 4 Reactor Vessel Nozzles ISI-51A 2 Main Steam Loop 'A' 4 ISI-51P 2 Main Steam Loop 'A' ,

'S'-5 o O - ISI-52 0

" '" St** * '

Feedwater Loop 'A' 9 '^'

ISI-53A 0 RHR Pumps' Suction ISI-53B 0 RHR Pumps' Suction ISI-53C 0 RHR Pump 'A' Suction ISI-53D 0 RHR Pump 'B' Suction ,

ISI-55A 0 RHR Pump 'A' Discharge >

1S1-55B 0 RHR Pump 'A' Discharge ISI-55C 0 RHR Pump 'B' Discharge ISI-55D 0 RHR Pump 'B' Discharge .  ;

ISI-68A 2 Main Steam Loop 'B'  ;

ISI-68B 2 Main Steam Loop 'B' ISI-68C 0 Main Steam Loop 'B' .)

ISI-69 0 Feedwater Loop 'B' ,

ISI-83A 0 RHR Pump 'A' Discharge & Safety injection i Pump 'A' Suction .

i ISI-83B 0 RHR Pump 'B' Discharge & Safety injection -  :

Pump 'B' Suction W

D ISI-89A ISI-89B 0

0 RHR Pump 'A' Discharge RHR Pump 'B' Discharge l

6-3 Revision 1 - i 7/6/95

_1' j

- NORTHERN STATES POWER INSERVICE INSPECTION c PRAIRIE ISLAND. EXAMINATION PLAN

. UNIT 1. 3RD INTERVAL

^

ISI ISOMETRIC DRAWINGS Drawing.

Number Rev- Title ISI-91 A L .0- Alternate Containment Spray 11' Suction 1S1-91B 0 Alternate Containment Spray.12 Suction ISI-93A- 0 #11 RHR Heat Exchanger ISI-93B 0 #12 RHR Heat Exchanger ISI-96 0 Containment Spray Pump Discharge ISI-97A 0 SI 12 Discharge 1S1-978 ~ 0 SI 12 Discharge-ISI-97C 0 SI 12 Discharge

. ISI-97D 0. SI 12 Discharge lSI-98A 0 SI 11. Discharge ISI-988 0 _

SI 11 Discharge O ISI-98C ISI-99A 0

0 SI SI 12 Discharge Discharge ISI-99B 0 SI 12 Discharge

. ISI-100A 0 Si 11 Discharge ISI-100B 0 -SI 11 Discharge 1S1-101' 0 SI Test Return 181-102 0 SI Test Return -

1S1-103 O SI Test Return N D-1-3-1 2 Cooling Water ND-1-3 2 Cooling Water N D-1-3-3 2 Cooling Water -

ND-1-3-4 2 Cooling Water 1 ND-1-3 2 Cooling Water N D-1-3-6 2 Cooling Water'-

ND-1-3-7 2 . Cooling Water -

ND-1-3-8 -2 ' Cooling Water

. N D-1 9 2 Cooling Water ND-1-3-10 2 . Cooling Water ,

ND-1-3-11 2 Cooling Water ND-1-3-12 2 Cooling Water 6-4 Revision 1 7/6/95

. gn - - -

-f

~

NORTHERN STAl ES POWER i INSERVICE INSPECTION

, PRAIRIE ISLAND EXAMINATION PLAN 3RD INTERVAL

_ U NIT- 1 --

ilSI ISO'E.TRIC DRAWINGS ,

. Drawilig .

" Numb er Rev Title e

~

O ND-1-3-13 2 Cooling Water ND-1-3 2 Cooling Water ND-1-3-15 2 Cooling Water n ND-1-3 2 Cooling Water ND-1-3-17 2: . Cooling Water ND-1-3-18 2 Cooling Water ND-1-3-20 2 Cooling Water ND-1-3-21 2 Cooling Water

' N D-1-3-23 2 _. Cooling Water ND-1-3-24 2 Cooling Water -

ND-1-3-25 2 ~ Cooling Water Q ND-1-3 ND-1-3-46 2 2 Cooling Water

_ Cooling Water ND-1-3-47 2 Cooling Water N D-1-3-4E - 2 Cooling Water N D-1-3-49 2- Cooling Water ND-1-3-50 2 Cooling Water ND-1-3-52 2 Cooling Water ND-1-3-64 2 Cooling Water ND-1-3-65 2 Cooling Water ND-1-3-68 2 Cooling Water .

. ND-1-3-90 2 Cooling Water ND-1-3-91 2 Cooling Water -

N D-1-3-92 2 Cooling Water N D-1-3-93 2 Cooling Water N D-1-3-94 -2 Cooling Water ND-1-3-95 2 Cooling Water ^

ND-1-3-166 2 Caustic Add ND-1-3-178 2 Misc Relief Valve Vents ND-1-3-216 2 Component Cooling ND-1-3-217 2- Component Cooling 6-5 Revision 1 7/6/95

1 NORTHERN STATES POWER INSERVICE INSPECTION .

PRAIRIE ISLAND EXAMINATION PLAN l

,7- . UNIT 1 3RD INTERVAL  !

U ISI ISOMETRIC DRAWINGS Drawing Number Rev Title .

ND-1-3-218 2 Component Cooling l ND-1-3-219 ~2 Component Cooling ,

ND-1-3-220 2. Component Cooling ND-1-3-221 2 Component Cooling  ;

L ND-1-3-222 2 Component Cooling i ND-1-3-223 2 Component Cooling i ND-1-3-224 2 Component Cooling ND-1-3-225 .2 Component Cooling ND-1-3-227 2 Component Cooling ND-1-3-228 2 Component Cooling-ND-1-3-244 12 Cooling Water ND-1-3-248 1 Aux Feedwater ND-1-3-249 1 Aux Feedwater.

ND-1-3-250 1 ' Aux Feedwater ND-1-3-251 '1 Aux Feedwater ND-1-3-252 1 Aux Feedwater ND-1-3-253 ' 1 Aux Feedwater ND-1-3-254 -2 Cooling Water ND-1-3-258 2 Cooling Water- )

ND-1-3-265 1 Aux Feedwater i

l O

6-6 Revision 1 7/6/95

- e w "

-Tm+v v - g--- , s+ w

. f

' ;l IS e I

a r

a O

. h O c  :

s V O / N R

E O.

N D i P D P 2 E

R N G N

A D

L E

7 1

3-1 T

I N

A 1

- n io H W U ht c

= = 6 D ) e 0 N  :

1 A D i D A H S L HKyin 51 7 t

s X t

- 9 E b e I

83 I

(

' i f

I a S- I S

G R I S 3 I W A 5  :

R  : :

M O O D

F P

- ME P N TS N N E G E S WY N W R N D S U D 8

9" 9%

I-1 S1 I '-

n9 1

t

o. 7 O C nl o E 'o 5

e' g

r a

2- h

  1. H c h R s

h-I S i 5

D (w.

8( h2_

~ s s

2 1

(wy d)6 8 4

w-n o -

i

[(1 h n t

c

" m */

' oB t 7 n9 - j e

n (w%' I o1 C13 i y .

3 j . -

t 5-

  • f e

w .

nD-0

o. 7 2' a w ry~D/.7.j S

4 0

5 t9 n2 CISlE oI 7 S -

S Q

(w( [w6 3s (w 9

[W ~

O l l , ,

4 . . .. . -

.. y ,.,g

  • im a

Cont.on ISI-97A i El. 722*-0" s

- -e \,me,

)y

- El. 721'-0"N m/w'N , ,

e A

El. 718'-6' ,

,/w M 1842 i

El. 717*-9" W A/

/mi\ W "

"O SlH-44/1 w

- W.10

/ .

ist

.f wu Q = HANGER NO-w i

-w A / .

O = WELD NO. .

i 4 t Cont on ISI-97C

-}

. REF. DWG: XH-106-509 ISI N NSP - PRAIRIE ISLAND UNIT 1 DWN: kGT.- CHKD: APPD:N .-

. Safety injection 112 Discharge ' SYSTEM: Safety Iniection 12 Discharae UNE NO: 2-SI-22A DWG NO: ISI-97B RLw: 0  !

_ _ ___ _ _ _ _ . _ . u __. _. . _ . . - . ____.m. _ _ _ . . _ _ _ . _ . _ _ _ . _ . . . _ _ . _ _ _ ___.__._.____.__-__m____-.__.__m-~__v_____.m._-.mcm-.___.- . . -<>%. . ._= ..w. m._.U.w. ..%_ .-wr.-w.. ..rw_,....rm - ww .t.w--+,

I.

4

j 4

N Cont on 101-97B

/ ~\ \

\\RS1H-163

/ , ,7/ me \ x x e xes+ w

/ m, x X *'"-' y ' _ e ges, ,y w e~' Te we , , , ,

(**>

El. 71T-9" D2 , M e w w ~

g "%w ,

., x ys'~y

/'e'\.sseemse

\ /.

,% 2 @ W O . wad No.

e m /"4\ f ,x M. fW $ *'"~' f WMM No C "'

siH-te7/

[mex RSlH-38

, ne)

REF. DWG: XH-106-493 XH-106-511 Cont. on ISI-33A INSP - PRAIRIE ISLAND UN!T 1 ISI DWN:kqT CHKD:'M/APPD Safety injection 12 Discharge SYSTEM: Safety Iniection 12 Discharae ,

LINE NO: 2-SI-22A -

DWG NO: ISI-97C REV: 0

--- _ _ _ ---__ _ - ._ _ _ , . . _ - ~ _ . - _ . . . . ._ - - _ . . . _ _ - - - - - _ _. _. ..._

_ 'd

, [7) u a Cont on ISI-97A Af lY-El.727 0" f<

[

e** / 8>\ W

.stH-17 EL 71T-9%" H-1 /g e

% ysi"-m/ p w' Y2s/ w M

/

H4 E 711*-9%"

S!-15-9 Cont. on ISI-33B W~Q h"'"f *-'

D w.7 N

\g D M4

\ w.3 W W-5 ISI

\ = HANGER NO.

f wtw W-13 N El. 76* B" v = WELD NO-No Cont (%"line) @

/-\

\RS!H-417/ / REF. DWG: XH-106-4164 XH-106-4165 NSP - PRAIRIE ISLAND UNIT 1 ISI DWN:Q4 CHKD:% [ APPD-Safety injection 12 Discharge SYSTEM: Safety Iniection 12 Discharae LINE NO: 2-SI-22B DWG NO: ISI-97D REV: 0

.- ,- ,- , i, ,,,c---v,.-- -

4. _ , . v-me- --

-.w, - , , , , -.w-v#, e e.v . - -v,,* ..r-

, .r-,- .. v,- r ,e-<+,4 . -a -,--____~--.__m.-_

_ _ - _ u-- _______-u__

____,w

.,,- .je ~

(,/ d( - (f pt.A Cont. on 1S1-1000 37,*-10 9/16' "

pB h

D W-13 e3  :

M82W I f D H-6 e

El. 711'-6 aa SIRH4/ Mgg \p /

WN m W-' d M

El. 709'-7%* M g

M M M

@~

M

%j M a El. 733'-9" Cont. on 1S1-988 D -

H-7 as El. 731':6-A SIRH-15 I El. 707*-7%"

SIRH-t

/"-1V\/X SIRH-18 g V w-28 [ ist \ '= HANGER NO.

HG o j

H-2\ \  ! = WELD NO.

\/ D M M[ El. 707'-7%" REF. DWG: XH-106-317 El. 718'-9 I NSP - PRAIRIE ISLAND UNIT 1 ISI Cont. at pt. B DWN:MTS CHKD: %t/ APPD:

V Safety inj,ect, ion 11 D,ischarge SYSTEM: Safety Inrection 11 Discharae cont. at pt. A UNE NO: 3-SI-15C DWG NO: ISI-98A REV: 0

_ __m _-__.um_-___..m_-_.__.___.m.__________a--n.2_ _.____A__ - - _4.2 -m ,%. , . . - , , . , . . .,,r,7., ,ag,..pw%gi,f%..,,, ,, _ _ _. ,

l i' .l i I

S e I

o r

, a 0

. h O c  :

v N

s f$, .  %

R E

O N

D i P D P

E R

N 1

G D 6 1 A 1 N L 5 T A

H E

W 1

1 I

N U

Yo n

} i D ht e

= 6 c 0

N  : i B

A D n 1

i TJ i

s H

X L

S H y K I t

1 2

8 8

9 is _

I C ef I E

a S- S t

I r%

I

[ G R fS2 I I W A  : :  :

R M O O D

P g: E N N F

E P N TS E G R S WY N W N D S L D I

A 8

9 -

I S

_ I n

Dt ,

C o.

n o

C

_ 8

)3r~ A 9-

, 1

'J 2 /

I I

S 6- e g

n '1 0 r

.33jr1 o. 7 a .

2 2 -

/t b)3C n

o b 3 2

l E h c

  • .(w s 3)*

4-k i eY [(1 3j y i D

1

$' 2 (w N N y 3 y\

2 9

9 1

1 D5- 5

/ /,

H 1

H n

6 l o

_ (w(2n5 4

3 Q;D)5k*V 9

5 4 A,j e

3 /

S i

t c w 2 8- 8 e l V 4 g(2 R

j (w(1" S(2 i n

~

h y N*k m

t .

e t

\

'mi

)

v f a

S m(

k- S 4

/"

6 .

1

  • i-x s 2-H

" 4 2- I s

t )4 f(

4 2

[ \" I S W Q

I n

o D 1

/

t n

C o

6

)U j

'11!!'

g sc s u)

U a

/~\

RSlH-47 fu\RSlH-48/

1385 RSlH-47 l Q D g Cont. on ISt-98A Q 1390 issa .

El. 7 \- - -

M -

Rs W W-7 M s f H-6 we \"*'"[

RStH-45 Q H-7 g[ M T"*'"*/

w-18 M'"

W g VM \ l = nANGER NO.

" = WELD NO.

RS El. 701'-6" M M 1448 Q '_uv-32oro 1442 V1439 g ,

g 3 g REF. DWG: XH-106-510 XH-106-1327

/ H-9 \ ~

\ ont.

C on ISI-9

\RS:H-9H-10 W-29 No Cont NSP - PRAIRIE ISLAND UNIT 1 ISI H-11 \RSlH-99 W (%*line) DWN:-)(45 CHKD: APPD:

\"5 "-**/ Safety injection 11 Discharge SYSTEM: Safe +v Iniection 11' Discharoe LINE NO: 2-SI-21 A -

DWG NO: ISI-98C REV: 0

+

Cont. on ISI-99B M T

r W -

.' - N.

e/ "4 A w

w/Ax v

f w/ +e \ -

w e \s~s/

j y=HavNo.-

s 7[

/ \ MWM 3-SI-15B H-2

\s 2[ M 199 El. 707-4%"

  1. ee o zQ w H-3 W w.18 M Cont. on ISI-100A'

\sr*44 '@ 95 , # El. 702'-71/8" W-17 3-SM5

@* Q TQ

@ cent on tsM02 V  !, El. 701'-9*

I REF. DWG: XH-106-81

- S.I. Pump #12 w-7 NSP - PRAIRIE ISLAND UNIT 1 ISI El. 699'-7 ,

d DWN:TrT CHKD: /h SYSTEM:- Safety Iniection 12 Discharoe APPD Safety injection 12 Discharge t_INE NO: As Noted ,

DWG NO: ISI-99A ' REV: O

-- - - - -- -- .___m_ _ _ _ - . _ . _ _ _ _ . _ . _ ._m.____.__m_.._._._m..._.,.,__.___._._..m____-. _____Ewws_ -

-,-u , _ , , , ~ ,,,,.e.,.,_ww.,c+.,-w- ,-c,,..#w,.,,,,.w... ,

EI. 719'-11 %"

W-17 W-13 W-12  ! 3\

SlH-55[ W-11 W-19 JL a -

\(2)

A I El. 711'-9" Cont. on ISI-97A W-15

H-2k , ,

wa o

\SlH-54[

El. 718*-11%"

b El. 708'-1%" w_1

[ISI k = HANGER No.

" ' " ' ^

= WELD No.

REF. DWG: NF-39332-1&2 NSP - PRAIRIEISLAND UNIT 1 ISI Safety injection 12 Discharge DWN:45 C'HKD: 7% APPD: %

SYSTEM: Safety Iniection 12 Discharae LINE NO: 3-S1-15B. 4-S1-15B DWG NO: ISl-99B REV: 0 e___ _ . _ _ __m_ _ _ . _ _ . .< _ _ _ _ _ _ , - - , , - . _ .- .n .y ... - . - , .  %.,m,m,., , _ .,m,,.-., , ,,,_.4 , , , , , _ , . _ , , _ _ , , _ _ , . _ _ , . ,

/^T V {V~] 'd El. 702'-8 5/8" S!H-35 H-6 \

S!H-36 H-4 st_,4 2 Cont. on ISI-1008 #

/ e W-18 g sip / Cont. on ISI-99A v

. M Q H-1\ El. 706' 7%" W M [H-2 W

W \='"-/

o M w

gw-27 3-SI-15A '

D Q w-13 Ne'"-/ w El. 702'-71/8" w f1 4 .SI-14A w

w / w, ,.,

W-4 8' "

w-23 El. 701'-9* M ISI \ = Hanger No. /7N4}

4 W W ,

4

/ Cont.on ISI-101 -

E 99'-7 V

V = WELD No' REF. DWG: XH-106-81 NSP - PRAIRIE ISLAND UNIT 1 ISI DWN:-htT5 CHKD:h APPD:[

Safety injection 11 Discharge SYSTEM: Safety iniection 11 Discharae LINE NO: As Noted DWG NO: ISI-100A REV: 0

a 2,

I S e I

a r

a 0 h

c  :

V

s O D E P iD N .

R R O 2 P 1 e

N E G

N N

D L "

1 T

N 1

I A 1 n

o E  % 2 Uht i

A 7 3 c r

e t

H W *-

6 A

0 3

9 D  : e s

=

N D i

= 0 0 3- A A 8 7 1 L

S HKyIn 5 0

\ I S

)I S

l E

I S

I o

n F

N I

E I

C ef t

a - S 1

IS 0

1 I

I (I t n

. G W A RITi S 3 I

[ \ C o

D PME R  : :

M O O N .

- : N N F P N T E G E S WYS N W R N D S I L D

\

)**

7 1 5-H l

S

/

\/

, e

\ n "> #* )7 4-4-

H /= #

7' w

/

8 D / ,

fY "0 6

3 1

- e 7

9- 9 g

r

/4 7 a We,M*:M\

m 1

H

)22-l E

9-6 1

7 W- h c

er l

S w l E

4' 1

i s

7 k L D E _

~ 1 2

' N 1 6- '

6-H H n 2 o

Dy3 h" l

S -

f i

t "6 /

1 s

c +

  • e

/ t 9

r -

w-0 1

3 7

5 2-w G G e,. ( j i

t n

y .

L E

2 3

f e

6 mX w- a 2-

[

W

  • " S 3 7

/e 3-H '

J_

7-0 3-W 7

0 2

3 2-w

_ H +

l

\ _

[\s 8

v-

/ M m

2 W-1 3- .

m W -

)..

2 3

A 81 "6 a m

'. _ w- \ 9/ 9 m

IS0 I 1 v n m o T- .

t

.3 7

n ol . _

CE m m _

m

O O Q~ .

(

N

, M h$$)

@  % M e

n= W w e ~i' sm W

,. / wi.\

- No ConL Y" Si-16-1 H -

Q W 11 xaww st-15-3 siH-463 j

w W ' --

El. 708*-%" '

w 37 / Ist "s 1105

.[ g_3 \. \-- -[. HANGER NO.

'y W-18  ;

Qy '

Conton ISI-1 3 g. siH-ef4.  : : - -e nt SI-100A = WELD NO.

W-2 W-1 wD REF. DWG: XH-106-4989 NSP - PRAIRIE ISLAND UNIT 1 - , .lSI i DWN:g CHKDi % / APPDd[

Safety injection Test Return SYSTEM: Safety Iniection Test Retum UNE NO: 2-SI-16A - i DWG NO:- ISI-101 REV: 0 i .

<- i +

^

'~~~

~

'~~# - ~

(

4 C~3 - (f i ,

IN?

Q

@MM e 2029 f

M M RSIK st/

g., y e

4 @%L 1075 ft j' h

ep No. Cont. Iik --\ 1071 El. 708'-8%"

1079 E M Y

= HANGER NO.

D o D r q cont 0 g 99 b:kSlH = WELD NO. ,.

cont. on Ist-103 5-A% NM i El. 70T-4%" I W

W.1 -

'?

El. 700'-4" W REF. DWG: XH-106-4988 NSP - PRAIRIE ISLAND UNIT 1. ISI DWN: .)(g CHKD: APPD:

Safety injection Test Return SYSTEM
Safety Iniection Test Retum -

LINE NO: 2-SI-16B DWG NO: ISI-102 REV: 0 .

. _ - _ - . . _ , _ _ - - , _ , ,_<.,.i...,,,,,.... .,. ,_,..v - , . ..,,,.,...i. .

O . f'\

v {~'

t >{

E N'

/ +i \

RSlH-3 Cont on No Cont (%"line) IS 02 El. 707-4%" A g 1000 is 1 M-,

w. tos7 r

I W2 W '"

@ SlH-38 o,

s 8 No Cont W4 W

Mv.3 . 2

[ isi \ = HANGER NO.

W-9 El. 705'-11 %"

\[

[wD '"

W U = WELD NO. .

REF. DWG: XH-106-6017 NSP - PRAIRIE ISLAND UNIT 1 ISI Safety injection Test Return DWN%4T CHKD: JhY APPD h SYSTEM: Safety iniection Test Retum UNE NO: 2-SI-6 DWG NO: ISI-103 REV: O

__ _-_______..-u.-_______-.m.- _ --___2_--__ ___------.-_m_.___-m--- ___ = '_.__a-__m' _-h 'ea_w+m'a L' ma ._ w ____ w 4+fww' e r .x _ m- _-- _ 4_ .-:*--4n-+'e _----we-_._:a-e.

NORTHERN STATES POWER INSERVICE INSPECTION PRAIRIE ISLAND EXAMINATION PLAN

- m UNIT 1 3RD INTERVAL B. The internal surface visual examination is done during maintenance:

Velan Motor Operated Gate Valves - Residual Heat Removal Return: Vi~-

1 of one valve. <

C. The intemal surface visual examination is done during maintenance: i Velan Check Valves - Safety injection: VT-1 of one valve.

D. The internal surface visual examination is done during maintenance:

Darling Motor Operated Gate Valve - Residual Heat Removal: VT-1 of one i valve in each size.

E. The internal surface visual examination is done during maintenance:

Crosby Relief Valve - Pressurizer Safety: VT-1 of one valve. ,

F. The pump internal surface visual examination is done during maintenace. ,

G. Dissimilar metal weld. l H. Encapsulated.

1. Enclosed in guard pipe.  ;

I J

l l

1 l

O  !

7-2 Revision 1 I 7/6/95

II, service IIspectioi Plan CId Schedule PrLirie Island Nuclear Gn ratirg Plxt, U;it 1 Third Ten-Year ASME See XI Code Ed.1989 f'N Relief Schedule

( i ISO Item ASME Requests

() System Item Description Item Number Method & Notes 95l96 97 99 00l02 xx xx pxx ISI- 1A H- 1 F-A CHARGING LINE 'B' HANGER /4 LUGS VT3 15I- 1A B- 2 F-A S

CHADGIh3 LINE 'B' SNUBBER VT3 ISI- 1A H- 3 F-A CHARGING LINE *B' SNUBBER VT3 ISI- 1A W- 1 8 9. 21 CHARGING LINE 'B' ELBOW - PIPE PT ISI- 1A W- 2 89, 21 CHAAGING LDS 'B' PIPE

  • ELBON PT ISI- 1A N- 3 8 9. 21 CHARGING LINE 'B' ELBOW - PIPE PT 181- 1A h- 4 B 9. 21 CHARGING LINE 'B' PIPE - 45' ELBOW PT ISI- 1A W- 5 B 9. 21 CHARGING LINE 'B' 45' ELBOW - P!PE PT

!$1- 1A W- 6 8 9. 21 CHARGING LINE 'B' PIPE - 45* ELBOW PT 231- 1A W- T B 9. 21 CHARGING LINE 'B' 45" ELBOW - PIPE PT ISI- 1A W- 9 B 9. 21 CHARGING LINE 'B' PIPE - ELBOW PT ISI- 1A W- 9 9 9. 21 CHARGING LINE 'B' ELBOW - PIPE PT 151- 1A W-10 9 9. 21 CHARG1HG LINE 'B' PIPE - ELBOW 45' PT 181- 1A W-11 8 9. 21 CHARGING LINE 'B' 45' ELBOW - ELBOW PT 151- 1A W-12 8 9. 21 CHARGING LINE 'B' ELBOW - PIPE PT I5I- 1A W-13 B 9. 40 CHARGING LINE *B' PIPE - HALF COUPLING PT

[ %, ISI- 1A W-14 B9 32 k CHARGING LINE *B' HALF COUPLING - PIPE PT f

\ ISI- 1B H- 1 F-A CHARGING LINE 'B' PUPTURE RESTRAINT VT3 ISI- IB H- 2 F-A CHARGING LINE 'B' FID LAT RESTRAINT VT3 ISI- IB H- 3 F-A CHARGING LINE 'B' BIGID P.ESTRAINT VT3 IS!* 1B H- 4 F-A CHARGING LINE 'B' LATERAL RESTRAINT VT3 ISI- 1B X- 5 F-A CHARGING LINE 'B' PID 1AT RESTRAINT VT3 ISI- 1B H- 6 F-A CHARGING LINE 'B' LATERAL RESTRAINT VT3 151- 1B H- T F- A CHARCING LINE *B' SPRING CLAMP VT3 ISI- IB W- 1 8 9. 40 CHARGING LINE 'B' VALVE - P2PE PT ISI- IB W- 2 B 9. 21 CHARGING LINE 'B' PIPE - RED TEE PT ISI- IB W- 3 8 9. 21 CHAkGING LINE 'B' RED TEE - ELBOW PT ISI- 1B W- 4 B 9. 21 CHARGING LINE *B' ELBOW - 45' ELBOW PT ISI- IB W- 5 B 9. 21 CHARGING LINE 'B' 45' ELBOW - PIPE PT 151- IB W- 6 B 9. 21 CHARGING LINE 'B' PIPE - Valve PT 152- 1B N- T B 9. 21 CHARGING LINE *B' VALVE - P!PE PT ISI- IB k- 9 8 9. 21 CHARGING LINE 'B' PIPE - ELBOW PT

> 151- 1B W- 9 8 9. 21 CHARGING LINE 'B' ELBOW - P2PE PT 351- IB Walo B 9, 21 CHARGING LINE 'B' PIPE - 45' ELBOW PT

!. 181- IB W-11 8 9. 21 k CHARGING LINE 'B' 45* ELBOW - PIPE PT 181- IB W-12 B 9. 21 f CHARGING LINE 'B' PIPE - 45' elbow PT ISI- IB W-13 8 9. 21 CHAkC6NG LINE 'B' 45' ELBON - PIPE PT Page 1

i i,

I:scrvice IIspection Plai c;d Sched:le Prz.irie Isla:d Nicle:r Generati:g Plait, Unit 1 Third Ten-Year i ASME See XI Code Ed.1989 l

% 1

/ 1 Relief Schedule j ISO '

j Item ASME Requests

,/ System Item Description Item Number Method & Notes 95 96 l 97 l 99 00l02 XX XX XX 153- 1B W-14 9 9. 21 CHARGING LINE *B' PIPE - ELBOW PT ISI- .18 W-15 B 9. 21 CHARGING LINE 'B' ELBOW - PIPE PT U

151- 1B W-16 8 9. 23 CHARGING LINE 'B' PIPE - 45* ELBOW PT ISI- la W-17 B 9. 21 CHARGING LINE 'B' 45' ELBOW - PIPE PT 151- 1B W-10 B 9. 21 CHARGING LINE 'B' PIPE

  • ELBOW PT ISI- IC H- 1 T-A CHARGING LINE 'B' ANCHOR VT3 0 153- 1C H- 2 F-A CKARGING LINE *B' LAT RESTRAINT /U-BOLT VT3 151* IC H- 3 F-A S

CHMGING LINE 'B' RUPTURE RISTRAINT VT3 ISI- IC W. 1 B 9. 21 CHARGING LINE 'B' PIPE - TEE PT b

151- IC W- 2 5 9. 21 CHARGING LINE 'B' TEL - PIPE PT ISI- IC W- 3 8 9. 21 CHARGING LINE 'B' P!PE - RED TEE PT

!$1- IC W- 4 B 9. 21 CHARGING LINE 'B' RED TEE - PIPE PT ISI- 1s* W- S B 9. 21 CHARGING LINE 'B' PIPE - VALVE PT 3- 1C W- 6 B 9. 21 CHARGING LINE 'B' VALVE - PIPE PT ISI- IC N- 7 8 9. 21 CHARGING LINE 'B' PIPE - RED TEE PT ISI- 1C W- 8 B 9. 21 CHARGING LINE 'B' RED TEE - P!PE PT

~~

\ Ibl- IC W- 9 B 9. 21 g j CHARGING LINE 'B' PIPE - VALVE PT b/ 151- AD H+ 1 F-A b

CHARGING LINE 'B' RIGID HANGER VT3 151- 1D W- 1 B 9. 40 OfARGING LINE 'B' SOCKOLET - PIPE PT 151- 1D W- 2 B 9. 21 CHARGING LINE 'B' PIPE - ELBOW PT 151* ID W- 3 8 9. 21 CHARGING LINE 'B' ELBOW - TFE PT 151- ID W- 4 B 9. 21 CHARLING LINE 'B' TEE - REDUCER PT ISI- 1D W- $ B 9. 21 CHARGING LINE 'B' TEE - PIPE PT 151- 1D W- 6 B 9, 21 CHARGING LINE 'B' PIPE - ELBOW PT ISI- 10 W- 7 8 9. 21 CHARCING LINE 'B' ELBOW - PIPE PT 151- 1D W- 8 B 9. 21 CHARGING LINE *B' PIPE - ELBOW PT ISI- ID W- 9 B 9, 21 CHARGING LINE *B' ELBOW - PIPE PT ISI- 1D W-10 B 9. 21 CHARGING LINE 'B' PIPE - ELBOW PT l 151- 1D W-11 B 9. 21 l CHARGING LINE 'B' ELBOW - PIPE PT ISI* 3D W-12 B 9. 21

_ CHARGING LINE *B' PIPE - ELBOW PT 151- 1D W-13 8 9, 21 CHARGING LINE 'B' ELBOW ~ TEE PT 151= 1D W-14 5 9. 21 CHARGING LINE 'B' TEE - REDUCER PT ISI* 1D W-15 B 9, 21 CHARGING LINE 'B' TEE - PIPE PT ISI- 1E H- 1 F- A CHARGING LINE *B' SPRING & LATERAL VT3 151- 1E H- 2 F-A k CHARGING LINE *B' SPRING CLAMP VT3 ISI- 1E Ha 3 P-A CHARGING LINE *B' IATEPAL RE$TDAINT VT3 181- it H- 4 F-A CHARGING LINE 'B' ROD /CLANP VT3 Page 2

o IIservice IIspection Plan tid Schedule Prairie Islaid Nucle:r G=rcting Plaxt, Unit I 1[hird 1ren-1 Fear ASME Sec XI Code Ed.1989

[ iso Ite4 ASME P NstB

/ Systein Item DeBetiption Item Number Method & Notes 95 96 l 9'l 99 00 f 02 lXX lXXXX I5!* LE H- 5 F-A

  • B' PIGID RESTAAINT VT3 0

CHARGING LINE III- 3E H- 6 F-A LATEkAL RESTRAINT YT3

  • b CHARGING LINE 'B' ISI- 1E W- 1 B 9. 21 )

CHARGING LINE 'B' ELBOW = PIPE PT l 1

ISI- 1E W- 2 B 9. 21 PIPE - 45* ELBOW PT b

CHARGING LINE 'B' ISI- 1E W- 3 B 9. 21 45* ELBOW - PIPE PT U

CHARGING LINE 'B' ISI- 1E W- 4 8 9. 21 CHARGING LINE 'B' PIPE - PIPE PT ISI- 1E W- 5 8 9. 21 CHARGING LINE 'B' PIPE

  • ELBOW PT 131- IE W- 6 B 9. 21 CKARGING LINE *B' ELBOW - PIPE PT ISI- IE W- 7 8 9, 21 CHARGINu LINE 'B' PIPE - ELBOW PT

~~~~

!$1- 12 W- A B 9. 21 S

CHARGING LINE 'B' ELBOW - PIPE PT ISI- 1E W- 9 8 9. 21 CHARGING LINE 'B' PIPE - ELBOW PT ISI- 3E W-10 B 9. 21 CHARGING LINE 'B' ELBOW - PIPE PT 181- 1E W-11 B 9. 21 CHARGING LINE 'B' PIPE - 45' ELBOW PT

~'I S I- IE W-12 B 9. 21 CHAPGING LINE 'B' 45* ELBOW - PIPE PT Ial- It W-13 B 9. 21 CHARGING LINE 'B' PIPE - 45' ELBOW PT

!$1- 1E W-14 B 9. 21 CHARGING LINE 'B' 45* ELBOW - PIPE PT

/"~A ISI- 1E W-15 B 9. 40 CHARGING LINE 'B' PIPE - $0CKOLET PT Q IS!- IF B- 1 B 7. 50 CHARGING LINE 'B' FLANGE BOLTS VT1 ISI- IF H- 1 F-A CRARGING IINE 'B' DBLE SNUBBR N/ CLAMPS VT3 ISI- 1F W+ 1 B 9. 21 CHARGING LINE 'B' Valve - PIPE PT ISI- 1F W2 B 9. 21 CHARGING LINE 'B' PIPE - FLANGE PT 158- IF W- 3 B 9. 21 CHARGING LINE 'B' FLANGE - RED. TEE PT ISI- IF W- 4 8 9. 21 CHARGING LINE 'B' RED. TEE - 45' ELBOW PT 153* 1F W- 5 B 9. 21 CHARGING LINE *B' 45' ELBOW - PIPE PT 18!- 1F W- 6 8 9. 21 CHARGING LINE 'B' PIPE - 45* ELBOW PT 181- IF W- 7 8 9. 21 CHARGING LINE 'B' 45' ELBOW - PIPE PT 38i- IF W- 0 B 9. 21 CHARGING LINE 'B' PIPE - 45' FLBoW PT 131- 2 P1 8 7. 70 ACCUM. DISCHARGE 'A' BOLTS, STUDS, NUTS VT1 381- 2 B- 2 B7 70

,ACCUM. DISCHARGE 'A' B3LTS, STUDS, NUTS VT1 181- 2 N- 1 F-A

'q ACCUM. DISCHARGE 'A' SNUBBER VT3 353* 2 H- 2 F-A ACCUM. DISCRARGE 'A' HYDR SNUPBER VT3 ISI- 2 H+ 3 F-A & B10. 10 ACCUM. DISCRARGE 'A' SPRING 151- 2 V- 2 B12. 50 g ACCUM. DISCHARGE 'A' VALVE INT SURFACES VT3 IJ1- 2 V- 2 812, 50 A

,ACCUM. DISCHANGE 'A' VALVE INT SURFACES VT3 g 153- 2 W- 1 B 9. 11 ACCUM. DISCHARGE 'A' VALVE - PIPE PT UT

%-- ISI- 2 W- 2 B 9. 11 ACCUM. DISCHA3GE 'A' PIPE - ELB3W PT UT 151- 2 W- 3 B 9. Il P.C CIN . DISCHAHGE 'A' ELBOW = PIPE g

PT UT Page 3

e

-l

_ Irservics lispection Plam czd Schedule ' d Prairie Islaid NIeleer Gmr:.tiIg Plant, Unit 1 'l Third Ten-Year - l ASME See XI Code Ed.1989

-]

r.g. 'Rellef Schedule' '

17,0 Item ASME Requests

(

1 System- Item Description Item Number Method & Notes 95 96 9'l 99 00 02 xx XX}xx ,

i Is3 2 W- 4 5 8. 11 '1 ACCtM, DISCHARGE 'A' -

PIPE - ELBOW PT UT J 151- 2 . .

W- 5 B 9. 11 )

ACCtM. DISCHARGE ' A' ELBOW - VALVE . PT UT <

151= 2 W- 6 B 9. 11 .l ACCUM.' DISCHARGE 'A' VALVE - PIPE PT UT l 251- ' 2 W- 7 8 9. 11 PIPE - ELBOW = PT UT- S ACCUM. DISCHARGE 'A' Isi- 2 W- a B 9. 11 l ACCUM. D18CHA8tGE 'A' ELBOW - Not!LE PT UT ,

Is3- 2 W- 9 8 9. 31 I S

ACCUM. DISCHARGE 'A' NOZELE - P!PE PT UT f 153- 3A B- 1 9 T, 70 -j RHR LOOP *A' VALVE BOLTING VT1 i H- 1 151- 3A - F-A RHR LOOP 'A' RUPTURE RESTRAINT VT) 151 . 3A H- 2 F-A RHR LOOP 'A' RIGID RESTRNT/2 LUGS VT3 151- 3A H- 3 F-A {

RHR LOOP 'A' DOUBLE $PRING VT3 j ISI- 3A- H- 4 F-A RHR LOOP 'A' 81ESMIC RESTRAINT VT3 f 151- 3A H- 5 F-A  !

RHR LOOP 'A' RUPTURE RESTRAINT VT3 I$3- 3A H- 6 F-A RHR LOOP 'A' RUPTURE RESTRANT VT3  ;

ISI- 3A - H- 1 F-A RHR LOOP 'A' RESTRAINT LUGS VT3 IC1- 3A N- 8 F-A RHR LOUP 'A' RUPTURE RESTRAINT VT3 ,

III- 3A V- 1 .

812. 50 g ,

RHR LOOP 'A' VALVE INT SURF VT3 .3 ISI- 3A . Na 1 8 9. 31 '

[ RHR LOOP 'A' N012LE - PIPE PT UT 183= 3A W- 2 B 9.11 RHR LOOP 'A' N021LE - PIPE PT UT

!$3- 3A W- 3 8 9. 11 .j RHR LOOP 'A' PIPE - 45* ELBOW PT UT 15I- 3A W4 8 9. 11  ;

PT UT RHR LOOP 'A' 4S' ELBOW - ELBOW 131- 3A W- S B 9. 11 RHR LOOP 'A' ELBOW = PIPE PT UT J~

151- 3A W6 B 9. 21 '

RHR LOOP 'A' PIPE - ELBOW PT UT 181- 3A W- 7 89, II - '

RHR LOOP 'A' ELBOW - PIPE PT UT ISI- 3A W- O B 9. 11 i RHR LOOP 'A' PIPE - PIPE PT UT 153- 3A W- 9 9 9. 11 kHR LOOP 'A' PIPE - ELBOW PT UT ISI- 3A W-10 B 9. 11 kHR LOOP 'A' ELBOW - VALVE PT UT 181- 3A W-11 8 9. 11 RHR LOOP 'A' VALVE - PIPE PT UT 381- 3A W-12 B 9. Il RHR LOOP ' A' PIPE - ELBOW PT UT 181- 3B H- 1 F-A RHR LOOP 'A' DOUBLE $PRING HANGER VT3 -

3SI- 3B H- 2 F-A )

RHR LOOP 'A' RUPTURE RESTRAINT VT3 l 181= 3B H~ 3 F- A RHR LOOP *A' RUPTURE RESTRAINT VT3 ISI- 3B H- 4 F-A RHR LODP 'A' STRUT CLAMP VT3 ISI- 3B Ha S F-A RHR LOOP 'A' 2 HANGER LUGS VT3 151- 3B H- 6 F- A RHR LOOP 'A' RUPTURE RESTRAINT VT3 i

ISI* 3B H+ 7 F-A J

{ RHR LOOP 'A' SIESMIC RESTRAINT VT3 l

\ ISI- 3B H- 0 F-A g RHR LOOP 'A' ROD VT3 i ISI- 3B W- 1 B 9.11 l S

RHR LOOP 'A' ELBOW = P2PE PT UT Page -4 I

a

-- _ -. - - - , - - - w- -

- - , y--- v 4 =f r-

Inservice Irspection Plan cd SchedIle Prairie Island N cle r Grr;ti1g Plait, UIit I Third Ten-Year ASME See XI Code Ed.1989 i' C'\ 150 Item ASME u ts

-( l System Item Description Item Number Methud & Notes 99 00 02 XX XX XX w/ 95l96l97 l ISI- 3B W- 2 89. Il

!. RHR LOOP 'A' PIPE - ELBOW PT UT ISI. 3B W- 3 8 9. 11 RHR LOOP 'A' ELBOW = PIPE PT UT

!$1- 3B W- 4 8 9. 11 kHR LOOP 'A' PIPE - 45* ELBOW PT UT III- 3B N- b B 9. 11 4$' ELBON - P!PE S RHR LOOP 'A' PT UT 153- 3C B- 1 B 7. 70 RHR LOOP 'A' VALVE BOLTING S

VT1

!$1- 3C H- 1 F-A RER LOOP 'A' HANGER YT3 S

ISI- 3C H- 2 F-A RHR LOOP ' A' HANGER LUGS 2 VT3 S 151- 3C H- 3 F-A RHR LOOP ' A' RUPTURE RESTRAINT VT3 S

!$3- 3C H- 4 F- A RHR LOOP 'A' S

ROD / CLAMP VT3 ISI- 3C H- S F-A RHR LOOP 'A' RUPTURE RESTRAINT VT3 S 131- 3C H- 6 F-A RHR LOOP 'A' SNUBBER / CLAMP VT3 151- 3C H+ 7 F-A RHR LOOP 'A' RUPTURE RESTRAINT VT3 ISI- 3C H- 0 F-A RHR LOOP 'A' ROD HANGER VT3 ISI- 3C H- 9 F-A RHR LOOP ' A' RUPTURE RLSTRAINT VT3 ISI- 3C H-10 F-A RHR LOOP 'A' 2 LUG 5 VT3 ISI- 3C H-10 B10. 10 RHR LOOP 'A' 2 LUG 8 MT UT ISI- 3C V- 1 B12. 50 s

  • RHR LOOP 'A' VALVE INT SURFACES VT3 k 151- 3C N- 1 B 9. 11

/ S RHR LOOP 'A' PIPE - 45' ELBOW PT UT 131- 3C W- 2 B 9. Il RHR LOOP 'A' 45' ELBOW - PIPE PT UT ISI- 3C W- 3 B 9.11 RHR LOOP 'A' PIPE - ELBOW PT UT ISI- 3C u- 4 8 9. Il RHR LOOP 'A' ELBON - PIPE PT UT ISI- 3C N- S B 9. Il RHR LOOP 'A' PIPE - ELBOW PT UT 181- 3C W- 6 B 9. 11 MR LOOP ' A' ELBou - PIPE PT UT IS!- 3C W- 1 B 9. 11 RHR LOOP 'A' PIPE - ELBOW PT UT 181- 3C W- 8 B 9.11 RHR LOOP 'A' ELBOW - PIPE PT UT 151- 3C W- 9 B 9. Il RHR LOOP 'A' PIPE ** ELBON PT UT ISI- 3C W-10 B 9. 11 g

MR LOOP ' A' ELDOW - Valve PT UT

!st- 5A H- 1 F-A SPRAY TO PPISSURIZER DOUBLE SNUBBER / CLAMP VT3 181- LA H- 2 F-A SPRAY TO PRES $URIZEk RUPTORE RESTRAINT VT3 1$1 SA H- 3 F- A SPRAY TO PRES 5URIEER DOUBLE SPRING VT3 181- SA H- 4 F-A SPRAY TO PRES $URIZER HYDR SNUBBER /CIAMP VT3 ISI- 5A H. 5 F-A g

SPRAY TO PRES 3URIZER RIG 1D/ CLAMP VT3 333 5A H- 6 F-A SPRAT TO PRES $URIZER MYDR ENUBBER/ CLAMP VT3 IS!- SA W- 1 B 9. 32 SPRAY TO PRES 5UR1ZER P1PE - NOZZLE PT g 3SI- SA W- 2 B 9. 21 j SPMY TO FRESEURIEER NOZZLE - ELBOW l'T (f 233- *A

. W- 3 B 9. 21 SPMY TO PRES $URIZER ELBOW - PIPE PT 151- SA W- 4 8 9, 21 BPRAY TO PRESSURIZER PIPE - ELBOW PT

]

Page 5

1 1

l I service 1:spectio3 Plaxnd Schedule Prcirle Isind Nucle:r Gr: rating Plant, Unit 1 1rhird 'ren-1' ear ASME See XI Code Ed.1989

/' ^'T Relief Schedule I t 3 ISO Item ASME Requests I Item Number Method

(/ System Item Description & Notes 95 96 l 97 l 99 l 0002 l XX l XXXX ISI. EA W- 5 B 9. 21 SPRAY TO PRES $UPIEER ELBON = PIPE PT iSI- LA W+ 6 89, 21 SPRAY TO PRESSURItER P!PE - VALVE PT ISI- 5A W- 7 B 9. 21 PT b

SPRAY TO PRESSURt1ER VALVE - ELBOW ISI- LA W- O 8 9. 21 SPRAY TO PRESSURIZER ELBOW - PIPE PT ISI* SA W- 9 8 9. 21 SPRAY TO PRESSURIEER P!PE - REDUCING TEE PT i ISI* EA W-10 B 9. 21 b '

SPRAY TO PRES $URIZER REDUCING TEE - PIPE PT ISI* 5A W-11 B 9. 21 SPRAY TO PRES 50RIZER PIPE - ELBOW PT ISI- SA W-12 8 9. 21 SPRAY TO PRESSURIZER ELBOW - PIPE PT 381- bA W-13 D 9. 21 SPRAY TO PRESSURIZER PIPE - 45' ELBOW PT IS!* SA W-14 B 9. 21 SPRAY TO PRESSURIZER 4$* ELBOW - PIPE PT ISI- 5A W-15 B 9. 21 SPRAY TO PRESSURIZER PIPE - VALVE PT ISI- EA W-16 B 9. 21 SPRAY TO PRESSURIEER VALVE - PIPE PT _

3SI- 5A W-17 8 9. 21 GPkAY TO PRESSURIZER PI PE - 4 5

  • ELBOW PT ISI- bB H- 1 F-A SPRAY TO PRESSURIZER ROD / CLAMP VT3 ISI- SB H- 2 F-A SPRAY TO PRESSURIZER DOUBLE HYDR SHUBBER VT3 ISI- 6B H- 3 T-A SPRAY TO PRESSUk!ZER RIGID RANGER VT3 A ISI- SB H- 4 F-A SPRAY TO PRESSURIZER ROD / CLAMP VT3 f

(,/ 151- SB H+ 5 F- A SPRAY TO PRESSURIZER ANCHOR KANGER VT3 151- SB H- 6 F-A SPRAY TO PRESSUR!!ER DOUBLE SKUBBER/ CLAMP VT3 151- SB H- 7 F-A SPRAY TO PRESSURIEER DOUBLE STRUT W/ CLAMP VT3 ISI- 5B H- 6 F-A SPAAY TO PRESSURIEER ROD / CLAMP VT3 ISI- SB W- 1 B 9. 21 SPRAY To PRESSURIZER 4 5' ELBOW - P!PE PT ISI- bB W- 2 B 9, 21 SPRAY TO PRESSURIZER P!PE - ELBOW PT ISI- 5B W- 3 B 9. 21 SPRAY TO PRESSURIZER ELBOW - PIPE PT ISI- 5B W- 4 B 9. 21 SPRAY TO PRESSURIZER PIPE - ELBOW PT ISI- 5B W- S B 9. 21 SPRAY TO PRESSURIZER ELBOW - PIPE PT ISI- SB W- 6 B 9. 21 SPRAY TO PPESSURIZER PIPE - 45* ELBOW PT ISI- bb W- 1 B 9. 21 EPRAY TO PRESSURIZER 4$' ELBOW - PIPE PT ISI- SB W- 8 8 9. 21 SPRAY TO PRESSURIEER PIPE - 4S' ELBOW PT ISI- SB W- 9 9 9. 21 SPkAY TO PRESSURIZER 45' ELBOW - PIPE PT 131- $B W-10 # 9, 21 SPRAY TO PRESS 7RIEER PIPE - 45' ELBOW PT 181- $B W-11 B 9. 21 SPRAY TO PRESSURIZER 4 5

  • ELBOW - P1PE PT i 1

151- BB W-12 B 9. 21 SPRAY TO PkESSURIZER P!PE - 4 S' ELBOW PT j 151- 5B W-13 B 9. 21

]

SPRAY TO PRESSURIZER 45' ELBOW ~ P!PE PT

[

g

^}

ISI- SB SPRAY TO PRESSURIZER W-14 FIPE - TEE B 9. 21 PT

    • ~e 'ISi- 5B W-15 B 9. 23

$ PRAY TO PRESSURIZER TEE - PIPE PT ISI- SB W-16 8 9. 21 l SPRAY TO PRESSURILER PIPE - ELBOW PT Page 6

Itservice Irspectio2 Plan cad Schedule Prcirle IslaId N:cle:r G= rating Plut, Urlt 1 Third Ten-Year ASME Sec XI Code Ed.1989

/, m\ Reliet Schedule ISO Item ASME Requests

((,<) System Item Description Item NumbeE Method & Notes 95 96 97 99 00 02 l XX XX XX ISI- 5B W-17 B 9, 21 SPPAY TO PRESSURt2ER ELBOW - PIPE PT ISI- 5B W-18 9 9. 21 SPRAY TO PRESSURIEER PIPE - ELBOW PT IS!- 5C H- 1 F- A g

SPRAY TO PRESSURIZEP DOUBLE STRUT VT3 ISI- SC H- 2 F-A SPPAY TO PRESSURIZER SEISMIC RESTRAINT VT3

, ISI- SC H- 3 F-A SPRAY TO PRESSUR!EER CONSTANT SUPPORT VT3 ISI- bc W. 1 8 9. 21 SPRAY TO PRESSURIZER ELBOW - PIPE PT ISI- SC W. 2 B 9, 21 SPRAY TO PRESSURIZER PIPE - PIPE PT LSI- SC W- 3 9 9. 21 3

SPRAY TO PRESSUR!!ER PIPE - ELBOW PT ISI- SC W- 4 B 9. 21 SPRAY TO PRESSURIZER ELBOW ~ PIPE PT ISI- SC W- 5 B 9, 21 SPRAY TO PRESEURIZER PIPE - 45' ELBOW PT IS!* 5C W- 6 89 21 SPRAY TC PRESSURIEER 45' ELBOW - P1PE PT ISI- bC W- 7 8 9. 21 SPRAY TO PRESSURIZER PIPE - PIPE PT 151- bC W- 8 B 9. 21 SPRAY TO PRESSURIZER PIPE - 45' ELBOW PT ISI- SC W- 9 B 9. 21 SPRAY TO PRES $URIEER 45' ELDOW - PIPE PT 151- 5C W-10 89 21 SPRAY TO PRESSURIZER PIPE - PIPE PT YI- SC W-11 B 9. 21 SPRAY TO PRESSURIEER PIPE - ELBOW PT (N ISI- SC SPRAY TO PRESSURIZER W-12 ELBOW - REDUCER B 9, 21 PT

{

(< 181- SC W-13 B 9, 21 PT SPRAY TO PRESSURIZER _

REDUCER ISI- SC W-14 8 5. 40 g SPRAY TO PRESSURIZER SAFE END TO PRESS PT UT 151* LD H- 1 F-A SPRAY TO PRESSURIZER RUPTURE RESTRAINT VT3 ISI* LD W- 2 F-A SPRAY TO PRESSUBIEER Ruf."sRE RESTRAINT VT3 F- A I ISI* LD H- 3 SPRAY TO PRESSURITER SPRING CLAMP VT3 ISI- ED H- 4 F-A SPRAY TO PRESSURIZER SIESMIC kESTRAINT VT1 I

151* SD H- 5 F-A SPRAY TO PRESSURIZER RUPTURE RESTRAINT VT3 ISI- SD H- 6 F-A SPRAY TO PRESSURIZER SLIDING SUPPORT VT3 IS!- 5D H- 7 F-A g

SPRAY TO PRESSURIZER RUPTURE RESTRAINT VT3 ,

ISI- SD H- 6 F- A SPRAY TO PRESSURIZER SLIDING SUPPORT VT3 ISI- *sD H- 9 F-A SPRAY TO PRESSURIZER DBL HYDR SNUBBR/CIMP VT3 b

ISI- 5D H-10 F-A SPRAY TO PRESSURIZER SPRING CLAMP VT3 ISt- 5D W- 1 B 9. 32 l SPRAY TO PRESSURIEER PIPE - N0Z11.E S i PT ISI- LD W- 2 B 9. 21 I SPRAY TO PPESSURIZER HUR ELE - PIPE PT b  !

ISI* SD W- 3 B 9, 21 SPRAY TO PRESSURIZER P!PE - ELBOW PT ISI- 5D W- 4 8 9. 41 SPRAY TO PRESSURitER ELBOW - PIPE PT ISI- 5D W- 5 B 9. 21 SPRAY TO PRESSURIZER PIPE - VALVE PT

[ 181- LD W- 6 89, 21 k _ SPRAY TO PRESSURIZER VALVE - P2PE PT

- ISI- SD W7 89, 21

$_ PRAY TO PRESSURIIER PIPE - 45' ELBOW PT ISI- 5D W- 8 B 9. 21 SPRAY TO PRESSUR!IER 45' ELROW - P!FE g

PT Page ~1

m o .

) .L Inservics IIspectioi Plam cad Schedile Prairie Isla:d NIcle:r Geratirg Plait, Unit 1 Third Ten-Year -

ASME Sec XI Code Ed.1989 Relief Schedule-1 150 -' Item ASME

.( -: Requests

.Systiam ; Item Description Item Number. Method & Notes 95!96 97 99 00 02 XX XX XX 183* SD W- 9 8 9. 21 SPRAY TO PDESSURIEER PIPE - 4b' ELBOW PT 183- SD W-10 8 9, 21 SPRAY TO PRESSURIZER 4&' ELBOM - PIPE PT, 183- SD N-11 B 9. 21 -

SPRAY TO PRE 55UR!EER PIPE - ELBOW PT-ISI- SD W-12 8 9. 21 SPRAY TO PRESSURIZER ELBOW - P1PE PT -

133- $D W-13 B 9, 21 SPRAY 73 PRES $URIZER PIPE

  • ELBOW PT-181- SD N-14 8 9, 21 SPRAY TO PRESSURIZER ELBOW - PIPE PT 183- SD W-15 B 9. 21 .

SPPAY TO PRESSURIEER P!PE - TEE PT b

181- 6 81 B 7. 50 RfD REtrAN 'A' BOLT 3 FLANGE VT1 0

I5I- 6 H- 1 F-A S

RfD RETURN 'A' RUPTURE RESTRAINT VT3 ISI. 6 N- 1 B 9. 21 RfD RETURN 'A' REDUCER - TEE PT ISI+ 6 W- 2 B 9, 21 RfD RETURN 'A' TEE - PIPE PT ISI- 6 W- 3 8 9. 21 RfD RETURN 'A' PIPE - P!PE PT ISI- 6 W- 4 8 9. 21 RfD RETURN *A' P!PE - FLANGE PT 151- 6 u- S B 9. 21 RfD RETURN 'A' FLANGE = P2PE PT 183- 6 W- 6 B 9. 21 S

RfD RETURN 'A' P2PE - ELBON PT ISI W- 7 8 9, 21

.. . STD RETURN 'A' ELBOW - PIPE PT g Is3- 6 w- 6 B 9. 21 RfD RETURN 'A' PIPE = VALVE PT 331- 6 W- 9 B 9. 21 STD RETURN 'A' VALVE - P!PE PT -

ISI- 6 W-IO B 9. 21 RTD RETURN 'A' PIPE - ELBOW PT 181- 6 W-11 B 9, 21 RTD RETURN 'A' ELBOW - NOZELE PT 181 6 W-12 B 9. 32 RTD PETURN 'A' No12LE - PIPE PT b

ISI- 7 Ha 1 F-A RfD TAKE OFF 'A' CLD RUPTURE RESTRAINT VT3 153 1 H- 2 F-A RfD TAKE OFF ' A' CLD RUPTUPE RESTRAINT VT3 18!= 7 1- 3 F-A RfD TAKE OFF 'A' CLD SPRING HANGER VT3

-!$1- 1 H- 4 F-A RfD TAKE OFF 'A' CLD RUPTURE RESTPAINT S VT3 131 7 H- 5 F-A

' RTD TAKE OFF 'A' CLD RUPTURE RESTRAINT VT3 153- ? H- 4 F-A RfD TAKE OFF 'A' CLD LATERAL RESTRAINT YT3 351 7 W- 1 B 9. 32 g RTD TAFE OFF ' A' CLD PIPE - HALF COUPLING PT 153- 7 N- 2 8 9. 40 RTD TAKE OFF ' A' CLD HALF COUPLING - PIPE PT 151- 7 u- 3 8 9. 40 RfD TAKE OFF ' A' CLD PIPE - VALVE PT ISI- 7 W- 4 8 9. 40 RfD TARE OFF 'A' CLD VALVE - PIPE PT -

383- 7 W- 6 3 9. 40 RTD TAKE OFF 'A' CLD P!PE - VALVE PT 181- 7 W- 6 8 9. 40 RTD TAKE OFF 'A' CID Valve - PIPE PT III- 7 W- 7 B 9. 21 R7D TAKE OFF ' A' CLD PIPE - ELBON PT ISI- 7 N- 0 B 9. 21 RTD TAKE OFF 'A' CLD ELBOW - PIPE PT 151 , 7 - W- 9 B 9. 40 RTD TAKE OFF ' A' CLD P!PE - RfD NANIFOLD PT 133- 7 W-10 B 9. 40 RfD TAKE OFF 'A' CLD RfD NANIFOLD - P!PE PT Page 8:

l L

Itservice I spection Plam c d Sched:le Pr:Irie Isla d N cle r G=er tlIg Plant, U it 1 Third Ten-Year ASME Sec XI Code Ed.1989  ;

/

es ^

ASME Relief Schedule ISO Item Requests s / System Item Description Item Number Method & Notes 95 96 97 99 00l02 XX XX XX W

131- 7 W-11 B 9. 21 RTD TAKE OFF 'A' CLD PIPE - ELBOW PT ISI- 7 W-12 8 9. 21 RfD TAKE OrF *A' CLD ELBOW - P!PE PT ISI- 7 W-13 B 9. 40 b

RfD TAKE OFF 'A' CLD PIPE - VALVE PT ISI- 7 W-14 8 9. 40 b

RfD TAKE OFF 'A' CLD VALVE - PIPE PT ISI- 7 W-16 B 9. 23 i RTD TAFE OFF ' A' CLD PIPE - ELBOW PT 131- 7 W-36 B 9. 21 RTD TAKE OFF 'A' CLD ELBOW - PIPE PT ISI- 7 W-17 8 9. 21 STD TAKE OFF 'A' CLD PIPE - ELBOW PT ISI- 7 W-18 B 9. 2.

RTD TAKE OFF 'A' CLD ELBOW - PIPE PT 131- 7 W-19 8 9. 21 RTD TAKE OFF ' A' CLD PIPE - ELBOW PT 151- 1 W-20 B 9. 21 RTD TAKE OFF ' A' CLD ELBOW - P!PE PT 151- 1 W-21 8 9. 21 RTD TAFE OFF ' A' CLD PIPE - ELBOW PT ISI- 7 W-22 B 9, 21 ELBOW - TEE PT

_RTD TAKE OFF ' A' CLD 151* e H- 1 F-A RTD TAKE OFF 'A' HOT RUPTifkE RF.STRAINT VT3 151- 8 H- 2 T-A RTO TAKE OFF 'A' HOT RUPTURE RESTRAINT VT3 ISI- 9 H- 3 F-A S

RTD TAKE OFF ' A' HOT RUPTURE RESTRAINT VT3 ISI- 0 H- 4 F-A RUPTUPI RESTRAINT VT3 b

RTD TAFE OFF 'A' HOT q I5I- 9 W- 1 B 9. 21 RfD TAKE OFF 'A' HOT REDUCER - CROSS PT

)

\ / 181- 8 RfD TAKE OFF ' A' HOT W- 2 REDUCER - CROSS B 9. 21 PT Isla 8 W- 3 B 9, 21 RfD TAKE OFF ' A' HOT REDUCER - CROSS PT 151- 6 W- 4 B 9. 21 RfD TAKE OFF ' A' HOT CROSS - 63' ELBOW PT j 151- 8 W- 5 B 9. 21 RTD TAFE OFF ' A' HOT 63' ELBOW - PIPE PT iSI- 8 W- 6 9 9. 40 RTD TAKE OFF 'A' HOT PIPE - VALVE PT ISI- 0 W- 7 B9 40 )

RTD TAKE OFF 'A' HOT VALVE - PIPE PT 151- 9 W- B B 9. 4 0 , 1

_RTD TAKE OrF 'A' HOT PIPE - VALVE PT l 151- 0 W- 9 8 9. 40 RfD TAKE OFF ' A' HOT VALVE - PIPE PT 181- 0 W-10 89 21 3 RfD TAKE OFF ' A' HOT PIPE = RTD MANIFOLD PT ISI- 8 W-l! B9 21 i RfD TAKE OFF 'A' HOT PTD MANITOLD - PIPE PT j

!$!- 8 W-12 8 9. 40 l RTD TAKE OFF 'A' HOT P2PE - VALVE PT ISI- 0 W-13 B 9. 40 i PTD TAKE OFF 'A' HOT VALVE - PIPE PT ISI- 8 W-14 8 9, 23 RTD TAKE OFF 'A' HOT PIPE - ELBOW PT ISI- O W-lb B 9. 21 RTD TAKE OFF ' A' HOT ELBOW = PIPE PT 151- 8 W-16 8 9, 21 RTD TAKE OFF ' A' HOT PIPE - ELBOW PT ISI- 9 W-1T B 9. 21 RTD TAKE OFF 'A' HOT ELBOW - PIPE PT ISI- 4 W-18 8 9. 2)

RTP TAPE OFF ' A' HOT P!PE - ELBOW PT

/  % 151- 9 W-IP B 9. 21 RfD TAKE OFF ' A' HOT ELBOW - PIPE (jf

\ ISI- 0 W-20 8 9. 21 PT RTD TAKE OFF 'A' HOT P!PE - ELBOW PT 131* 8 W-21 B 9. 21 RTD T AKE OFF ' A' MOT ELBOW = PIPE PT Page 9

IIservice IIspectioa Plaa tid Schedule Pr:Irie Isla:d Nrclear G:nerati:g Plant, Uzit I .

Third Ten Year ASME See XI Code Ed.1989 m Relief Schedule

, ISO Item ASME Requests i) system Item Description Item Number Method & Notes 95 96 97 99l00l02lXX :XXlXX v,

351* 9 N-22 8 9, 21

'A' HOT P!PE - ELBOW PT

,RTD TAFE OTT l$1- 9 W-23 B 9. 21 ATD TAFE OFF 'A' HOT ELBOW = REDUCER PT ISI- 9 B- 1 B 7. 70 VT1 b

418 HIGH HEAD 'A' VALVE BOLTING 151- 9 H- 1 F-A

$15 HIGH HEAD ' A' DOUBLE SPRING HANGER VT3 15I. 9 H. 2 T-A VT3 b

SIS HIGH HEAD 'A' HYDR $NUBBER/ CLAMP _.

ISI- 9 H- 3 F-A VT3 b

SIS HIGH HEAD *A' HYDR SNUBBER /CIAMP 153- 9 V- 1 B12. 50 e

$15 HIGH HEAD 'A' VALVE IHT SURFACES VT3 ISI- 9 W+ 1 B 9. 40 S

518 HIGH HEAD 'A' VALVE - PIPE PT ISI. 9 N- 2 B 9. 21 515 HIGH HEAD 'A' PIPE - TEE PT ISI- 9 W- 3 B 9. 21 5IS HIGH HEAD 'A' TEE - PEDUCER PT 181- 9 N- 4 8 9. 21 SIS h1GH HEAD 'A' TEE - ELBON PT ISI- 9 W- S B 9. 21 515 HIGH HEAD 'A' ELBOW - PIPE PT 151 9 N- 6 8 9, 21 SIS HIGH HEAD 'A' PIPE - PIPE PT ISI- 9 W- 7 8 9. 21 SIS HIGH HEAD 'A' PIPE - REDUCER PT ISI- 9 W- 8 89 31 SIS HIGH HEAD 'A' REDUCER - VALVE PT UT 151- 9 W- 9 B 9. 11 515 HIGH HEAD 'A' VALVE - ELB0W PT UT

.m 1$1- 9 W-10 B 9. 11

[\ \! SIS HIGH HEAD ISI- 9

'A' ELBOW - NotELE N-11 B 9. 31 PT UT 518 HIGH HEAD 'A' NOZZLE - PIPE PT UT ISI- 10 H- 1 P-A DRN (ON CROSSOVER) A LATERAL RESTRAINT VT3 151- 10 H- 2 T-A DRN (ON CROSSOVER) A DBLE SPRING / BENT BAR VT3 151- 10 H- 3 F-A DRN (ON CROSS 0VEkl A SPRING CLAMP VT3 151- 10 W- 1 B 9. 32 DRN (ON CROSSOVER) A PIPE TO RALF COUPLNG PT 151- 10 W- 2 B 9. 40 DRN (ON CkOSSOVER) A HALF COUPLING - PIPE PT ISI- 10 N- 3 8 9. 21 DEN (ON CROSSOYER) A PIPE - ELBOW PT 153- 10 N- 4 B 9, 21 I$N (ON CROSSOVER) A ELBON - PIPE PT

!$I. 10 W. 5 B 9. 21 DRN (ON CROS$0VERl A PIPE - ELBON PT ISI- 10 N- 6 B 9. 21

!$.N (DN CROSSOVERI A elbow - PIPE PT ISI- 10 W- 7 B 9. 21

!*N (ON CROESOVERI A P1PE - PIPE PT 151* 10 N- 9 8 9. 21 DRN (ON CROSSCVER) A PIPE - ELBON PT ISI- 10 W- 9 8 9. 21 DRN (ON CROSSOVER) A ELBOW - PIPE PT I$1- 10 W-10 B 9. 21 f*N (ON CROSSOVER) A PIPE - RED TEE PT 151* 10 Wall B9 21 DRN (ON CROSSOVER) A RED TEE - PIPE PT ISI- 10 N-12 B 9. 40 g

DRW (ON CROSSOVER) A PIPE - VALVE PT ISI- 10 N-13 8 9. 40

!*N (ON CROSSOVER) A VALVE - PIPE PT 151- 10 N-14 B 9. 21 g

(*N TON CROSSOVERS A P!PE - RED TEE PT l

'%/ 151- 10 N-16 9 9. ?!

,t*N (ON CFOSSOVER) A RED TEE - PIPE PT 151- 10 N-16 B9 40 DHN ION CROSS 0 VERI A P!PE - VALVE PT Page 10

L.

tservice Inspection Plam end Schedule Prairie Islaid Nrclear Ger ting Plant, Unit 1 Third Ten-Year

' ASME See XI Code Ed.1989 fgI ISO: Item ASME eBts

, 7, 'y System Item Description item NumbeE Method & Notes 95 96 9"l l 99 00 02 xx xx xx III- 11A - B- 1 B 7. 50

' 5EAL INJ 140F ' A' 4 ORIFICE BOLTS VT1 ISI* 11A ~ B- 2 B 7. 50 4 ORIFICE BOLTS VT1 S SEAL INJ LOOP 'A'

.351= 11A M* 1

  • F-A VT3 S

SEAL INJ LOOP 'A' RIGID HANGER ISI- 11A H- 2 F-A SEAL INJ LOOP 'A' SPRING HANGER VT3 I ISI- 11A - N* 1 - B 9. 21 S

l SEAL INJ LOOP ' A' PIPE - ELBOW PT ISI- 11A , W- 2 B 9. 21 SEAL INJ LOOP 'A' ELBOW

  • PIPE PT 381- 11A W- 3 B 9. 21 SEAL INJ LOOP 'A' P2PE = REIKICER PT ISI- 11A W- 4 8 9. 21 SEAL INJ LOOP 'A' REDUCER = FIANGE PT -

183- 11A . W- $ B 9, 21 SEAL INJ LOOP 'A' FLANGE - ELBOW PT 151- 11A W- 6 8 9. 21 S  !

SEAL INJ LOOP 'A' ELBOW - P!PE PT 351- 11A W- 7 8 9. 21 SEAL IWJ LOOP 'A' PIPE - ELBOW PT 181- 11A W- 0 8 9, 21 BEAL INJ LOOP 'A' ELBOW - PIPE PT ISI- 11A W* 9 8 9. 21 SEAL INJ LOOP 'A' PIPE - TCC PT ISI- 11A W-10 8 9. 21 SEAL INJ LOOP 'A' TEE - REDUCER PT 151- 11A . W-11 B 9. 21 l S

$EAI. INJ LOOP 'A' TEE - PIPE PT l ISI- 11A W-12 B 9. 21 l 5 W B 9. 21 S

SEAL INJ LOOP 'A' F1ANGE - PIPE PT ISI* 11B H+ 1 F-A S  !

SEAL INJ LOOP 'A' 1ATERAL RESTPAINT YT3 ISI- !!B N- 2 F- A SEAL INJ LOOP 'A' 8PRING/ CLAMP VT3 183- 11B H+ 3 F-A

$EAL INJ LOOP 'A' RESTRAINT / CLAMP VT3 181* 11B H- 4 F-A SEAL INJ LOOP 'A' RUPTURE RESTRAINT VT3 ISI- 11B N- 5 F-A .l S r SEAL INJ LOOP eA' DIGID RESTRAINT VT3 181- 119 W- 1 B 9, 21  !

$EAL 2NJ LOOP 'A' PIPE

  • ELBOW PT - I 181- 11B W- 2 5 9. 21 i 45' ELBOW + PIPE PT l SEALINJLOOP.'){

133- !!B W- 3 8 9. 21 SEAL INJ LOOP 'A' PIPE - ELBOW PT 151- 11B W- 4 B 9. 21 SEAL INJ 16F 'A' f!A0W = PIPE PT 181- lab W- 5 B 9. 21 SEAL IN.I 140P ' A' PIPE - ELBOW PT ISI- 11B W- 5 B 9. 21 EEAL INJ 140P 'A' ELBOW = PIPE PT 351~ llB W- 1 B 9. 40 SEAL INJ LOOP ' A' PIPE - VALVE PT ISI 11B W- O B 9. 40 g

SEAL IN.1 LOOP 'A' VALVE - PIPE PT ISI- att W- 9 8 9. 21 BEAL INJ Lo0P 'A' PIPE = RED TEE PT

!$1- 118. W-10 B 9. Il

$EAL INJ LOOP 'A' RED TEE - PIPE PT ISI- 118 W-11 B 9. 21 SEAL INJ LOOP 'A' P1PE - ELBOW PT 181- 11B W-12 8 9. 21 SEAL INJ LOOP 'A' ELBOW - P2PE 3

PT IS3- its W-13 B 9. 40 '

SEAL INJ LOOP 'A' PIPE - VALVE PT l 253- 119 - W-14 8 9. 40 AEAL INJ LOOP 'A' VALV3 - PIPE PT 231- 119 W-15 9 9. 40 SEAL IWJ LOOP

  • A' P!PE TO TEE PT Page 11

a IIservice Itspection Plan cId Schedule Prtirle Isind Niclear CrarstiIg Plat, U:it 1 -

Third Ten-Year L ASME See XI Code Ed.1989 ISO Item . ASME- Re eats

" k' g _Systemi Item Descriptiorl - Item Number Method & Notes 95 96 97 99 00 02lXX XX XX 151= 118 .

W-16 8 9. 40

$EAL INJ LOOP ' A' RED TEE TO PIPE PT i

181- 11C . H- 1 F-A '

SEAL INJ LOOP 'A' ROD / CLAMP VT3 ISI 11C. H- 2 T-A )

SEAL 2NJ 1.00PA' RfDGID RESTRAINT VT3 .j 181* 11C - H- 3 F-A

$FAL INJ LOOP 'A' ROD CLAMP VT3 151- 11C H4 T-A l SEAL INJ LOOP 'A' SUPPORT RESTRAINT VT3 ,

  1. 181- 11C H- S F-A VT3 0 ,

SEAL INJ LOOP 'A' ANCHOR III- 11C H- 6 F-A 0'

SEAL INJ LOOP ' A' ROD / CLAMP VT3 ISIe 11C H- 7 F- A .

VT1 0

SEAL INJ LOOP 'A' ROD / CLAMP 151- 11C n- 8 F-A SEAL INJ LOOP 'A' ANCHOR VT3 15!= 11C W- 1 B 9. 23

$EAL INJ LOOP 'A' PIPE - ELBOW PT Is!- 11C W- 2 B 9. 21 SEAL INJ LOOP 'A' ELBOW = P!PE PT IS!- 11C W- 3 8 9. 21 SEAL INJ LOOP 'A' P!PE - ELBOW PT IS!- 11C W4 8 9, 21 SEAL INJ LOOP 'A' ELBON - PIPE PT 151- 11C W- S B9 21

$EAL INJ LOOP 'A' PIPE - ELBOW PT 181- 11C W- 6 B 9. 21 SEAL INJ LOOP 'A' ELBOW = PIPE PT ,

P

!$1 11C W- 7 8 9. 21 SEAL INJ LOOP 'A' PIPE - P!PE PT -

A ISI- 11C W- 9 8 9. 21 SEAL INJ LOOP 'A' P!PE - PIPE PT ISI- 11C W- 9 8 9. 21 SEAL INJ LOOP 'A' PIPE - 45' ELBOW PT ISI- 11C W-10 8 9. 21 SEAL IP LOOP 'A' 45' ELBOW = PIPE PT -j 351- 11C W-11 8 9. 21 7

$EAL INJ tsCP~ ~ 'A' PIPE - RED TEE PT  ;

~ '

IS - 11C W-12 8 9. 21

&EAL INJ LOOP 'A' RED TEE - PIPE PT  ;

15I- 11D - B- 1 B 7. 50 SEAL INJ LOOP 'A' FLANGE BOLTS VT1 .L 181- 11D H- 1 F-A S

SEAL INJ LOOP 'A' SPRING SLIDE / CLAMP VT3 r ISI- 11D H. 2 F-A SFAL INJ LOOP 'A' VERTICAL GUIDE VT3 151- 11D H- 3 F-A 0

$EAL INJ LOOP 'A' ANCHOR SUPPORT YT3 ISI- 11D H- 4 F-A SEAL INJ LOOP 'A' ROD CLAMP VT3 ISI- 11D H- 5 F-A 7

SEAL INJ LOOP 'A' R1GID/ BOLT VT3 .

IS!* 11D H- 6 . F-A SEAL INJ LOOP 'A' ROD CLAMP VT3 [

283 11D W. 1 8 9, 21  ;

SF.AL INJ LOOP 'A' VALVE - PIPE PT Is1 11D W- 2 8 9. 21

$EAL INJ LOOP 'A' PIPE - FLANGE PT

!s!- 11D W3 8 9, 21 r SE % IN LOOP 'A' FLANGE

  • P!'E PT Al- 1% W- 4 . B 9. 21 SEAL INJ I40P ' A' PIPE - ELBOW PT ISI- 11D '

W- S - B 9. 21

$EAL INJ LOOP 'A' ELBOF = PIPE PT 181- 11D W- 6 B 9, 21 g

8EAL INJ LOOP 'A' PIPE

  • ELBOW PT 153- 11D W. 1 B 9. 21 I SEAL INJ LOOP 'A' ELBOW - P!PE PT . ';

.153- 18D W4 8 B 9. 21 SEAL 1NJ LOOP *A' a

PIPE - ELBOW PT 131. IID W- 9 8 9. 21 SEAL INJ LOOP *A' ELBOW - PIPE PT '

Page 12

Inservice Irspectioi Plan cd Schedule Peatrie Island Nuclecr G:n:r:ti:g Pir.it, Unit 1 Third Ten-Year ASME Sec XI Code Ed.1989 ISO Item ASME sts v' System Item Description Item Number B 9, 21 Method & Notes 95 96 97 l 99 00l02 XX- xx xx ISI- 11D W-10 P!PE - ELBOW PT SEAL INJ LOOP 'A' 333- IID W-11 B 9. 21 SEAL INJ LOOP 'A' ELBOW - PIPE PT 181+ 11D W-12 B 9. 21

$EAL INJ LOOP 'A' PIPE - ELBOW PT ISI- 110 W-13 B 9, 21 SEAL INJ LOOP 'A' ELBOW - PIPE PT ISI- 110 W-14 8 9. 21 SEAL INJ LOOP 'A' P!PE

  • ELBOW PT 151 11D W-15 B 9. 21 SEAL INJ LOOP 'A' ELBOW = PIPE PT

!$1- 11D W-16 B 9. 21 SEAL INJ 140P 'A' PIPE - PIPE PT ISI- 12A W- 1 B 5. 10 REACTOR COOLANT 'A' NO21LE - BATE END MT UT ISI- 12A W- 2 B 9,11 REACTOR COOLANT 'A' SAFE END - PIPE PT UT

'ISI- 12A W- 3 8 9. 11 Rf. ACTOR COOLANT 'A' PIPE - PIPE PT UT I$1- 12A W- 4 B 9. 11 REACTOR COOLANT 'A' PIPE - RED 40' ELBOW PT UT ISI- 12A W- 5 B 9.11 G g REACTOR COOLANT 'A' RED 40' ELBOW - NLZL PT UT III- 12B H- 1 F-A REACTOR COOLANT 'A' SUPPORT VT3 151- 12B H- 2 F- A REACTOR COOLANT 'A' SUPPORT VT3 ISI- 129 W- 1 E 9. 11 g g REACTOR COOLANT *A' N012LE - 60* ELBOW PT UT ISI- 12B W- 2 B 9, 11 REACTOR COOLANT 'A' 50' ELBOW - PIPE PT UT

[% 151- 123 W- 3 LS 2D B 9.10 PIPE - ELBOW PT UT

( REACTOA COCLANT 'A'

've ISI- 128 W- 4 L52U B 9. 10 PEACTOR COOIANT ' A' ELBOW - P!PE FT UT ISt- 128 W- 5 L3 2D B 9. 10 REAC?OR COOtJu.T ' A' PIPE - ELBOW PT UT ISI- 128 W- 6 L52U B 9. 10 REACTOR COOLANT 'A' ELBOW - PUMP P f UT ISI- 12C W- 1 B 9. 11 REACTOR COOLANT 'A' RC PUMP - PIPE PT UT 151- 12C W- 2 B 9. 11 REACTOR COOLANT 'A' PIPE - FIFE PT UT ISI- 12C W- 3 8 9. 11 REACTOR COOLANT 'A' PIPE - ELBOW PT UT ISt- 12C W- 4 B9 11 REACTOR COOLANT *A' ELBOW - SAFE END PT UT 151- 12C W- 5 B $. 10 REACTOR COOLANT 'A' SAFE END - NOZ2LE MT UT 251- 13A W- 1 B 5. 10 g REACTOR COOLANT 'B' NOZZLE - SAFE END MT UT ISI- 13A W- 2 B 9. 11 PEACTOR COOLANT 'B' $AFE END - PIPE PT UT ISI- 13A W3 B 9, 11 REACTOR COOLANT 'B' PIPE - PIPE PT UT 151- 13A W- 4 B9 11 PEACTOR COOLANT 'B' PIPE - RED 50' ELBOW P1

151- 13A W- 5 B 9. 11 g g REACTOR COOLANT 'B' RED 50' ELBOW-NOZ2LE PT UT 151- 13B H~ l F-A DEACTOR COOLANT 'B' SUPPORT VT3 151- 13B H- 2 F-A REACTOR COOLANT 'B' SUPPORT VT3 ISI- 138 W- 1 B 9. 11 g REACTOR COOLANT 'B' NO21LE - 40' ELBOW MT UT 181* 138 W- 2 B 9. 11

,PEACTOR COOLANT 'B' ELBOW - PIFE PT UT l j ISI- 138 W- 3 LS 2U B 9. 11 g

1

, REACTOR COOLANT *B' PIPE - ELBOW PT UT

% I5I- 138 W- 4 LS 2D B 9. Il PEACTOR COO 1 ANT 'B' ELBOW - PICE PT UT ISI- 13B W- 5 LS 2U B9 11 REACTOR COOLANT *B' PIPE - ELBOW PT UT Page 13

hservice Espection Plan tnd Schedule Pr frie Isl nd N:clecr Grerating PI:nt, Unit 1 Third Ten-Year ASME See XI Code Ed.1989

. f ,.x Relief

/ j ISO Item ASME Requests Schedule (j System Item Description Item Number Method & Notes 95 96 97 l 99 00 02 XX l XX lXX ISI- 139 W 6 L3 2D 8 9. 11 ELBON

!$1- 13C N- 1 8 9. Il g

REACTOR COOLANT 'B' RC PUMP - PIPE PT UT ISI- 13C W- 2 B 9. 11 REACTOR COO 1JLNT *B' PJPE - PIPE PT UT 151- 13C N- 3 B 9. 11 REACTON COOLANT 'B' PIPE - ELBOW 35' PT 117 ISI- 13C W- 4 B 9. 11 REACTOR COOLANT 'B' ELIVW - SATI END PT UT

!$1* 13C N- 5 B 5. 10 g REACTOR COOLANT 'B' SAFE END - NOZZLE MT UT ISI- 14 B- 1 8 6.180 RC PtMP 11 PtMP FLANGE BOLTS UT 15I- 14 B- 2 B 6.190 RC PUMP 11 FLANGE SURFACE VT1 ISI 14 B- 3 57 60 AC PUMP 11 UPPER SEAL HOUSING VT1 i ISI- 14 B- 4 B7 60 RC PtMP 11 LOWER SEAL HOUSING VT1 ISI- 14 H+ 1 F-A & B10. 20 RC PUMP 11  ?!E BACK 9 1 ISI- 14 H- 1A F-A RC PUMP 11 TIE BACK BOLT 9 1 VT3 ISI- 14 H- 1B F-A RC PUMP 11 TIE BACK PIN $ 1 Vf3 ISI- 14 H- 2 F-A & B10. 20 RC PUMP 11 TIE BACK $ 2 ISI- 14 H- 2A F-A RC PUMP 13 TIE BACK BOLT 9 2 VT3 b ISI- 14 H. 28 F-A RC PUMP 11 TIE BACK PIN O 2 VT3 b

( 133- 14 H- 3 F-A & B10. 20

[ RC PUMP 11 TIE BACK f 3

\ 151- 14 H- 3A F- A RC PtMP 11 TIE BACK BOLT 0 3 VT3 ISI- 14 H- 3B F-A RC PUMP 11 TIE BACK PIN 9 3 YT3 ISI- 14 H+ 4 F*A RC PUMP 11 PAD 1 VT3 131- 14 H- 5 F-A RC PUMP 11 PAD 2 VT3 S

ISI- 14 H- 6 F-A RC PUMP 11 PAD 3 VT3 ISI- 14 H+ 7 F-A RC PtMP 11 CONNECTION $ 1 VT3 ISI- 14 H- 7A F-A

,RC PIMP 11 CottMN TOP & PIN 9 1 VT3 ISI- 14 H- 8 F-A JC PUMP 11 _ _ _ .

CONNECTION t 2 VT3 ISI- 14 H- 8A F-A RC PUMP 11 COLUMN TOP & PIN $ 2 VT3 S ISI- 14 H- 9 F-A RC PtMP 11 CONNECTION 9 3 VT3 ISI- 14 H- 9A F-A RC PIMP 11 COLIMN TOP & PIN 0 3 VT3 183- 14 H-10 F-A RC PUMP 11 BASE 9 1 VT3 0 151* 14 H-10A F- A RC PtMP 11 COLUMN BOT & PIN $ 1 VT3 151* 14 H-11 F-A RC PUMP 11 BASE e 2 VT3 b

ISI- 14 H-11A F-A PC PLMP 11 COLUMN BOT & PIN 9 2 VT3 b ISI- 14 H-12 T-A RC PtMP 11 BASE 9 3 VT3 S 151* 14 H-12A F-A RC P'JMP !! COttMN ROT & PIN 0 3 VT3 b

/ 151- 14 P-1 812. 20 7

{ . RC 11 PtMP PtMP INTt'PhALS VT3

\+ 151- 14 PtMP 011 TS 4.2-1 RC PUMP 11 FLYWHEEL PERIPHERY b 151* 14 PUMP fil TS 4.2-1 BC PUMP 11 FLYWHEEL BODY 0 Page 14

a:

hservice Irspection Phn cid Sched le Prr.irie IslaId N clecr Gen:rdi:g Plait, Unit 1 Third Ten-Year ASME See XI Code Ed.1989

,/ \ ISO Item ASME sts g

) system Item Description Item Number Method & Notes 95 96 97 l 99 00 l 02 l XX XX lXX Nd 181- le PUMP 011 T3 4.2-1 KETNAY & BORE b b 8 BC PUMP 11 FLTWHEEL 151- 14 u- 1 B12. 10 PUMP CASEMENT WELD UT S b RC 11 PUMP 153- 17 B- 1 8 7. 70 12* ACCUMULATOR DSCH VEVE BOLTING VT1 ISI- 17 B- 2 B 7. 70 VEVE BOLTING VT1 b

12" ACCUMU1ATOR DSCH III- 17 H+ 1 F-A 12' ACCUMULATOR DSCH ?YDR SNUB %R VT3 I51- 17 H- [ F-A 0

12* ACCUMULATOR DSCH RUPTURE RESTRAINT VT3 ISI- 17 H- 3 F-A & B10. 10 RUPTURE RESTPAINT b

12* ACCLWUIATOR DSCH 281- 17 H- 4 F-A 12' ACCUMULATOR DSCH DOUBLE EPRING MANGER VT3 151 17 V- 1 B12. $0 g 12* ACCUMULATOR DSCH VALVE INT SURFACES VT3 151- 17 V- 2 B12. 50 g (

12* ACCUMULATOR DSCH VAI.VE INT SUFFACES VT3

!$1- 17 N- 1 B 9. 11 12" ACCUMULATOR DSCH VALVE - ELBOW PT UT 181- 17 N- 2 B 9. 11 12" ACCUMULATOR DSCH ELROW - PIPE PT UT ISI- 17 Na 3 59, 11 S

12* ACCUMULATOR DSCH PIPE - ELBON PT UT ISI- 17 W- 4 B 9. 11 h 12* ACCUMUtATOR DSCH ELBOW ~1PE PT UT ISI- 17 W- S B 9.11 12" ACCUMULATOR DSCH PIPE - ELBOW PT UT ISI- 17 N- 6 8 9. 11 12* ACCUMUIATOfi D!1CH ELBOW - RED. TEE PT UT

~

Is!- 17 N- 7 8 9. 11 12" ACCUMU1ATOR DSCH RED. TEE - VALVE PT UT N- 8 8 9. 11 j If!= 17 PT UT 12" ACCUMULATOR DSCH VALVE - ELBOW ISI- 17 N- 9 9 9. Il 12' ACCUMULATOR DSCH ELBOW - PIPE PT UT ISI- 17 u-10 9 9. Il 12* ACCUMULATOR DSCH FIPE - P!PE PT UT ISI- 17 W-11 8 9. 11 12* ACCUMUIATOR DSCH PIPE - ELBOW PT UT 353 11 W-12 ,B 9. 11

- 12" ACCUMULATOR DSCH ELBOW - P!PE PT UT 183- 17 W-13 B 9. 11 12* ACCUMULATOR DSCH _

PlPE - ELBOW PT UT 151- 17 W-14 B 9. 30 12" ACCUMULATOR DSCH ELBDW - NOZZLE  !

151- 17 WM B 9. 31 )

12* ACCUMULATOR DSCH NO21LE TO PIPE PT UT l Ill- 10 B- 1 B 7. 70 10 KHR RETURN LOOP B VALVE BOLTING VT1 l 18J- le H- 1 F-A & B10. 10 RUPTURE RESTRT LUG )

~10 RHR RETURN LCOP B ISI- 10 H+ 2 F- A l I

10 RHB RtTURN LOOP B RESTRAINT VT3 181- 18 H- 3 F-A 10 RHR RETURN LOOP B RIGID RESTRAINT VT3 1 ISI- 19 H- 4 F-A l 10 RHR RETURN LOOT ? RESTRAINT VT3 l

' ISI- 10 H- 5 F-A s Blo. 10 l

10 RHR RETURN LOOP B RUPTURE RESTRT LUG

]

ISI- 14 .-6 F-A 1 DOOLE SPRING BOLT VT3 J

% l,._OkHRREiJRNIAOPB

.I- it H- 7 F-A i su %HR RETURN L 7P B RESTRAINT VT3 ISI- 18 H- 0 F-A 10 RHR RETURN LOOP B SUPPORT BRACKET VT3 151 14 H- 9 F-A g

j g 10 RHP RETURN 140P B SFRING CLAMP VT3

} \s 151- 18 V- 1 B12. 50 g

t. 10 RHR RETURN LOOP B VALVE INT $UFFACES VT3 151- 15 W- 1 8 9. 11 10 RHR RETURN LOOP B VALVE - ELBOW PT UT Page 15 l

I servico I:spectio3 Pla2 c:d SchedIle Pr:Iric IslaId N:cle:r GreratiIg Plait, Unit 1 Third Ten-Year ASME See XI Code Ed.1989 ISO Item ASME "

t' ) q ts

(/ system Item Description Item Number Method & Notes XX XX 95 l 96 l 97 l 99 l 00 l 02 l XX 133- 18 W- 2 B 9. Il 10 kHR RETURN LOOP B ELBOW - PIPE PT UT ISI- 18 W- 3 8 9. 11 10 RHR RETURN LOOP B PIPE

  • ELBOW PT UT Is!- 18 W- 4 8 9. 11 10 PHR RETURN 140P B ELBOW = PIPE PT UT 131 18 W. 6 9 9. 11 10 MHR RETURN LOOP B PIPE - 65' ELBOW PT UT 181- 18 W- 6 B 9. Il 10 94k RETURN LOOP B 65' ELBOW - PIPE Pt UT ISI. 18 W- 7 8 9. 11 10 RHR RETURN LOOP B PIPE - ELBOW PT UT 181- 18 W- 0 B9 11 ELh0W - PIPE PT UT S 10 RNR RETURN 1.00P B 181- 18 W- 9 B 9. 11 10 RHR RETURN LOOP B PIPE - RED TEE PT UT ISI- 19A B- 1 B 7. 70 8" RHR TAKE OFF 'B' VALVE BOLTING VT1 ISI- 19A H. 1 F-A s B10. 10 8' RHR TAKE OFF 'B' RUPTUPE RESTR 2 LUGS b

ISI- 19A H- 2 F-A

$* RHR TAKE OFF 'B' RUPTURE RESTRAINT VT3 ISI- 19A H- 3 F-A 8" RHR TAKE OFF 'B' DOUBLE $NUBBER/ CLAMP VT3 IS!- 19A H+ 4 F- A 8' RHR TAKE OFF 'B' PUPTURE RESTRAINT VT3

~

!$1 19A H- 5 F-A 8' PHR TAME OFF 'B' DEL SPRING / CLAMP VT3 ISI- 19A H- 6 F-A

$* kHR TAKE OFF 'B' RUPTURE RESTRAINT VT3 151 19A H- 7 F-A

$* RHR TAKE OFF 'B' NYDR Sn"5tBER/ CLAMP VT3

  • 131- 19A H+ 8 F-A ,
  • ~

'B' RUPTURE RESTRAI.'T VT3 f RMR TAFE OFF 9 731- 19A H- 9 F- A 8' RHR TAFE OFF 'B' RIGID RESTRAI;.? LUtk VT3 331- 19A H-10 F-A 8' RHR TAKE OFF ~B' RWTURE RESTRAIN' VT3

~

151- 19A H-11 F-A & B10. 10 S

8' RHR TAKE OFF 'B' RUPTURE RESTR 2 LtKS~

152- 19A V- 1 B12. 50 g 8' ShR TAKF OFF 'B' VALVE INT SURFACE? VT3 151- 19A W- 1 B 9. ? !

8' RHR TAKF OFF 'B' VALVE - P!PE PT UT

~

ISI- 19A W- 2 B 9. 11 ,

$* RHR TAFE OFF 'B' P!PE - ELBOW PT UT

.t31- 19A W- 3 8 9. 11 8' PHR TAKE OFF 'B' ELBOW - PIPE PT UT 131- 19A W- 4 9 9. 11 0* RHR TAKE OFF 'B' PIPE - ELBOW PT UT 151- 19A W- S B 9. 11 g 8' RHA TAKE OFF 'B' ELBOW - PtPE PT UT ~g JSI- 19A W- 6 8 9. 11 8" RHR TARE OFF 'B' PIPE - 67' ELBOW PT UT 181- 19A W- 7 5 9. 11 6" RHR TAKE OFF 'B' 67* EIBOM - PIPE PT UT ISI- 19A W- 9 9 9. 11 8_"

RHR TAFE OFF 'B' PIPE - ELBOW PT UT ISI- 19A W- 9 B 9. 11 8' RHR TAKE OFF 'B' ELBOW - PIPE PT UT YIS 19A W-10 9 9. 11 9' RMR TAFE OFF 'B' PIPE - ELBOW PT UT 283- 19A W-ll B 9. 11 ,

8* kHR TAKE OFF 'B' ELBOW - VALVE PT UT 358- 19B B- 1 87 70 t 8' RHR TAKE OFF ' B' _

VALVE BOLTING VT1 151- 19B H- 1 F-A

$* kHR TAKE OFF 'B' RUP'T RESTRAINT VT3 351- 19B H- 2 F-A

[

$* kHR TAKE, OFF ' B' DOUBLE SPRING MANGER VT3 ISI- 19B H- 3 F-A

$* RHR '. .XE OFF ' B' . RUPTURE RESTRA!NT VT3

~ist- 19B H- 4 F-A 8' RHh TAKE OFF 'B' RUP'T RESTRAINT YT3 Page 16

Irservice I:spectioi Pla2 cid Sched:le Prcirle Isla d Nrcle:r G;nerating Plant, Uzit 1 1rhird 1ren-1(car ASME See XI Code Ed.1989

/~T ISO Item ASME Relief Requests Schedule

( ,

Method y/ System Item Description item Number & Notes 95l96 97 l 99 ' 00l02 XXlXX xx Is!- 19B n- 5 r-a 0" RHR T AFE OFF ^ B' SEIS'C RESTRAIKT VT3 ISI- 19B H- 6 F-A & B10. 10 b

8* RHR TAFE OFF 'B' RUP'T RESTRAINT 181 195 V- 1 B12. 50 g 9" RHR TAEE OFF 'B' VALVE INT SURFACES VT3 ISI. 19B W- 1 8 9. 31 8* RRR TAKE OFF 'B' PIPE TO NOZZLE PT UT ISI 19B W- 2 8 9. 11 I" RHR TAME OFF 'B' N023LE - PIPE PT UT ISI- 198 W- 3 8 9. 11 3" RER TAKE OFF 'B' PIPE

  • ELBOW PT UT ISI- 195 W- 4 8 9. 11 B* RHR TAKE OFF 'B' ELBOW - ELBOW PT UT 181= 198 W- 5 B 9.11 0" RHR TAKE OFF 'B' ELBON - PIPE PT UT Is!- IRB W- 6 B 9. 11 0" RHR TAKE OFF 'B' PIPE - ELBOW PT UT 181- 19B N- 7 8 9. 11 9" RER TAKE OFF 'B' ELBON - PIPE PT UT ISI- 199 W- 0 8 9. 11 9" RRR TAKE OFF 'B' PIPE - PIPE PT UT ISI. 19B W- 9 8 9. 11 3" RHR TAKE OFF 'B' P!PE - ELBOW PT UT I5I- 19B N-10 B 9. 11 S* PHR TAKE OFF 'B' ELBOW - PIPE PT UT 181- 19B W-11 B 9. 11

$* RHR TAKE OFF 'B' PIPE - VALVE PT UT ISt- 21 B- 1 B7 SO 3" RfD RETURN LOOP B ORIFICE BOLTS VT1 ISI- 21 H- 1 F-A 3" RfD PETURN LOOP B RUP'T RESTRAIKT VT3

/'~ ISI- 21 H- 2 F-A

< 3" RfD RETURN LOOP B RUP'T RESTRAINT VT3 f j A.,'

s ISI- 21 W- 1 B 9. 21 3" RTD RETURN LOOP B REDUCER - RED TEE PT

!$1- 21 N. 2 8 9. 21 3" RfD RETURN LOOP B RED TEE - PIPE PT 151- 21 W- 3 8 9. 21 3" RTD RETURN LOOP B PIPE - PIFE PT

!$1- 21 u- 4 B 9. 21 3" RTD RETURN LOOP 5 P!PE- FLANGE PT ISI- 21 N- 5 B 9. 21 3" RfD RETURN LOOP B FLANGE - PIPE PT 151- 21 N- 6 B 9. 21 3" RfD RETURN LOOP B P!PE - ELBOW PT ISI- 21 u- 7 8 9. 21 3" RTD RETURN LOOP B ELBOW - PIPE PT 151- 21 u- B B 9. 21 3* RfD RETURN LCOP B PIPE - VALVE PT 151- 21 N- 9 B 9. 21 3" RTD RETURN LOOP B VALVE PIPE PT

!$1 21 W-10 B 9, 21 3" RTD P.ETURN LOOP B PIPE - ELBOW PT 181- 21 W-11 B 9. 21 3" RTD RETURN LOOP B ELBOW - No1ILE PT 151 21 N-12 8 9. 32 3* RTD RETURN LOOP B NOZFLE - PIPE PT isI- 22 u- 1 r-A 3

2" RfD TAKEOFF CLD B RUP'T RESTRAIKT VT3 ISI- 22 H- 2 F-A 2* RfD TAFEOFT CLD B RUP'T RESTRAIKT VT3 15!* 22 H- 3 F-A 2" RfD TAKEOFF CLD B RUP'T RESTRAIKT VT3 151- 22 H- 4 F- A 2" RTD TAKEOFF CLD D NORIZONTAL PE$TRAINT VT3 151- 22 H- 5 F-A g

j ,s 2" RTD TkFEOFF CLD B VT3 ROD CL{MP

[ 1 ISI- 22 N- 1 8 9. 32

\ ,/ 2" RTD TAFEOFF CLD B PIPE - KALF COUPLING PT 1st- 22 W- 2 89 to 2" RTD TAFEOFF CLD B RALF C UPLING - PIPE PT ISI- 22 N- 3 8 9. 21 I" RTD TAKEOFF CLD D PIPE - 45' EIA0W PT Page 17

IIservic3 Inspection Plamd Sched:le l Pr2irie Islind Nrcle2r Gen:ratiIg Plait, Uzit I  !

Third Ten-Year i ASME See XI Code I:d.1989 i

'N Relief Schedule l' l

\

ISO Item ASME RequestB

\ System Item Description Item Number Method & Notes 95 l 96 l 97 l 99 00 l 02 l XX l XX XX ISI- 22 M- 4 B 9. 21 2* PTD TAKEOFF CLD B 46' ELBOW = ELBOW PT 1 ISI- 22 N- 5 B 9. 21 2' PTD TAKEOFF CLD B ELBOW - PIPE PT 151- 22 N- 5 B 9. 21 b

2" RfD TAKIOFF CLD B PIPE - VALVE PT 181- 22 W- T B 9. 21 2" P.TD TAKEOFF CLD B VALVE - PIPE PT ISI- 22 W- e B 9. 21 U

2" PTD TAKEOFF CLD B PT " - VALVE PT Isla 22 W- '9' B 9. 21 2' PTD TAFEOFF CLD B VALIE - PIPE PT ISI- 22 N-1 B 9. 40 2' PTD TAKEOFF CLD 8 FIPs - RTD MAN! FOLD PT ISI- 22 N-11 8 9. 40 2' RfD TAKEOFF CLD B RfD MAN! FOLD - PIPE PT ISI- 22 N-12 B 9. 21 2* RTD TAKEOFF CLD B PIPE - VALVE PT

!$I- 22 W-13 8 9. 21 2" RfD TAKEOFF CLD B VALVE - PIPE PT 151- 2? W-14 B 9. 21 2" RTD TAKEOrF CLD B PIPE - ELBOW PT 151- 22 W-15 B 9. 21 2" BTD TAKEOFF CLD B ELBOW - PIPE PT 151- 22 W-16 8 9. 21 2" PTD TAKEOFF CLD B P!PE - ELBOW Pt 151- 22 W-17 8 9. 21 2* RfD TAKEOFF CLD B ELBOW - PIPE PT 151- 22 N-18 8 9. 21 2' RTD TAKEOFF CLD B PIPE - ELBOW PT ISI- 22 N-19 8 9. 21 2* RTD TAKEOFF CLD B ELBOW - P!PE PT f"N ISI- 22 N-20 8 9. 21

.IPE - ELBOW 2* RTD TAKEOFF CLD B PT f

( ISI- 22 W-C B 9. 21 2" FTD TAKEOFF CLD B ELBOM - I.l i PT 181- 22 W-22 B 9. 21 2" RTD TAKEOFF CLD B PIPE - RED TEE PT 151* 23 H+ 1 F-A 2* PTD TAKEOFF HOT B RUP'T RESTRAINT VT3 151- 23 H- 2 F-A 2' PTD TAKEOFF HOT B RUP'? RESTRAINT VT3 ISI- 23 H- 3 T-A S

2* STD TAKEOFF HOT B RUP'T RESTRAINT VT3 ISI- 23 N- 4 F-A ,

S 2" RfD TAKEOFF HOT B HOR 110NTAL PISTRAINT VT3 ISI- 23 H- 5 F-A 2' BTD TAKEOFF HOT B ROD CLRMP VT3 ISI- 23 W- 3 B 9, 21 4 2* RTD TAKEOFF HOT B REDUCER - CROS$ PT j 151- 23 N- 2 B 9. 21 1 2" RTD TAKEOFF HOT B REDUCER - CROSS PT ISI- 23 W- 3 8 9. 21 i 2' RTD TAKEOFF HOT B REDUCER - CROSS PT 1 ISI- 23 W- 4 B 9. 21 l 2' RTD TAKEOFF HOT B CROSS - ELBOW PT j 151- 23 N- 5 B 9. 21 l 2* RfD TAKEOFF HOT B ELBOW - FIPE PT 351- 23 N- 6 B 9. 21 2* RfD TAKEOFF HOT B PIPE - VALVE PT I 15!* 23 W- 7 B9 21 )

2* RfD TAKEOFF HOT B VALVE - PIPE PT Is1= 23 W- 0 B 9. 21 2" RfD TAKEOFF HOT B PIPE - VALVE PT IS1- 23 N- 9 8 9. 21 2* RTD TAKEOFF HOT B VALVE - PIPE PT i Ist- 23 W-10 B 9. 40 2* PTD TAKEOFF HOT B PIPE - RTD MANIFOLD PT

[ \ ISI- 23 W-11 B 9. 40

) 2* RTD TAFECFF HOT B

$$1- 23 RTD MANIFVLD - PIPE N-12 8 9. 21 PT g

2* PTD TAFEOFF HOT B PIPE - VALVE PT 151= 23 W-13 B 9. 21 2' RTD TAKEOFF HOT B gVALVE - PIPE PT Page 18

Ilservice I spection Plan exd Schedrie Prairie Islard N: clear G:nerati g Plut, Unit 1 Third Ten-Year ASME See XI Code Ed.1989 ISO Item ASMF" Sta

. [Q System Item Description Item Number Method & Notes 95 96 97 99l00 '02lXXlXX XX 381- 23 W-14 B 9. 21 2* PTD TAKEOFF HOT B PIPE - ELBOW PT 151- 23 W-15 B 9. 21 S

2* RfD TAFEOFF HOT B ELBOW - P1PE PT 151- 23 W-16 8 9. 21 2* RfD TAFEOFF HOT B PIPE - ELBOW PT 181- 23 W-17 8 9. 21 2" RfD TAFEOFF HOT B ELBOW - P!PE PT 3 1- 23 W-18 8 9. 21 2" RTD TAKEOFF HOT B PIPE - ELBOW PT 151- 23 W-19 99, 21 2* RfD TAK:OFF HOT B ELBOW - PIPE PT 351- 23 W-20 D 9. 21 PT b

2* RTD TAKICFF HOT B P!PE - ELBOW ISI- 2 a W-21 8 9. 21 2* RfD TAFEOFF HOT B ELBOW - PIPE PT ISI- 23 W-22 8 9. 21 2* PTD TAEEOFF HOT B PIPE - ELBOW PT ISI- 23 W-23 8 9. 21 PT b

2* RTD TAFEOFF HOT B ELBOW - PEDUCER 151- 24 B- 1 97 70 VT1 b

68 818 HIGH HEAD 'B' VALVE BOLTING 151- 24 H+ 1 F-A 2' 818 HIGH HEAD *B' RIGID HANGER VT3 ISI- 24 H- 2 F-A 0

2* SIS HIGH HEAD *B' HYDR $NUBBER/ CLAMP VT3 181- 24 H- 3 F-A 2* SIS HIGH HEAD 'B' HYDR SNUBBER / CLAMP VT3 ISI- 24 V- 1 B12. 50 C 6* S!$ HIGH HEAD 'B' VALVE INT SUFFACEs VT3 181- 24 W- 1 B 9. 21 2* SIS HIGH HEAD 'B' VALVE - PIPE PT 181- 24 W- 2 B 9. 21

[(./])

g 2* $15 HIGH HEAD III- 24

'B' PIPE - TEE W- 3 B 9. 21 PT 2' $15 HIGH HEAD 'B' TEE - REDUCER PT ISI- 24 W- 4 8 9, 21 b

2* 513 HIGH HEAD 'B' TEE - ELBOW PT ISI- 24 W- 5 B 9. 21 2* SIS HIGH HEAD 'B' ELB0W - PIPE PT ISI. 24 W- 6 B9 21 2* SIS HIGH READ *B' PIPE - ELBOW PT 151- 24 W- 1 B 9. 21 2* SIS HIGH HEAD 'B' ELBOW - P!PE PT

!$1- 24 W- O B 9. 21 2* S18 HIGH HEAD 'B' P!PE

  • ELBOW PT ISI- 24 W- 9 8 9. 21 2* SIS HIGH HEAD 'B' ELBOW - PIPE PT ISI- 24 W-10 8 9, 21

.* 818 HIGH HEAD 'B' PIPE - ELBOW PT 8I- 24 W-11 8 9. 21 3 .* SIS HIGH HEAD 'B' ELBOW - PIPE PT i$:- 24 W-12 B 9. 21 2* SIS HIGH HEAD 'B' PIPE - ELBOW PT

( 181- 24 W-13 8 9. 21

~2* SIS HIGH HEAD 'B' ELBOW - PIPE PT t ISI- 24 W-14 8 9. 21 2* tIR HIGH HEAD 'B' PIPE - PIPC PT 181- 24 W-15 B 9. 21 2" $15 HIGH HEAD 'B' PIPE - ELBOW PT 153- 24 W 16 B 9. 21 2' 815 KlGH HEAD *B' ELBOW - REDUCER PT IS.1- 24 W-11 B 9. Il 6" SIS HIGH HEAD 'B' REDUCER - VEVE PT UT 181- 24 W-18 9 9. 11 6* $18 h!GH HEAD *B' VEVE - ELBOW PT UT ISI- 24 W-19 B 9. Il 6* SIS HIGH HEAD 'B' ELBOW - PIPE PT UT 151- 24 W-20 B 9. Il

\\ 6* 518 HIGH HEAD 'B' PIPE - N0ZELE PT UT ISI- 24 W 21 8 9. 31 6* 518 HIGH HEAD 'B' N0ZILE TO PIPE PT UT 151 - 2 b H- 1 F-A 2* CPOSSOVE"a DR *B' SPRING / CLAMP VT3 Page 19

I service lispectio) Plai cxd Schedile Prcirle IslaId N clear GreratiIg Plart, Unit i Third Ten-Year ASME See XI Code Ed.1989

/N Relief ISO Item ASME Requests

[ }

Item Description Item Number Method V System & Notes 95l96 97 99 l 00 l 02 l XX l XX lXX ist- 26 W- 1 B 9. 32 S

2* CROESOVER DR 'B' PIPE TO HALF COUPLNG PT ISI 25 W- 2 8 9. 40 E

2* CROSSOVER DR 'B' HALF COUPLING - PIPE PT ISI- 25 W- 3 8 9. 21 2" CROS5OVER DR 'B' PIPE - ELBOW PT 151- 2S W- 4 8 9. 21 b

2* CROSSOVER DR *B' ELBOW = PIPE PT 183- 25 W- S B 9. 21 2* CROSSOVER DR

  • B' PIPE - ELBOW PT 181- 25 W. 6 9 9. 21 2" CROSSOVER DR 'B' ELBOW - PIPE PT ISI. 25 W- 7 8 9. 21 2" CROSSOVER DR 'B' PIPE a TEE PT ,

i 151- 2S W- 8 8 9. 21 S

2* CROSSOVER DR 'B' TEE - PIPE PT 151- 2S W- 9 9 9. 21 2* CROSSOVER DR 'B' PIPE - VALVE PT IFI- 25 W-10 B 9. 21 2* CROSSOVER E4t 'B' VALVE - PIPE PT ISI- 25 W-11 B 9. 21 2* CROSSOVER DR *B' PIPE - VALVE PT ISI- 26 H- 1 F-A 2* CVC5 LETDOWN 'B' HYDR SNUBBER VT3 ISI- 26 H- 2 F-A 2* CVCS LETDOWN 'B' HYDR SNUHOEA VT3 ISI- 26 H- 3 F-A 2* CVCS LETDOWN 'B' EPRING HANGER / CLAMP VT3

]$1- 26 H- 4 F-A >

2* CVCS LETOCWN 'B' NYDR SNUBBER / CLAMP VT3 151- 26 H- 5 F-A 2* CVCS LETDOWN 'B' t.ATERAL RESTRAINT VT3

'N ISI- 26 H- 6 F-A 0

\ 2" CVCS LETDOWN 'B' SPRING HANGER VT3 ISI- 26 H- 7 F-A 2* CVCS LETDOWN 'B' HYDR SN'JBBEk/ CLAMP VT3 ISI- 26 H- 6 F-A 2" CVC$ LETI G N 'B' HYDR SNUBBER / CLAMP VT3 151- 24 H- 9 F-A 2* CVCS LETDOWN 'B' R!GID MANGER / CLAMP VT3 ISI- 26 H-10 F-A 2" CVCS LETDOWN 'B' RIGID MANGER VT3 ISI- 26 W- 1 B 9. 21 2* CVC$ LETDOWN 'B' TEE - PIPE PT ISI- 26 W- 2 B 9. 21 2" CVC8 LETDOWN 'B' PIPE - VALVE PT 1

i 151+ 26 W- 3 B 9. 21 2* CVCS LETDOWN 'B' VALVE - PIPE PT f 181- 26 W- 4 8 9. 21 I 2* CVCS LETDOWN 'B' PIPE - ELBOW PT 151- 26 W- S B 9. 21 J 2* CVCS LETDOWN 'B' ELBOW - PIPE PT 181- 26 W- 6 B 9. 21 2" CVCS LETDOWN 'B' PIPE - VALVE PT ISI- 26 W- 7 8 9. 21 1 2" CVCS LETDOWN 'B' VALVE - PIPE PT j 15I- 26 W- 0 B 9. 21 l

2" CVCS LETIMN 'B' PIPE - RED TEE PT ISI- 26 W- 9 9 9. 21 2* CVCS LETDOWN 'B' RED TEE - ELBOW PT ISI- 26 W-10 B 9. 21 2* CVCS LETDCWN 'B' ELBOW - PIFE PT l 131- 26 W-il B 9. 21 2* CVCS LETDOWN 'B' PIPE - ELBOW PT 181- 26 W-12 B 9, 21

]

2" CVC8 LETDOWN *B' ELBOW - PIPE PT I 1

Is!- 26 W-13 B 9. 21 2* CVC8 LETDOWN 'B' PIPE - ELBOW 45' PT 151* 26 W-14 B 9. 21 k 2" CVC$ LETDOWN 'B' 4 5' t.LBOW - PIPE PT

\ ISI- 26 W-Ib B 9. 21 2" CVCS LETDOWN *B' PIPE - RED TEE PT ISI- 26 W-16 B 9. 21 2* CVC$ LETDOWN 'B' RED TEE - ELBOW PT Page 20

IIservice IIspection Plaund Schedile Pr:Irie IslaId N cleir G:ner:ti:g Plait, U:it 1 Third Ten-Year ASME See XI Code Ed.1989

/~~N Relief Schedule

( ) ISO Item ASME Requests

() System ISI- 26 Item Description W-17 Item Number 8 9, 21 Method & Notes 95 96 97 99l00 1

02 XX XX XX 28 CVCS LETDOWN 'B' ELBOW - PIPE PT ISI- 26 Wale B 9. 21 2* CVCS LETDOWN 'B' PIPE - ELBOW PT ISI 26 W-19 B 9. 21 2* CVCS LETDOWN 'B' ELBOW

  • PIPE PT 131- 26 W-20 8 9, 21 2* CVCS LETDOWN 'B' PIPE - VALVE PT 153- 27A B- 1 87 50 SEAL INJ LOOP 'B' BOLTS VT1 ISI- 27A B- 2 87 50 S

$EAL INJ LOOP 'B' BOLTS YT1 131- 27A W- 1 8 9. 21 SEAL INJ LOOP 'B' REDUCER - PIPE PT ISI- 27A W2 8 9. 21 SEAL INJ 1.OOP 'B' ELBOW - PIPE PT I$1- 27A W- 3 B 9, 21 SEAL INJ LOOP 'B' PIPE - P!PE PT 151- 27A Wa 4 8 9. 21 SEAL INJ LOOP 'B' PIPE - FLANGE PT ISI- 27A W- 5 B 9. 21 SEAL INJ LOOP 'B' FLANGE - PIPE PT ISI- 27A W- 6 8 9. 21 EEAL INJ LOOP 'B' PIPE - TEE PT ISI- 27A W. 7 8 9. 21 Sf.AL INJ LOOP 'B' TEE - PIPE PT 151- 27A W- 5 8 9, 21

$EAL INJ LOOP 'B' TEE - PIPE PT S

151- 27A W- 9 B 9. 21 EEAL INJ LOOP 'B' PIPE

{ k SEAL INJ LOOP 'B' LATERAL RESTRAINT VT3 Q! 151- 27B SEAL INJ LOOP 'B' H- 2 ANCHOR F-A VT3 ISI- 27B H- 3 F- A RUP'T RESTRAINT S SEAL INJ LOOP 'B' VT3 358- 278 H- 4 P-A SEAL INJ LOOP 'B' RIGID HANGER VT3 ISI- 275 H- 5 F-A SEAL INJ LOOP 'B' HYRD SNUBBER VT3 ISI- 27B W- 1 B 9. 21 SEAL INJ LOOP 'B' PIPE - ELBOW PT 151- 27B W- 2 8 9, 21 SEAL INJ LOOP 'B' CLBOW - PIPE PT 153 278 W- 3 8 9. 21 SEAL INJ LOOP 'B' PIPE - PIPE PT I l

ISI- 27B W- 4 8 9. 21

,$EAL INJ LOOP 'B' PIPE - ELBOW PT ISI- 278 W- 5 5 9. 21 SEAL INJ LOOP 'B' ELBOW - P!PE PT ISI- 27B W. 6 B 9. 21 I SEAL INJ LOOP 'B' P!PE - VALVE PT ISI- 279 W- 7 8 9. 21 SEAL INJ LOOP 'B' YALVE - PIPE PT

!$2= 27B W- 8 8 9, 21 SEAL INJ LOOP 'B' PIPE - TTE PT 181- 278 W- 9 8 9. 21 SEAL INJ LOOP 'B' TEE - PIPE PT l

151- 278 W-10 B 9. 21 EEAL INJ LOOP 'B' PIPE - VALVE PT 151* 27B W-11 B 9. 21 SEAL INJ LOOP 'B' VALVE - PIPE PT

~

ISI- 279 W-12 B 9. 21 SEAL INJ LOOP 'B' PIPE - ELBOW PT 151- 275 W-13 B 9. 21 BEAL INJ LOOP 'B' ELBOW - PIPE PT ISI* 27B W-14 8 9. 21

_ SEAL INJ LOOP 'B' P1PE - REDUCER PT s 151* 27C H- 1 F-A SEAL INJ LOOP 'B' RIGID HANGEA VT3

~iSI*27C H- 2 F-A

_8EAL INJ LOOP 'B' RIGID KANGER VT3 Page 21

Inservice Inspection Plan and Schedule Prairie Island Nuclear Generating Plant, Unit 1 1[hlrd 1ren-)(ear ASME See XI Code Ed.1989 kelief 9 ISO System

!$1- 27C Item Item Description H- 3 ASME Item Number T-A Method Requests

& Notes 95 96 97 Schedule 99l00l02 XX XX XX

$EAL INJ LOOP 'B' AX1AL RESTRAINT VT3

!$1- 27C H- 4 F- A gEAL INJ LOOP 'B' R!GID HANGER VT3 181- 27C N- 1 8 9. 21 SEAL INJ LOOP 'B' P!PE - ELBOW PT 131- 27C u- 2 B 9. 21

$EAL INJ LOOP 'B' ELBOW

  • P!PE PT III. 27C W* 3 8 9. 21 SEAL INJ LOOP 'B' PIPE - TEE PT 15I. 27C W- 4 8 9. 21 SEAL INJ LOOP 'B' TEE - ELBOW PT 151- 27C W- S B 9. 21 SEAL INJ LOOP 'B' ELBOW - REDUCER PT 133- 27c W- 6 B 9. 21

$EAL INJ LOOP 'B' TEE - PIPE PT ISI- 27C W- 7 8 9. 21 SEAL INJ Loor *B' P2PE - ELBCW PT 151- 27C W- 8 8 9. 21 g

8EAL INJ LOOP 'B' ELBOW - PIPE PT ISI- 27C W- 9 B 9, 21 g

SEAL INJ LOOP 'B' PIPE - kEDUCING TEE PT ISI- 27C W-10 8 9. 21 SEAL INJ LOOP 'B' REDUCING TEE - PIPE PT 131 27D B- 1 B7 50

'B' FLANGE BOLT VT1

~ SEAL INJ LOOP Is!- 27D H- 1 F-A SEAL INJ LOOP 'B' PIGID HANGER VT3 ISI- 27D H2 P-A SEAL INJ LOOP 'B' AXIAL SUPPORT VT3 131 27D W- 1 8 9. 40 EEAL INJ LOOP 'B' VALVE - PIPE PT W- 2 B 9. El G

ISI- 27D SEAL INJ LOOP 'B' PIPE - FLANGE PT 152- 27D W- 3 8 9. 21 SEAL INJ LOOP 'B' FLANGE - PIPE PT ISI- 27D W- 4 8 9. 21 SEAL INJ LOOP 'B' PIPE - TEE PT

!$1- 27D W- S B 9, 21 g

SEAL INJ LOOP 'B' TEE - ELBOW PT ISI- 27D N- 6 B9 21 ,

SEAL INJ LOOP 'B' ELBOW - PIPE PT ISI- 27D W- 7 B 9. 21 SEAL INJ LOOP 'B' P!PE - PIPE PT

'~151- 27D W- 0 B 9. 21 SEAL INJ LOCP 'B' PIPE - ELBON PT 151* 27D W- 9 B 9. 21 SEAL INJ LOOP 'B' ELBOW - PIFE PT is! .'7D W-10 8 9. 21 SEAL INJ LOOP 'B' PIPE

  • PIPE PT ISI- 27D u-11 B 9, 21

'B' PIPE - TEE PT

~~ SEAL INJ LOOP 351- 27D W-12 B 9. 21 SEAL INJ LOOP 'B' TEE - ELBOW PT ISI- 27D W-13 B 9. 21 SEAL INJ LOOP 'B' ELBOW - PIPE PT 151- 27D W-13 8 9. 21 SEAL INJ LOOP 'B' ELBOW - PIPE PT 151- 28 N- 1 B 9. 31 10* PRESSURIZER SURG PIPE - NOZZLE PT UT

!$1- 28 N- 2 B 9. 11 10' PRES 3URIZER SURG NO21LE - BEFT PIPE PT UT ISI- 20 W- 3 B 9. 11 10' PRESSURIZER SURG BENT PIPE-BENT PIPE PT UT IS1- 28 N- 4 B 9. '1 10" PRESSURIEER SURG BERT PIPE-BENT PIPE PT UT 151- 20 W- S B 9, 11 10* PRESSURIZER SURG BERT PIPE-BENT PIPE PT UT 9 151- 20 10' PRES $URt1TR $URG 111- PB

_10" FPESSURIZER SURG W- 6 BERT PIPE - PEDUCER W- 7 REDUCER - NOZZLE END 8 9. 11 8 5. 40 PT UT PT UT b

b III. 29A B- 1 B7 50 i FLANCE BOLTING S PPESS 5,AFETY LINE A VT1 l {

Page 22 j

I service I spectio:s Plaicid Schedule Prcirle Isla d N:cle r Grar:.ti g Plant, Unit I Third Ten-Year ASME See XI Code Ed.1989 ISO Item ASME qu ts yr System Item Description Item Number Method & Notes 95l96l97 99 00l02lXX XX XX ISI- 29A V- 1 B12. 50 g PPISS &AFETY LINE A VALVE INT SURFACES VT3 ISI- 29A W- 1 B B. 40 PT UT O

PRESS SAFETY LINE A N0ZELE - SAIT END ISI- 29A W- 2 8 9. 11 S

PRESS SAFETY LINE A SAFE END - 45' ELBOW PT UT ISI 29A M* 3 B 9. 11 E

PRESS SAFETY LINE A 45' ELBOW - PIPE PT UT

'ISI- 29A W- 4 8 9. 11 PRESS SAFETY LINE A PIPE - ELBOW PT Uf IS!- 29A W- S B 9. 11 PRESS SAPETY LINE A ELBOW - ELBOW PT UT ISI- 29A W- 6 89. Il PRESS CAFETY LINE A ELBOW - P!PE PT UT JSI- 29A W- 1 B9 11 PRESS SAFETY LINE A PIPE - ELBOW P* UT 151- asA W. e B 9. 21 F ~'

PRESS SAITTY LINE A ELBOW - ELBOW PT UT _

ISI- 29A W- 9 B 9. 11 PRESS SAFETY LINE A ELBOW - FLANGE PT UT 151- 29B B- 1 B1 50 PRESS SAFETY LINE B FLANGE BOLTING VT1 ISI- 298 V- 1 B12. 50 g PRESS SAFETY L!NE B VALVE INT SUHFACES VT3 +

ISI- 29B W- 1 B 5. 40 PRESS SAfTTY LINE B N0ZELE - SAFE END PT UT ISI- 29B W- 2 B 9. 11 PPE3S SAFETY LINE B SAFE END - 4$* ELBOW PT UT ISI- 298 W- 3 8 9. 11 l PRESS SAIETY LINE B 45' ELBOW - PIPE PT UT IS!- 29B W- 4 8 9. 11 PRESS SAFETY LINE B PIPE - ELBOW PT UT 151- 29B W- 5

[N k PRESS SAf17Y LINE B ELBOW - ELBOW B 9. 11 PT UT l

{

(, ISI- 29B W- 6 8 9. Il PRESS EAFETY LINE B ELBOW - PIPE PT UT ISI- 29B W- 7 8 9. Il PRESS SAFETY LINE B PIPE - ELBOW PT UT )

ISI* 298 W- 8 8 9. 11 I PRESS SAFETY LINE B ELBOW - ELBOW PT UT l ISI- 29B W- 9 8 9. 11 PRESS SAFETY LINE B ELBOW - FIANGE PT UT 151- 30A B- 1 B7 70 j REACTOR VESSc.L SIS A VALVE DOLTING VT1 1 ISI- 30A B- 2 B 7. 10 l REACTOR VESSEL $15 A VALVE BOLTING VT1 ISI- 30A H- 1 F-A HYDR SNUBBER VT3

~ REACTOR VESSEL SIS A 181- 30A H- 2 F-A REACT 0A VESSEL SIS A ROD / C1. AMP VT3 ISI- 30A V. 1 B12. 50 C REACTOR VESSEL SIS A VALVE INT SURFACES VT3 ISI- 30A V- 2 B12. 50 C kEACTOR VESSEL SIS A VALVE INT SURFACES VT3 ISI- 30A W- 1 B 9. 11 ]

REACTOR VESSEL SIS A VALVE - PIPE PT UT  ;

151- 30A W- 2 B 9. 40 l RfACTOR VESSEL SIS A PIPE - VALVE PT 151- 30A W- 3 B9 Il g REACTOR VESSEL 83S A VALVE - ELBOW PT UT 151- 30A W- 4 8 9. Il RF. ACTOR VESSEL SIS A F,LBOW - P!PE PT UT ISI- 3nA W- 5 B 9. Il REACTOR VESSEL $15 A PIPE - PIPE PT UT ISI- 30A W- 6 8 9. 11

_ REACTOR YESSEL SIS A P!PE - RED. ELBOW PT UT 151- 30A W- 7 8 9. 11 REACTOR VESSEL S!$ A kED. ELBOW - PIPE PT UT 151- 3CA W- 0 B 9. 11 i REACTOR VESSEL $18 A PIPE - BENT PIPE PT UT ISI- 30A W- 9 B 5.130 REACTOR VESSEL SIS A BENT PIPE

  • SAFE END PT UT ISI- 30A W-1D 8 3. 90 REACTom VESSEL SIS A gSAIT END - N01 ELE 15 Page 23

IIservice I;spectioi Plam cid Schedtle Prairic Islaid Nrcle:r G=trcti;g Plxt, Unit 1 Third Ten-Year ASME See XI Code Ed.1989

(/ j) ISO Item ASME ts System Item Description Item Number Method & Notes g 95 l 96 l 97 l 99 l 00 l 02 l XX XX XX ISI- JOB 8- 1 8 7. 70 S

REACTOR VESSEL $1$ B VALVE BOLTING YT1 152- 30B B- 2 B 1. 70 REACTOR VESSEL SIS B VALVE BOLTING VT1 b

151- 30B H- 1 F-A VT3 b

REACTOR VES$EL SIS B RUPTURE PESTRAINT 131 30B H. 2 F- A REACTOR VE$$EL SIS B ROD / CLAMP VT3 0

ISI. 30s V- 1 B12. 50 g REACTOR VE3SEL SIS B VALVE INT SURFACES VT3 Is!. 308 V- 2 812, 50 C

PEACTOR VESSEL SIS B VALVE INT SURFACES VT3 153- 308 W- 1 B 9. Il S

REACTOR VESSEL SIS B VALVE - PIPE PT UT ISI- 308 W- 2 B 9. 11 REACTOR VE$SEL 815 B PIPE - VALVE PT UT ISI- 30B W- 3 89, 11 REACTOR VESSEL SIS B Valve - REDUCER PT ITT ISI- 305 W- 4 9 9. 11 REACTOR VESSEL 515 B REDUCER - 23' ELBOW PT UT 251- 308 W- 5 B 9, 11 REACTOR VESSEL $!$ B 23* ELBOW-BENT PIPE PT UT ISI- 30B W- 6 B 5.130 REACTOR VESSEL $18 8 BENT PIPE - SAPI END PT UT III- 30s W. 7 8 3. 90 REACTOR VESSEL SIS B SAFE END - NOZZLE UT

'i'5'I- 31 H- 1 F-A PRE 55URIEFR PELIEF HYDR SNUBBER VT3 ISI- 31 H- 2 F-A S

PRESSURIZER RELIEF kUPTURE RESTRA!NT VT3 IS!- 31 H- 3 F-A ,

PRESSURIZE,R RE LIEF SIRING HANGER VT3 g 151- 31 W- 1 B S. 40 g

, j PRES $URIZER RELIEF NOZZLE - SAFE END PT UT k / ISI+ 31 W- 2 8 9. 21 PRE 550RIEER RELIEF 5AFE-END / REDUCER PT 151- 31 W- 3 B 9. 21 S

PRESSURIZER RELIEF REDUCER - 45' ELBOW PT 151- 31 W- 4 89, 21 PRESSURIZER RELIEF 4 5' ELBOW - PIPE PT 151- 31 W- 5 B 9, 21 PRESSURIEER RELtEF PIPE - ELBOW PT 181- 31 W- 6 9 9, 21 PRES $URIZER RELIEF ELBGW - PIPE PT 151- 31 W- 7 8 9. 21 FRESSURIZER REL!FF PIPE / P!PE PT ISI- 31 W- B B 9. 21 PRESSURIZER RELIEF P!PE - TEE PT I

!$1- 31 W- 9 B 9. 21 PRESSURIZER RELIEF TEE - VALVE PT l 281- 31 W-10 B 9. 21 PRES $URIZER RELIEF VALVE - PIPE PT 151 31 W-11 B 9. 21 PRESSURIZER RELIEF P!PE - VALVE PT 151- 31 W-12 B 9. 21 PRESSURIZER REL!EF TEE - P!PE PT ISI" 31 W-13 B 9. 21 (f)LESSURIZERRELIEF PIPE - ELBOW PT ISI- 31 W-14 B 9. 21

]

PRESSURIZER RELIEF ELBOW - VALVE PT 151- 31 W 15 B 9. 21 yESSURIZERRELIEF VALVE - PIPE PT Ill- 31 W-16 B 9, 21 PRESSURIZER RELIEF P!PE a VALVE PT 151 32A H- 1 F-A g

AUXILIARY SPRAY LUG V73 ISI- 32A H- 2 F-A AUXILIARY SPRAY $UPPORT BRACKET VT3

[ 181- 32A H- 3 F-A l g AL'XILI ARY SPP.AY RUPTURE RESTRAINT VT3 C/ 151- 32A H- 4 F-A AUXILIARY SPRAY LATF.RAL RESTRAINT VT3 25!- 32A W- 1 B 9. 21 AUrtLIARY SPRAY TEE - P!PE PT g _

Page 24

1 IIservice I spection Plat cid SchedIle  !

Prcirle Islaid NIclear G= rating Plant, Unit I l Third Ten-Year  !

ASME Sec XI Code Ed.1989 i ISO Item ASME e

/ Method ts

) System Item Description Item Number & Notes 95~ 96 97l99l00l02 xx lxx lxx  !

151* 32A N- 2 B 9. 21 AUXILIARY $PPAY PIPE - ELBOW PT l 181- 32A W- 3 8 9, 21 .

AUXfLIARY SPRAY ELBOW - PIPE PT ISI* 32A N- 4 8 9. 21 S

AUXILIARY $ PRAY PIPE - VALVE PT

!$1- 32A N- 5 B 9. 21 AUXILIARY SPRAY VALVE - PIPE PT 131* 32A W- 6 B 9. 21 AUXILIARY SPRAY PIPE - VALVE PT

!$1- 32A N- 7 8 9. 21 AUXILIARY SPRAY VALVE - PIPE PT ISI- 32A W- 9 8 9. 21 AUXILIARY EPRAY PIPE - TEE PT

~'ISI- 32A W. 9 8 9. 21 AUX!LIARY $ PRAY TEE - REIRJCER PT 131- 32A W-10 B 9. 21 AUXILIARY SPRAY TEE - PIPE PT ISI 32A W-11 B 9. 21 AUXILIARY SPRAY PIPE - ELBOW PT ISI- 32A W-12 B 9. 21 AUXILIARY SPRAY ELROW - PIPE PT ISI- 328 H-- 1 F-A AUXILIARY SPPAY SPRING & LATEPAL YT3 ISI- 32B H- 2 F- A b

AUXILIARY EPRAY RIGID HANGER VT3 ISI- 32B H* 3 F-A S

AUXILIARY $ PRAY RIDGID HANGER VT3 ISI- 32D N- 1 B 9. 21 AUXILIARY $ PRAY PIPE - ELBOW PT ISI- 32B W- 2 8 9. 21 AUX!LIARY SPRAY ELBOW = PIPE PT 6

g ISI- 32B N- 3 B 9. 21

') AUXILIARY SPRAY PIPE - TEE PT ISI 328 W- 4 9 9. 21 AUXILIARY SPRAY PIDUCER - TEE PT I$1- 328 N- 5 B 9. 21 H g AUXILIARY SPRAY TEE - PIPE PT ISI- 328 W- 6 B 9. 21 H g AUXILIARY SPRAY PIPE - PIPE PT ISI- 32B W- 7 8 9. 21 AUXILIARY SPRAY PIPE - TEE PT ISI 328 W- 8 B 9. 21 AUX 1LIARY $ PRAY TEE - P!PE PT 151- 328 N- 9 8 9. 21 AUXILIARY SPRAY PIPE - 45 ELBOW PT 181- 328 N-10 8 9. 21 AUXILIARY GPRAY 45 ELBOW - PIPE PT j ISI- 328 W-Il B 9. 21 j A1JXILIARY SPRAY PIPE - TEE PT ]

i ISI- 328 W-12 B 9. 21 AUXILIARY SPRAY TEE - PIPE PT 151- 32B N-13 B 9. 21 AUXILIARY SPRAY PIPE - ELBOW PT ISI- 32B N-14 B 9. 21 ELBOW - P1PE PT

_AUXILIAPY SPRAY ISI- 32B W-15 B 9. 40 AUXILIARY SPRAY PIPE - VALVE PT 151- 328 N-16 89, 40 ,

AUXILIARY SPRAY VALVE - PIPE PT ISI- 328 W-17 89 40 l AUXILIARY SPRAY PIPE- VALVE PT 181- 33A W- 1 8 9. 40 LOW HEAD RV INJ 'A' VALVE - PIPE PT ISI- 33A N- 2 B 9. 21 LOW HEAD RV INJ 'A' PIPE - TEE PT 151- 33A W- 3 5 9. 21 LON HEAD RV INJ 'A' TEE = REDUCER PT 151- 33A N- 4 8 9. 21 g LOW HEAD RV INJ 'A' TEE - PIPE PT l ISI- 33A u- S B 9. 21 LOW HEAD RV INJ 'A' PIPE - ELBON PT 151- 33A W- 6 B 9. 21 LOW WEAD RV INJ 'A' ELBOW - PIPE PT Page 25

I: service I:spectioi Plamd Sched:le Pr:Irie Isla d Nuclear Ge:cr;ti:g Platt, Ulit 1 Third Ten-Year ASME See XI Code Ed.1989 FN Relief Schedule

( ) ISO Item ASME Requests

( w/ '

System Item Description Item Number Method & NoteB 95 96 l 97 99 00 XX XX 02lXX IsI- 33A W7 8 9. 21 LOW HEAD RV INJ 'A' PIPE - ELBOW PT ISI- 33A W- 8 8 9. 21 14W HEAD RV INJ ' A' ELBOW - PIPE PT

!st- 33A W- 9 9 9. 21 LOW HEAD RV INJ 'A' PIPE - ELBOW PT 151- 33A W-10 B 9. 21 LOW HEAD PV INJ 'A' ELBOW - PIPE PT 181- 33A W-11 B 9. 40 14W HEAD kV IFJ 'A' PIPE - BOSS PT 181 33A W-12 B 9. 32 PT b

LOW HEAD RV t'lJ 'A' BOSS - PIPE ISI- 339 Ha 1 F-A VT3 b

LUM HEAD RV 'NJ 'B' SPPING HANGER 181- 338 H- 2 F- A 0

LOW HEAD RV 'NJ 'B' 1ATERAL PESTRAINT VT3 ISI- 339 H- 3 F-A

?ON HEAD R*' INJ 'B' HYDR SFUBBER/ CLAMP VT3

!$;- 338 W. 1 8 9. 40 LOW HEAD RV JWJ 'B' VALVE - PIPE PT ISI- 339 W+ 2 8 9. 21 LOW HEAD RV INJ 'B' PIPE - TEE PT ISI- 338 W+ 3 8 9. 21 14W HEAD PV INJ 'B' TEE - PEDUCER PT ISI- 33B W- 4 B 9. 21 LCW HEAD RV INJ 'B' TEE - PIPE PT 151- 338 W- S B 9. 21 14W HEAD RV INJ 'B' PIPE - ELBOW P" ISI- 33B W- 6 8 9. 21 thw HEAD DV INJ 'B' ELBOW - PIPE PT ISI- 338 W- 7 8 9. 21 LOW HEAD RV INJ 'B' PIPE - ELBOW PT

% ISI- 33B W- 8 B 9. 21 LOW HEAD RV INJ 'B' ELBOW - P!PE PT y

( ISI- 338 W- 9 B 9. 21 LOW HEAD RV IHJ 'B' PIPE - ELBOW PT TSI- 33B W-10 8 9. 21 LOW HEAD PV INJ 'B' ELBOW = P!PE PT ISI- 338 W-11 B 9. 40 LOW HEAD RV INJ 'B' PIPE - BOSS PT 151- 339 W-12 B 9. 32 LOW HEAD RV INJ 'B' BOSS - PIPE PT 153* 34 B- 1 B 6.100 RC PUMP 12 PUMP FLANGE BOLT 5 UT 151- 34 B- 2 B 6.190 RC PtNP 12 FLANGE SURFACE VT1 Is!- 34 B- 3 B7 60 S

RC PUMP 12 LOWER SEAL HOUSING VT1 ISI- 34 B- 4 81 60 RC PtHP 12 UPPER $LAL HOUSING VT1 ISI- 34 H- 1 F-A 6 Blo. 20 RC PUMP 12 TIE BACK 91 ISI- 34 H- 1A F-A RC PLMP 12 TIE BACK B3LT 4 1 VT3

!$3- 34 H- IB F-A RC PUMP 12 TIE BACK PIN 91 VT3 181- 34 H- 2 F-A & B10. 20 RC P'JMP 12 TIE BACK $2 ISI- 34 H- 2A F-A g RC PUMP 12 TIE BACK BOLT $ 2 VT3 j ISI- 34 H- 28 F-A RC PUMP 12 TIE BACK PIN $ 2 VT)

ISI- 34 H- 3 F-A & B10. 20 RC PUMP 12 TIE BACK 0 3 151- 34 H- 3A F-A RC PUMP 12 TIE BACK BOLT $3 VT3

!$1- 34 H- 3B F-A g

RC PUMP 12 TIE BACE PIN 93 VT3

% ~il-34 t H- 4 F- A

( BC PUMP 12 PAD 1 VT3 b' I5!- 34 H- 5 F-A

~RC PUMP 12 PAD 2 VT3 181- 34 H- 6 F-A HC PUMP 12 FAD 3 VT3 Page 26

Inservice I spectio2 Plam nTd Sched:le Prcirle Isla:d N: clear Gzrati;g Plant, Ulit 1 Third Ten-Year ASME See XI Code Ed.1989 e.

/ s Relief Schedule i ) ISO Item ASME Requests

(/ System Item Descriptior! Item Number Method & Notes 95l96l97 99 00l02 XX XX XX 151* 34 H- 7 F-A RC PUMP 12 CONNECTION $ 1 VT3 Isla 34 M 7A F-A RC PL9fP 12 COLLHN TOP & PIN 0 1 VT3 181- 34 H. O F-A CONNECTION e 2 VT3 =

b RC PUMP 12

'ISI- 34 H- SA F-A COLUMN TOP & PIN 9 2 VT3 0

RC PUMP 12 131 34 H- 9 F-A S

RC PUMP 12 CONNECTION 9 3 VT3 ISI- 34 H- 9A F- A COLUMN TOP & PIN 4 0 VT3 b

RC PUMP 12 Is!* 34 Halo F-A RC PUMP 12 BASE 9 1 VT3 ISI 34 H-10A F-A COLUMN BOT & PIN 0 1 VT3 0

RC PUMP 12-ISI- 34 H-11 F-A RC rump 12 BASE O 2 VT) b 131- 34 H-11A F-A RC PUMP 12 COLUMN BOT & PIN 9 2 VT3

!$1- 34 H-12 F-A b

RC PUMP 12 BASE $ 3 VT3 ISI- 34 H-12A F-A COLUMN BOT & PIN 9 3 YT3 b

RC PUMP 12 ISI- 34 P-1 812. 20 y RC 12 TUMP PUMP INTERNALS VT3 ISI- 34 PUMP 912 TS 4.2-1 PERIPHERY b

RC PUMP 12 FLYWMEEL ISI- 34 PUMP 912 TS 4.2-1 RC PUMP 12 FLYWHEEL BODY b

ISI- 34 PUMP $12 T3 4.2-1 RC PUMP 12 FLYWHEEL REYNAY & BORE S b b

/'N  !$1- 37 R.V. NUTS 1-16 8 6. 10 f ) REACTOR VESSEL NUTS PT

/ 181- 37 R.V. STUDS 1-16 8 6. 30 g

REACTOR VESSEL STUDS PT UT

!s3- 31 R.V. WSHR5 1-16 8 6. 60 REACTOR VESSEL NASHER5 VT1 ISI- 30 MARMON CLAMP B1 10 S S R.V. CONOSEAL BLTING MARMON CLAMP VT1 ISI- 41 H- 1 F-A & B 8. 20 PRESSURIEER BASE b

151- 41 W- 1 B 2. 12 S

PRESSURIZER VERTICAL SHELL WELD 07 ISI- 41 W- 2 B 2.12 S

PRE 55URIEER VERTICAL SHELL WELD UT ISI- 41 W- 3 B 2.11 S b PRESSUR!EER BOTTOM HEAD / SHELL UT ISI- 41 W- 5 B 2.11 PRESSUR12ER TOP HEAD / SHELL UT S S ISI- 42 B- 1 B 7. 20 PRESSURIZER MANWAY BOLTS VT1 b b b 131* 42 N- 1 IR B 3.320 5 l PRE 55URIEED SURGE NOZZLE UT J 15I- 42 N- 2 1R B 3.120 g PRES 5URIZER SPRAY NOZZLE UT 181- 42 Na 3 IR B 3.120 g j PRESSURIECR RELIEF NOZZLE UT l 151- 42 N- 4A 1R S 3.120 $

PRESSURIZER SAFETY NO2 ELE UT ISI- 42 N- 4B IR B 3.120 g PRESSURIZER SAFETT NOZ2LE UT ISI- 4 3A B- 1 B1 30 j STEAM GENERATOR Gli INLET MANWAY BOLTS VT1 ISI- 43A B- 2 87 30 STEAM GENERATOR #11 OUTLET MANWAY BOLTS VT1 ISI* 43A N- 1 C 2. 21 g

STEAM GENERATOR 811 NOEZLE - SHE!.L MT UT j ISI- 43A N- 1 IR C 2. 22 5

'. , STEAM GENERRTOR 911 NOZZLE INNER RADIUS UT j

V 191- 43A N- 4 C 2. 21 STEAM GENT.RATOR 411 Nota,LE - TOP HEAD MT UT 131- 43A N- 4 IR C 2. 22 $

STEAM GENERATOR 611 NOZ21.E INNER RADIUS UT Page 27

1-Inservice lispectio2 Plan cid Schedale Pr irie Isla:d N:cle:r G=r-ti g Plint, Unit 1 Third Ten-Year ASME See XI Code Ed.1989 ISO ASME * *

/ Item q ts

(  ! System Item Description Item Number Method & Notes 95 96 l 9"l l 99 00l02lXXlXX XX ISI- 43A N- 5 9 3.130 STEAM GENERATOR fil INLET NOZZLE UT S

ISI* 43A N 5 1R B 3.140 5 sTrm GENERATOR ell NOZZLE INNER RADIUS ur 151- 43A N- 6 8 3.130 S

STEAM GENERATOR 811 OUTLET NOZZLE UT ISI- 43A N- 6 1R B 3.140 $

STEAM GENERATOR fil NOZZLE INNER RADIUS UT IS!- 43A WA B 2. 40 STEAM GENERATOR 911 TUBE SMEET / HEAD UT b

151* 43A u- 8 C 1. 30 STEAM GENERATOR 911 TUBESHEET - SHELL UT S

ISI* 43A W- C C 1. 10 STEAM GENEPATOR fil SHELL-CIRCUHFERENTIA UT 181- 43A W- D C 1. 10 STEAM GENERATOR til SHELL-CIRCUMTERENTIA UT 183- 43A u- E C 1. 10 STEAM GENERATOR #11 SHELL - TRANSITION UT 183- 43A W- F C 1. 10 STEAM GENERATOR 811 TRANSITION - SHELL UT 151- 43A h- G C 1. 10 STEAM GENEPATOR #11 SHELL-CIRCUMf1RENTIA UT ISI- 43A W- H C 1. 20 STEAM GENERATOR 811 TOP MEAD - SHELL UT

!!!- 438 B- 1 B1 30 STEAM GENERATOR 412 INLET MANWAY BOLTS VT1 S S ISI- 43B B- 2 B1 30 STEAM GENERATOR 912 OUTLET MANNAY BOLTS VT1 ISI- 43B N- 1 C 2. 21 STEAM GENERATOR 912 NOZZLE - SHELL MT UT IS!- 43B N= 1 IP C 2. 22 g STEAM GENERATOR 512 NOZZEL INNER RADIUS UT e ISI- 43B N- 4 C 2. 21 STEAM GENERATOR 612 NOZZLE - TOP HEAD MT UT ISI- 43B N- 4 1R C 2. 22 $

STEAM GENERATOR #12 NOZZLE INNER RADIUS UT ISI- 438 N- 5 B 3.130 STEAM GENERATOR 812 INLET NOZZLE UT S

ISI- 43B N- 5 IR B 3.140 5 STEAM GENERATOR #12 NOZZLE INNER RADIUS UT ISI- 43B N- 6 B 3.130 STEAM GENERATOR 612 OUTLET NOZZLE UT ISI- 43B H- 6 IR B 3.140 5 STEAM GENERATOR 612 NOZZLE INNER RADIUS UT 153- 438 N- A B 2. 40 STEAM GENERATOR 812 TUBE SHEET / HEAD UT IS!- 43B uB C 1. 30 STEM GENERATOR 812 TUBESHEET

ISI- 438 W- D C 1. 10 l STEAM GENERATOR 812 SHELL-CIRCUHFEPINTIA UT 181- 43B W- E C 1. 10 STEAM GENERATOR 612 SHELL - TRANSITION UT IS1- 43B W. F C 1. 10 STEAM GENERATOR 612 TRANSITION - SHELL g

UT ISI- 43B W- G C 1. 10 STEAM GENERATOR 412 SHELL-CIRCUMFERENTIA UT i 1SI- 439 u- H C 1. 2 0 STEAM GENERATOR #12 TOP HEAD - SHELL UT ISI- 43C H+ 1 F-A STEAM GENERATOR ell SNUBBER VT3 ISI* 43C H- 2 F-A STEAM GENERATOR 911 SNUBBER VT3 ISI- 43C H- 3 F- A STEAM GENERATOR 911 SNUBDER VT3 ISI- 43C H- 4 F-A STEAM GENERATOR #11 $NUBBER VT3

[h iS5A 43C H- 5 T-A

)

STEAM GENERATOR ell l f SPRING VT3 J

k IS!* 4 3C H- 6 F-A STEAM GENERATOR 811 SFRING VT3 i

~531-43C H- 1 F-A STEAM GENERATOR eli PAD VT3 Page 28

Inservice Inspection Plan and Schedule Prairie Island Nuclear Generating Plant, Unit 1 Third Ten-Year ASME See XI Code Ed.1989 Reliet Schedule 9 ISO System 151- 43C STEAM GENEhATOR til Item Item Description H- 0 PAD ASME Item Number F-A Method VT1 Requests

& Notes 95 96 97 l 99 l 00 l 02 l XX l XX lXX 181 43C H- 9 F-A STEAM GENEPATOR 911 TOP SUFFORT GIRDER VT3 181- 43C H-10 F-A STEAM GENERATOR 911 FIXTURE VT3 3 51- 4 3C H-11 F-A STEAM GENERATOR #11 FIXTURE VT3 Is!- 43C H-12 F-A STEAM GENERATOR 911 FIXTURE VT3 151- 43C H-13 F-A STEAM GENERATOR #11 PAD VT3 ISla 4 3C H-14 F-A STEAM GENERATOR Gli PAD VT3 131- 43C H-16 F-A STEAM GENERATOR til PAD VT3 131 43C H-16 F-A STEAM GENERATOR #11 PAD VT3 ISI- 43C H-17 F- A STEAM GENERATOR #11 BUMPER BLOCK VT1 ISI- 43C H-lu F-A STEAM GENF.PATOR #11 BUMPER BLOCK VT3 IS!* 43C H-19 F-A STEAM GENEPATOR ell BUMPER BLOCK VT3 ISI- 43C H-20 F-A STEAM GENDATOR eli BUMPER BLOCK VT3 I5!- 43C H-21 F-A STEAM GENEPATOR 811 TOP CONNECTION 91 VT3 ISI- 43C H-21A F- A STEAM GENERATOR 811 COLUMN TOP & PIN 4 1 VT3 151- 43C H-21B F-A STEAM GENERATOR $11 COLUMN BOT & PIN 9 1 VT3 ISI- 43C N-22 F-A 9 STEAM GENERATOR 811

!$1- 43C STEAM GENERATOR fil ISI- 43C TOP CONNECTION $ 2 H-22A COLUMN TOP & PIN 9 2 H-229 F-A F-A VT3 VT3 STEAM GENERATOR 811 COLUMN BOT 4 PIN 4 2 VT3 151- 43C H-23 F-A STEAM GENERATOR til TOP CONNECTION $ 3 VT3 ISI- 43C H-23A F-A STEAM GENERATOR #11 COLUMN TOP & PIN 0 3 VT3 IEI- 43C H-235 F-A STEAM GENERATOR 911 COLUMN BOT & PIN 0 3 VT3 ISI- 43C H-24 F-A STEAM GENERATOR 811 TOP CONNECTION # 4 VT3 b

JSI- 43C H-24A F-A STEAM GENERATOR 811 COLUMN TOP & PIN 4 4 VT3

!$1- 43C H-24B F- A STEAM GENEPATOR 911 COLUMN BOT & PIN 9 4 VT3 151- 43C H-25 F-A STEAM GENERATOR 511 BASE 9 1 VT3 151 43C H-26 F-A STEAM GENERATOR #11 BASE $ 2 VT3 ISI- 43C H-27 F-A STEAM GENERATOR #11 BASE 9 3 VT)

ISI- 43C H-28 F-A ,

STEAM GENERATOR 911 BASE 9 4 VT3 l ISI- 43D H- 1 F-A STEAM GENERATOR E12 SNUBBER VT3 ISI- 43D H- 2 F-A STEAM GENERATOR 812 $NUBBER VT3

!$1- 43D H- 3 F-A

_ STEAM GENERATOR 512

$NUBBER VT3 ISI- 43D H- 4 F-A STEAM GENERATOR c12 $NUBBER VT3 ist- 43D H- 6 r-a

$ TEAM GENERATOR #12 EPRING VT3 9

ISI- 43D H- 6 F- A STEAM GENTRATOR #12 SPRING VT3 ISI- 43D H- 1 F-A STEAM GENEPATOR 812 PAD S

VT3

!$1- 43D H- 8 F-A STEAM GENERATOR 912 FAD yT3 b Page 29

IIservice I .spection Plaa rnd Schedile Prr.irie Island N:cle:r Gener: ting Plait, Unit i Third Ten-Year ASME See XI Code Ed.1989

![ ]j ' ISO Item ASME *

  • ts System Item Description Item Number Method & Notes 95l96 1 97 l 99 l 00 l 02XX XX XX ISI- 43D H- 9 F- A STEAM GENERATOR 612 TOP SUPPORT GTRDER VT3 b 151 43D H-10 F-A STEAM GENERATOR 812 FIXTUkE VT3 18I- 43D H-11 F-A BTEAM GENERATOR 612 FIXTURE VT3 b ISI- 43D H-12 F-A S

STEAM GENERATOR #12 F1XTURE VT3 ISI- 43D H-13 F-A STEAM GENERATOR 612 PAD ,.

VT3 ISI- 43D H-14 F-A STEAM GENERATOR 512 PAD VT3 b 151- 43D H-15 F-A STEAM GENERATOR 612 PAD VT3 b

IS1- 41D H-16 F- A STEAM GENERATOR 812 PAD VT3 181- 43D H-17 F-A STEAM GENERATOR 912 BUMPER BLOCK VT3 181- 43D H-18 F-A STEAM GENERATOR 812 BUMPER BLOCK VT3 b

!$1- 43D H-19 F- A RTEAM GENERATOR 612 BUMPER BLOCK VT3 b 15I- 43D H-20 F-A STEAM GENERATOR 812 BUMPER ELOCK VT3 131 43D H-21 F- A STEAM GENERATOR #12 TOP CONNECTION 91 VT3 ISI- 43D H-21A F-A STEAM GENERATOR #12 COLUMN TOP & P!N 9 1 VT3 ISI- 43D H-21B F-A STEAM GENERATOR 812 COLUMN BOT & PIN 9 1 VT3 iSI- 43D H-22 F-A ITEAM GENERATOR 912 TOP CONNECTION 4 2 VT3 ISI- 43D N-22A F-A

/m\ STEAM GENERATOR #12 COLUMN TOP & PIN $ 2 VT3 k

\#

) ISI- 43D H-22B F-A 8 TEAM GENERATOR #12 COLUMN BOT s PIN 0 2 VT3 ISI- 43D H-23 F-A STEAM GENERATON 012 TOP CONNECTION 9 3 VT3 ISI- 43D H-23A F-A STEAM GENEPATOR 612 COLUMN TOP & PIN e 3 VT3 ISI- 43D H-23B F-A STEAM GENERATOR 812 COLUMN BOT & PIN 0 3 VT3 151- 43D H-24 F-A BTEAM GENERATOR 912 TOP CONNECTION $ 4 VT3 151- 43D H-24A F-A 8?EAM GENERATOR 612 COLUMN TOP & PIN e 4 VT1 ISI- 43D H-24B F-A STEAM GENERATOR 412 COLUMN BOT & PIN 9 4 VT3 ISI- 4 3D H-25 F-A STEAM GENERATOR 812 BASE O 1 VT3 ISl= 4 3D H-24 F-A STEAM GENERATOR 312 BASE f 2 VT3 ISI- 43D H-27 F-A 87EAM GENERATOR 512 hASE 9 3 VT3 181- 43D H-28 F-A STEAM GENEPATOR 812 BASE O 4 VT3 ISI- 44 H- 1A F- A l REGEN HEAT EXCHANGER FLOOR 5!AND YT3 )

ISI- 44 H- 18 F-A ]

REGEN HEAT EXCHANGER FLOORSTAND VT3 151- 44 N- 1 5 3.150 REGEN HEAT EXCHANGER No11LE - HX UT 151- 44 H- 1 1R B 3.160 5 REGEN HEAT EXCHANGER NOZZLE - HX UT 181- 44 N- 2 B 3.150 g RF. GEN HEAT EXCHANGER NX - NO11LE UT ISI- 44 N- 2 IR B 3.160 5 REGEN HEAT EXCHANGER HX - NOZZLE UT

[

g ,

ISI* 44

, REGEN HEAT EXCRANGER N- 3 No11LE - HX 8 3.150 UT

\j  !$1- 44 N- 3 IR B 3.160 5 REGEW HEAT EXCHANGER NOZILE

!$1- 44 N- 4 8 3.150 PEGEN HEAT EXCMANGER HX - NO1ZLE UT Page 30

I laervice I:spectio2 Pla a cid SchedIIe Prairie Isla:d Nucle:r GIneratirg PI st, U it I Third Ten-Year ASME See XI Code Ed.1989 3 Relief Sehedule

[3

(.s._.,f

}

ISO System Item Item Description ASME Item Number Method Requests 6 Notes 95 96 97 99 00 02lxx xx xx I

151- 44 W- 4 3R B 3.160 $

REGEN NEAT EXCHANGER MX - NO11LE UT ISI- 4a N- 6 9 3.150 NOZZLE - HX UT E

REGEN HEAT EXCHANGER ISI- 44 M- S 2 R B 3.160 3 REGEN HEAT EXCHANGER NOZELE - XX UT ISI- 44 N- 6 B 4. 11 REGEN HEAT EXCHANGER HX - HALF COUPLING VT2 ISI- 44 N- 6 B 3.150 REGEN HEAT EXCHANGER HX- NOZ2LE UT ISI- 44 N-6IR B 3.160 5 REGEN HEAT EXCHANGER HX

  • NOZZLE UT ISI- 44 W- 1 B 2. 50 REGEN HEAT EXCHANGER HEAD - SHELL UT ISI- 44 W- 2 8 2. 50 REGEN HEAT EXCHANGER HEAD - SHELL UT ISI- 44 W- 3 8 2. 50 REGEN HEAT EXCHANGER HEAD - SHELL UT 15!- 44 W- 4 B2 50 REGEN HEAT EXCHANGER HEAD - SHELL UT ISI- 44 W- $ 8 2. 60 REGEN HEAT EXCHANGER HEAD - SHELL UT ISI- 44 W- 6 8 2. 50 kEGEN HEAT EXCHANGER HEAD - SHELL UT

!$1- 44 W- 7 p 9. 21 RECEN HEAT EXCHANGER NOZZLE - PIPE PT ISI- 44 W- 8 8 9. 21 REGEN HEAT EXCHANGER PIPE - NOZZLE PT ISI- 44 W- 9 8 9. 21 REGEN HEAT EXCHANGER NO11LE - PIPE PT ISI- 44 W-10 B 9. 21 REGEN HEAT EXCHANGER PIPE - NO2ZLE PT gs 15I- 46 W. 1 B 9. 31

\ RCS DRAINDOWN PIPE - NOZZLE PT U*

(g ISI- 46 W- 2 B 9. 11 RCS DRAINDOWN NO221.E - P!PE PT UT 181- 46 W- 3 8 9. 11 RCS DRAINDOWN P1PE - REDUCER PT UT ISI- 46 W- 4 5 9. 21 RCS DRAINDOWN REDUCER - ELBOW PT ISI- 46 W- 5 8 9. 21 BCS DRAINDOWN ELBOW - PIPE PT S

ISI- 46 W- 6 3 9. 21 RCS DRAINDOWN PIPE - ELBOW PT ISI 46 W- 1 B 9, 21 RCS DRAINDOWN ELBOW - PIPE PT ISI- 46 W- 8 8 9. 21 RCS DBAINDOWN PIPE - VALVE PT ISI- 46 Wa 9 8 9. 21 RCS DRAINDOWN VALVE - PIPE PT ISI- 46 W-10 B 9, 21 RCS I*AINDOWN PIPE - VALVE PT ISI- 47 W. 1 8 9. 31 PLO-CAP 'B' P!FE - NOZELE PT UT 151- 47 W- 2 B 9. 11 PLO-CAP 'B' NOZZLE - PIPE PT UT ISI- 49 LIGAMENTS 1-46 B 6. 40 REACTOR VESSEL LIGAMENTS UT ISI- 45 W- 1 B 1. 3 0 R.V. RHELL WELDS F1.ANGE / VESSEL UT Isl+ 40 W- 2 B 1. 11 R.V. SHELL WELDS UP SHELL / LOW SHELL UT 181- se W- 3 8 1. Il R.V. SHELL WELDS LOW SHELL (INTER.) UT 151- 40 W- 4 5 1. 11 R.V. SHELL WELDS LOW SHELL / LOW HEAD UT 151- 45 W- 5 B 3, 21 R.V. HEAD WELDS RING / DISC g

UT

/' 151- 49 W- 6 8 1. 40

[ p.V. CICSURE HEAD HEAD + FLANGE g g t

PT UT 151- 50 LUG 9 270" B O. 10 p.V. NOZ2LE ORIEN. SUPPORT LUG MT UT 181- $0 LDG 9 90* B 9. 10 R.V. NOZILE ORIEN. SUPPORT LUG HT UT Page 31

I service Inspection Plamd Schedile Prairie Istard Nucle:r Grc,rati;g Plait, Ulit 1 1rhird 1ren-inear ASME See XI Code Ed.1989

- ' "N. Relief Schedule

[ j ISO Item ASME Requests

( ' System item Description Item Number Method & Notes 95 96 97 99 00 02 XX l XX lXX ISI 50 W- 6 8 3. 90 NOZEEL - VESSEL UT b

R.V. NO22LE ORIEN.

ISI- $0 W- 6 Im B 3.100 NO22LE - VESSEL UT b

R.V. NOZYLE ORIEN.

ISI- SO W- 7 8 3. 90 R.V. NO2 ELE ORIEN. NO2ZLE - VESSEL UT ISI- 50 W- 7 IR B 3.100 R.V. NOZELE ORIEM. NO2 ELE - VESSEL UT

' ISI 60 W- 8 8 3. 90 R.V. NOZELE ORIEN, NOZZLE - VESSEL UT ISI- SO W- 0 1R B 3.100 R.V. NOZ1LE Ok!EN. NOZELE - VESSEL UT ISI- 50 W- 9 8 3. 90 NC12EL - VESSEL S R.V. NO12EL ORIEN. UT 161 50 W- 9 Ik B 3.100 NOZZEL - VESSEL U

R.V. NO12EL ORIEN. UT ISI* SO W-10 B 3. 90 R.V. NOZZEL ORIEW. NOZZEL - VESSEL UT IS!- 50 W-10 IR D 3.100 R.V. NO22EL ORIEN. NOZZEL - VESSEL UT ISI- 50 W-11 B 3. 90 R.V. NOZEEL ORIEN. WOZZEL - VESSEL UT b

ISI- 50 W-11 IR B 3.100 S

R.V. NO2 EEL ORIEN. NOZZEL - VESSEL UT

!$1- $1A H- 1 F-A & C 3. 20 MAIN STEAM 'A' SEISMIC RESTRAINT b

ISI- 51A H- 2 F-A & C 3. 20 S

MAIN STEAM ' A' SEI5MIC RESTRAINT YIk SLA H- 3 F-A & C 3. 20 S

MAIN STEAM 'A' SEISMIC RESTRAINT ISI- SLA H+ 4 F-A & C 3. 20 U

MAIN STEAM 'A' SE!SMIC RESTRAINT f

e** *g 151- SLA H5 F-A & C 3. 20 MAIN STEAM 'A' BEAR'G BRAK ASSY (3)

{ 151ES1A H+ 6 F-A & C 3. 20 N ,,,

MAIN STEAM 'A' BEAR *G BRAK ASSY (31 153- $1A H- 7 F-A & C 3. 20 b

MAIN STEAM 'A' BEAR'G BRAK ASSY (3)

ISI- SIA H- 8 F-A & C 3. 20 MAIN STEAM 'A' ANCHOP. ELBOW (8)

IS!= $1A H+ 9 F-A MAIN STEAM ' A' SIESMIC RESTRAINT VT3 ISt= $1A W- 1 LS 2D C S. 50 S

MAIN STEAM 'A' NOZZLE - RED. ELBOW MT UT

"~

ISI- SIA W- 2 LS 2U D C S. 50 MAIN STEAM 'A' RED. ELBOW

~ MAIN STEAM

'A' 45' ELBOW - PIPE MT UT 151- SLA W-11 LS UD C S. 50 MAIN STEAM 'A' PIPE - PIPE PT UT ISI- stb H- 1 F-A & C 3. 20 MAIN STEAM 'A' BEAR'G DhAX ASSY ISI- $1B H* 2 F-A MAIN STEAM 'A' RESTRAINT VT3 181- SIB H- 3 F- A t MAIN STEAM 'A' SPRING MANGER VT3 IS!- SIB H- 4 F-A MAIN STEAM 'A' RIDGID SUPPDRT VT3 783- SIB W- 1 LS UD C S. 50 & HELB MAIN STEAM 'A' PIPE - PIPE Page 32

l I: service I:spectio2 Plamd Sched11e i Prcirle Isla:d Nrclesr G ner:tirg P1nt, Uait 1 Third Ten-Year ASME Sec XI Code Ed.1989 gg Relief Schedule

+ >

ISO Item ASME Requests (J/ .

System 333- $1B item Description W- 2 LS 2U2D item Number C S. 50 Method & Notes 95 96 97 f 99l00 02 XXfXX XX

)

MAIN STEAM 'A' PIPE - 58' elbow PT UT l

151- SIB W- 3 LS D2U C S. SO ,

1 MAIN STEAM 'A* $8' ELBON - PIPE HT UT Is!- $13 W- 4 LS 2D U C S. 50 g MAIN STEAM 'A' PIPE - TEE PT UT 131- 513 W- S LS 2U2D C 5. 50 g MAIN STEAM 'A' RED. TEE - 4S' ELBOW MT UT j ISI- stb N- 6 f.S D 20 C S. SO i S

MAIN STEAM 'A' 45* E1AON - PIPE MT UT ISI S1B W- 7 L3 U C 5. 50 MAIN STEAM 'A' P!PE - VALVE MT UT 153- $18 W- O C S. 21 MAIN STEAM 'A' VALVE - VALVE MT UT ISI- SIC Na 1- F-A a C 3. 20 MAIN STEAM 'A' SUPPORT BRAK AS5T ISI- SIC H- 2 F*A MAIN STEAM 'A' DOUBLE SNUBBER VT3 153- SIC H- 3 F- A VT3 b

MAIN STF.AM 'A' CONST SUPPORT ISI- SIC W- 1 LS UD C S. 50 3 MAIN STEAM 'A' TEE - P2PE MT UT 151- $1C W- 2 LS D C 5, 80 g MAIN STEAM 'A' PIPE - SWEEPOLET PT ISI- SIC W- 3 C S. 51 g MAIN STEAM 'A' SWEEPOLET - PIPE MT UT ISl* SIC W- 4 C S. 51 MAIN STEAM 'A' PIPE - ELBOW PT UT ISI- $1C u- S C S. 51 NAIN STEAM 'A' ELBOW - VALVE MT UT I5I- SIC W- 6 C S. 51 MAIN STEAM 'A' VALVE - REDUCER MT UT g ISI- SIC N- T C S. 51 p MAIN STEAM 'A' REDUCER - VALVE MT UT

( 151- SIC MAIN STEAM 'A' N* 8 LS UD PIPE - TEE C 5. 50 PT UT g

181- SIC W- 9 LS U C S. 80 g MAIN STEAM 'A' PIPE-fl.ANGED N0ZZLE PT

'is!-$1C N-10 1.5 UD C 5. 50 MAIN STLAM 'A' TEE - P!PE MT UT ISI- Sic W-11 C S. 80 MAIN STEAM 'A' PIPE-FLANGED NCZZLE PT 181- Sic W-12 C 5. 80

'A' PIPE - FLANGE PT

~ MAIN STEAM 151- 51C M-1314i U C 5. S0 MAIN STEAM 'A' PIPE - CAP PT UT Is!- $1C W-14 L3 UD C S. 60 ]

MAIN STEAM 'A' TEE - PIPE MT UT 1 ISI- Sic W-15 C S. 80 MAIN STEAM 'A' PIPE-FLANGED N0ZELE PT 18I- SIC W-16 C S. 80 MAIN STEAM 'A' PIPE-FLANGED NO2 ELE PT 151- SIC W-17 13 U C S. 50 MAIN STEAM 'A' P!PE - CAP PT UT ISI- SIC N-18 L3 U C S. 80 MAIN STEAM 'A' P!PE - NELDOLET PT 151- $1C W-19 C S. 51 MAIN 8?EAM 'A' WFLDOLET - REDUCER MT UT 151- 52 H- 1 F-A s C 3. 20 FEEIWATER LOOP 'A' SIESMIC RESTRAINT 2BI- $2 H- 2 F-A a C J. 20 TIEDWATER LOOP 'A' SE!SMIC RE5TRAINT ISI- 62 H- 3 F-A FEEI*ATER LOOP 'A' ANCMOR SUPPORT VT3 3 1- $2 Ha 4 F-A a C 3. 20 J FEEDWATER LOOP 'A' ANCHOR ELBON 181* $2 H- 5 F-A & C 3. 20 FEEINATER LOOP ' A' PESTP.AINT 181- $2 Ha 6 F-A & C 3. 70 TEEIWATER LOOP ' A' ANCHOR elbow 181= 52 H- 7 F-A IT.EI*ATER LOOP 'A' BEAA'G BRAK ASST VT3 ISI- 62 H- 8 F-A a C 3. 20 FTE!*ATER LOOP 'A' ANCHOR ELBON Page 33

l l

1: service Itspectio2 Plaund Schedule I

Przirie Isla;d N; clear Gener;ti g Plait, Unit i Third Ten-Year ASME See XI Code Ed.19P9 f ISO Item ASME q ts 1 System Item Description Item Number Method & Notes 95 96 97 l 99 00 02 XX XX XX ISI- 52 Ha 9 F-A PTEI*ATER LOOP ' A' ANCHOR ELBOW vt3 0 ISI* 53 H-10 F-A & C 3. 20 ANCHOR ELBOW O

FEEDWATER LOOP 'A' ,

ISI- 52 W- 1 C 5. 51 6 HEL8 VALVE - PIPE S FEEDWATER LOOP 'A' 131 52 W- 2 C 5. 51 & HELB PIPE - ELBOW b

f1EDWATER LOOP 'A' ISI- 52 W- 3 C 5. 51 4 HELB ELBOW - PIPE 'O FEEIWATER LOOP ' A' ISI- 52 W- 4 C 5. 51 FIElmATER LOOP 'A' PIPE - PENETS;ATION MT UT I5I- 52 W- 5 C 5. 21 f1EImATER LOOP 'A' PENETRATION - PIPE MT UT 151- 52 W- 6 C 5. 21 FEEIMATER LOOP 'A' P!PE - ELBOW MT UT t 181- 52 W- T C 5. 21 FEE!*ATER LOOP 'A' ELBOW - PIPE MT UT

!$1- 52 W- 9 C 5. 51 FEE!*ATER LOOP 'A' PIPE - PIPE MT UT 151- 52 W- 9 C b. 51 FEET *ATER LOOP 'A' PIPE - ELBOW HT UT ISI- 52 W-10 C 5. 51 ftErmATER LOOP 'A' ELBOW - PIPE MT UT ISI- 52 W-11 C 5. 51 fTEDWATER LOOP ' A' PIPE - ELBOW MT UT ISI- 52 W-12 C 5. 51 FEEDWATER LOOP 'A' ELBOW - PIPE MT UT 151- 52 W-13 C 5. El FEEIMATER LOOF 'A' PIPE - ELBOW MT UT

!$1- 52 Walt C5 51 FEElmATER LOOP 'A' ELBOW - PIPE MT UT Is!- 52 W-15 C 5. 51

[

FCEIMATER Loop ' A' PIPE - ELB0W MT UT '

k 333- 52 W-16 C 5. 51 s

% FEEDWATER LOOP 'A' ELBOW = PIPE MT UT 151- 52 W-17 C 5. 51 FEEDWATER LOOP 'A' PIPE - ELBOW MT UT ISI- 52 W-18 C 5. 51 FEET *ATER LOOP ' A' ELBOW = PIPE MT UT ISI 52 W-19 C 5. 51 FEEDWATER LOOP 'A' PIPE - VALVE MT UT 151- 52 W-20 C 5. 51 FIEtmATER LOOP 'A' VALVE - E180W MT UT 151- 52 W-21 C 5. 51 FEElmATER LOOP 'A' ELBOW - PIPE MT UT j 151- 52 W-22 C 5. 51 ITE[ MATER LOOP 'A' PIPE - PEDUCER MT UT 151- 52 W-23 C 5. 51 FEEtmATER LOOP 'A' REDUCER - NOZILE MT UT I 181- 52 W-24 C 5. 51 l ITEImATER loop 'A' REDUCER - PIPE MT UT ISI- 52 W-25 C 5. 51 j PIEtmATER 1DOP 'A' PIPE - SWEEPOLET MT UT 1 ISI 52 W-26 C5 51 l FEEtmATER LOOP 'A' $NEEPOLET - PIPE MT UT ISI- $3A M* 1 F-A RHR SUCTION PUMP ANCHOR SUPP0HT VT3 ISI- 53A W- 1 C 5. 11 RHR SUCTION PUMP VALVE - REDUCER PT UT ISI- 53A W- 2 LS D C X . XX l kHR SUCTION PUMP REDUCER - ELBOW 151- 53A W- 3 L3 UD XX RHR $UCTION PUMP ELBOW - TEE ,

ISI 53A W- 4 C 5. 11 RHR SUCTION PUMP VALVE - REDUCER PT UT 1 I&a- 53A W- 5 L8 D C X. XX kHR SUCTION PUMP REDUCER - ELBOW

(% ISI- 53A W- 5 C 1. XX RHR SUCTION PUMP ELBOW - TEE f l

\ / ISI* 53A W- 7 LS UD C X, XX '

kHR SUCTION PUMP TEE - WELDOLET 151- 5)A W- 0 LS UD C X. XX RRR SUCT!ON PUMP TEE - 4 5' ELBOW Page 34

1: service Iispectio: Plas cid Sched:le Prairie Islaid N:cle:r Genr tirg Pint, Unit 1 Third Ten-Year ASME See XI Code Ed.1989

['i ISO Item ASME r Method sts

( System Item Description Item Number & Notes 95 96l97 '99 00l02 XX XX xx Ig!- 53A N- 9 LS U C X. XX PHR SUCTION PWP 45' EL30W - P!PE 181 03B N- 1 P-A SEISMIC RESTRAINT VT3 b RHR SUCTION PtMP 181- 538 N- 1 C 5. 51 S

RHR KUCTION PUMP PIPE - P!PE PT UT 133- 53B W- 2 LS U C X. XX PHR SUCTION PUMP PIPE - ELBOW 151- 53B W- 3 LS U C X. XX RHR SUCTION PUMP ELBOW - PIPE ISI- $3B W- 4 LS D C X. XX RHR $UCTION PUMP PIPE - ELBON ISI- 538 W- 5 LS U C X. XX RHR SUCTION PUMP ELBOW - PIPE ISI- 53B W- 6 C X. XX RHR SUCTION PUMP PIPE - PIPE ISI- 53B W- T IJ D C X. XX RNA $UCTION PUMP PIPE - ELBON ISI- 53B N- 0 LS D C X. XX RHR SUCTION PUMP ELBON - PIPE 231- 53B W- 9 C X. XX RHR SUCTION PUMP PIPE - PIPE ISI- 53B W-10 C X. XX RHR SUCTION PUMP PIPE - PIPE ISI- 539 N-11 L5 D C X. XX RHR SUCTION PUMP PIPE - REDUCING TEE

!$1- 53B W-12 L5 UD C X. XX RHR SUCTION PUMP RED. TEE - REDUCER ISI- 53B W-13 L8 D C X. XX RHR SUCTION PUMP REDUCING TEE

  • PIPE ISI- 53B W-14 C X. XX f

RRR $UCTION PUMP PIPE - PIPE  ?

ISI- 53B w-15 LS D C X . XX

/ RHR SUCTION PtNP PIPE - ELBON 7

i 3SI- 538 N-16 L8 D C X. XX RHA $UCTION PUMP ELBOW - PIPE 151- 538 W-17 L8 D C X . XX RdR SUCTION PtMP PIPE - ELBOW ISI- 53B N-18 L8 0 C X. XX RHR SUCTION PUMP ELBOW - PIPE 151- 538 W-19 C X. XX RHR SUCTION PUMP PIPE - VALVE 153- $3C H- 1 P-A RHR $UCTION PUMP 'A' ANCHOR ($TRUT) VT3 0

'Is!- 53C H- 2 P-A RHR BUCTION PUMP 'A' $PRING HANGER / CLAMP VT3 151- 53C H+ 3 P-A RHR SUCTION PUMP 'A' SNUBBER /CLRMP VT3 151- 53C H- 4 P-A RHR SUCTION PUMP 'A' SEISMIC RESTPAINT VT3 ISI- 53C H- 5 P-A RHR SUCTION PUMP 'A' RHR PUMP 'A' BASE VT3 181- 53C W- 1 C X . XX RHR SUCTION PUMP 'A' VALVE - VALVE 251- 53C W- 2 LS U C X. XX RHR SUCTION PUMP A' VALVE - ELBOW 181- 53C W- 3 L5 D C X. XX RHR SUCTION PUMP 'A' ELBOW - REDUCER ISI- 53C N- 4 L8 UD C 5.10 RHR SUCTION PtHP 'A' REDUCER - RED. TEE PT UT 151* 53C N- 5 L3 UD C 5. 10 RHR SUCTION PtMP 'A' REDUCING TEE *.PE PT UT

!$1* 53C W- 6 LS UD C 5. 10 RHR SUCTION PUMP 'A PIPE - G PT UT ISI- 53C N- 7 J UD C 5.10 RNR SUCTION PUMP 'A' TEP - PIPE PT UT 381= 53C h- 0 LS UD C 5. 10 RHR SUCTION PUMP ' A' PIPE - ELBON PT UT fs 181- 53C W- D LS UD C 5,10

. RHR $UCTION PtMP ' A' ELBOW = PIPE PT UT

{

( ISI- 53C N-10 LS UD C 5. 10 '

RHR SUCTION PUMP ' A' PIPE - ELBOW PT UT

!$1- 53C W-11 LS UD C 5. 10 RHR SIM' TION PUMP ' A' ELBOW - PIPE PT UT Page 35

I service I spectio2 Plan cid Schedule Prairie Islaid Niclear Grratirg Plait, Unit 1 Third Ten-Year ASME Sec XI Code Ed.1989 7' Relief ISO Item ASME Schedul*

l j Requests (j System Item Description Item Number Method s Notes 95l96l97 99l00 02 XX XX XX 151- $3C W-12 LS U C S. 10 RHR SUCTION PUMP 'A' PIPE - FLANGE PT UT ISI- 53C N-13 L5 U C 5. 10 RHR SUCTION PtMP 'A' FLANGE - PIPE PT UT ISI- 53C N-14 LS D C 5. 10 RHR SUCTION PIMP 'A' PIPE - FIANGE PT UT ISI- 53C W-IS La D C S. 10 BHR SUCTIOH PUMP 'A' FLANGE - REDUCER PT UT 15I- $3C W-16 LS U C X XX RHR SUCTION PUMP 'A' REDUCER - PUMP 'A' ISI- 53D H~ 1 F-A PHR SUCTION '8' ANCHOR VT3 ISI- S3D H- 2 F-A RMR SUCTION 'B' DOUBLE SPRING DASE VT3 b

ISI- 53D H- 3 F- A kHR SUCTION 'B' SNUBBER VT3 0 ISI- S3D H- 4 F-A RHR SUCTION 'B' RESTRAINT VT3 ISI* S3D H- 5 F-A RHR SUCTION *B' RHR PUMP 'B' BASE VT3 ISI- 53D W- 1 LS UD C X. XX RHR SUCTION 'B' REDUCER - PIPE ISI- 53D W- 2 L5 D C X. XX BHR SUCTION 'B' PIPE - ELBOW 151- S3D W- 3 LS U C X. XX RHR SUCTION 'B' ELBOW - VALVE ISI- S3D N- 4 C X. XX RHR SUCTION *B' VALVE - VALVE

!$I- S3D W- 5 C X. XX RHR SUCTION 'B' VALVE

  • PIPE ISI- S3D N- 6 LS D C X. XX RER SUCTION 'B' PIPE - ELBOW W- 7 LS U 7'N ISI- $3D RER $UCTION 'B' FLBON - REDUCEP C X. XX

{

\d J ISI- 53D W- 0 L3 D C S. 10 RHR, SUCTION 'B' RF.DUCER - TEE PT UT 151- S3D W- 9 LS UD C 5. 10 RHR SUCTION 'B' REDUCING TEE - PIPE PT UT ISI- 53D N-10 LS UD C S. 10 ,

RNR SUCTION *B' i

PIPE - TEE PT UT 151- S3D N-11 LS UD C S. 10 RHR SUCTION 'B' TEE - PIPE PT UT ISI- 51D W-12 LS UD C 5. 10 RHR $UCTION 'B' PIPE - ELBOW PT UT ISI- 53D N-15 LS UD C S. 10 RHR SUCTION 'B' ELBOW - PIPE PT UT ISI- 53D W-16 LS U C S. 10 ,

RHR SUCTION *B' PIPE - FLANGE PT UT

)

153 53D N-17 LS D C S. 10 l RHR SUCTION *B' FLANGE - PIPE PT UT j 151- $3D W-19 LS U C 5. 10 l

__RHR SUCTION 'B' PIPE - F1ANGE PT UT 181- 53D N-19 LS D C S. 10 g ]

RHR SUCTION 'B' FLANGE - kEDUCER PT UT ISI- $3D W-20 L5 U C X. XX RHR $UCTION 'B' REDUCLR - PUMP 'B' I5I- SSA - W- 1 L8 D C X. XX RHR PUMP 'A' DISCH NOZELE = REDUCER

!$1- SSA N- 2 LS D C X. XX hMR PIMP "A* DISCH REDUCER - VALVE ISI- SSA N- 3 C X. XX l RitR PUMP 'A" DISCH VALVE - PtPE )

181- SSA W- 4 C X. XX l RHR PtHP 'A" DISCH PIPE - WELDOLET 551- SSA N. S C X. XX RHR PUMP 'A' DI$CH PIPE - VALVE ISI- SSA w- 6 C X. XX RHR PUMP 'A" DIECH VALVE - PIPE

}*

151- 55A RHR PtHP "A" DISCH W- 1 L3 U PIPE - TEE C X. XX j

ISI- SSA N- 9,LS U C X. XX

_RNR PUMP "A" DISCH TEE - PIPE ISI- BSA N- 9 LS U C N. XX RHR PtHP 'A' DISCH P!PE - ELBON Page 36

IIservice I;spection Plai rad Sched:le Prairie Isla d NIcle:r G= rating Platt, Unit 1 Third Ten-Year ASME See XI Code Ed.1989

,g Relief Schedule ISO Item ASME

()

j g Requests System Item Description Item Number Method & Notes 95 f96 l 97 99 l 00 l 02 l XX l XXXX v

ISI SSA W-10 LS U C X , XX pHR PUMP 'A" DISCH ELBOW - VALVE ISI- 6LA W-11 LS U C X. XX SHR PtMP 'A* DISCH TEE - VALVE ISI- SSA N-12 LS U C X. XX RHR PtMP "A" DISCH VALVE - ELBOW ~

ISI- 55A W-13 LS D C X. XX RHR PUMP 'A" DISCH ELBOW - P!PE ISI- $5A W-14 LS U C X. XX y RHR PtMP "A" DISCH PIPE - 45* ELBOW 181- SSA W-15 LS U C X. XX X RHR PUMP "A* DISCH 45' ELBOW - PIPE 151- $$A W-16 C 2. 31 RHR PtMP *A" DISCH PIPE - HEAT EXCHANGE PT ISI- $5B W- 1 C 2. 31 "A" DISCH HEAT EXCHANGE - PIPE PT 0

RHR PUMP ISI- SSB W- 2 LS U C X. XX RHR PUMP *A" DISCH P1PE - ELBOW 158- SSB W- 3 LS D C X. XX RHR PUMP "A" DISCN ELBOW - PIPE ISI- 55B W- 4 C X. XX RHP PUMP *A' DISCM PIPE - PIPE 181 $5B W- 5 LS U C X. XX RHR PUMP ' A" DISCH PIPE - ELBOW ISI- SSB W- 6 LS U C X. XX RHR PUMP *A" DISCH ELBOW - P!PE 151- $5B W- 7 LS U C X, XX PHR PUMP *A" DISCH PIPE - ELBOW ISI. $5B W- 0 LS UD C X. XX RHR PtMP 'A" DISCH ELBOW - ELBCW ISI- SSB W- 9 C X. XX PHR PIMP 'A" DISCH ELBOW - RED TEE 251- SSB W-10 LS D C X. XX

/ t RHR PtMP *A" DISCH RED TEE - FLANGE I, f 15!- LLB W-11 C X. XX j RHR PUMP *A" DISCH FLANGE - VALVE ISI- 558 W-12 C X. XX PHR PUMP *A* DISCH VALVE - P!PE ISI- 558 W-13 LS U C X, XX PHR PVMP "A" DISCH PIPE - TEE 151- 55B W-14 LS D C X. XX RHR PUMP *A" DISCH TEE - REDUCER ISI- 55B W-15 LS D C X. XX ,

RHR PUMP 'A" DISCH TEE - P!PE ISI- SSB W-16 LS U C X, XX

~RHR PIMP

'A' DISCH PIPE - ELBOW 151- 55B W-17 LS UD C X. XX RHR PtMP "A" DISrH ELBOW - ELBOW ISI. 558 W-18 LS D C X . XX

_ RHR PUMP 'A' DISCH ELBOW - PIPE 151- SSB W-19 LS D C X. XX RHR PUMP *A* DISCH PIPE - ELBOW ISI- SSB W-20 LS U C X. XX RHR PtMP *A* DISCH ELBOW - PIPE ISI- 55B W-21 LS U C X. XX DHR PUMP "A" DISCH PIPE - ELBOW ISI- 558 W-22 LS U C X, XX RHR PUMP *A* DISCH ELBOW - VALVE ISI- 65C W- 1 LS D C X. XX RHR PtMP 'B' DISCH PUMP - REDUCER ISI- 55C W. 2 LS D C X. XX RHR PtMP 'B' DISCH REDUCER - VALVE 181- $ 5C W- 3 C X. XX RHR PLMP 'B' DISCH VALVE - PIPE Isl= $5C W- 4 C X. XX RHR PLMP 'B' DISCH PIPE - WELDOLET 181- 55C W- S C X, XX kHR PUMP 'B' DisCH P!PE - VA!NE

"% ISI- 55C W- 6 LS U C X. XX

) RHR PUMP 'B' DISCH VALVE - PIPE (j 151 SSC W- 7 LS D C X. XX RHR PLMP 'B' DISCH PIPE - TEE ISI- SSC W- 0 LS U C X. XX RHR PUMP 'B' DISCH TEE- PIPE Page 3'l

. . . .. -. . .- . .- - -- - - . _ - ~ . ,

i

, i

-Inservice IIspection Plam cid Schedule 1 Pr:frie Ishid Nxcle r G n:r ting Phat, Uzit 1 Third Ten-Year ASME See XI Code Ed.1989 ,

Relief '

-'[h j ISO Item ASME Requests Schedule '

(

System Item DescEiption Item Number Method Aj & Notes 95l96 97- 99l00 02 XX l XX XX l jI 151- SSC W- B LS D C X. XX l RHR PUMP 'B' DISCH PIPE - 45'ELBON  !

ISI- $$C . W-10 L3 D C X. XX RHR PUMP 'B' DISCH 45'ELBON - P!PE 151- SK W-11 ts D C X. XX RHR PUMP 'B' DISCH P2PE - ELBOW

!s!* SSC N-12 LS UD C X. XX 7 RHR PUMP 'B' DISCH ELBOW - ELBOW 181 SSC- W-13 LS U C X. XX kHR PUMP 'B' DISCH ELBOW - P!PE - .

r 181- $5C W-14 LS D C X. XX RHR PUMP 'B' DISCH PIPE - ELBOW f

+

181- SSC W-15 L8 U C X XX kHR PUMP 'B' DISCH ELBOW = VALVE 133. SSC ,

N-16 LS D C X . XX ,

r RHR PUMP 'B' DISCH TEE - VALVE 153- SSC - N-17 LS U C X. XX ,

RNA PLMP 'B' DI5CH VALVE = ELBOW  !

ISI* SSC N-16 LS D C X. XX j RHR PUMP 'B' DISCH ELDOW - PIPE

+

ISI SSC u-19 L3 U C X. XX RHR PUMP 'B' DISCH PIPE - ELBON 351- SSC W-20 L5 D C X. XX RHR PUMP 'B' DISCH ELBOW

  • P1PE 151. SSC W-21 C X. XX RHR PUMP 'B' DISCH PIPE - PIPE

!$1- $5C N-22 C 2. 31 b

kHR PUMP 'B' DISCH l' HEAT EXCH - PIPE PT 181- SSD N- 1 C 2. 31 ,

RHR HEAT EXCH - PIPE PT  !

RHR PUMP 'B' DISCH' 281- SSD W- 2 L5 U C X. XX RHR PUMP 'B' DISCH PIPE - ELBou 131- SSD W--3 L3 U C X. XX

~ [] d RHR PUMP 'B' DISCH ELBOW = P!PE i' 181 SSD N- 4 C X. XX RHR PUMP 'B' DISCH P2PE - P2PE 151- $5D N- S LS D C X. XX PHR PUMP 'B' D13CH PIPE

  • ELBOW j

!$1- SSD N- 6 LS U C X. XX RHR PUMP 'B' DISCH ELBOW - PIPE 9 181* SSD W- 7 L5 U C X. XX RHR PUMP 'B' DISCH PIPE - ELBOW

!$1+ SSD N- 0 LS UD C X XX RHR PUMP 'B' DISCH ELBOW ~ ELBOW 131. SSD W- 9 LS UD C X. XX RHR PUMP 'B' DISCH ELBOW = REDUCING TEE 181- SSD N-10 LS D C X. XX RHR PUMP 'B' DISCH TEE - MANGE ISt= SSD N-11 C X. XX RHR PUMP 'B' DISCH F1ANGE - VALVE ISt= SSD W-12 C X. XX RHR PUMP 'B' DISCH VALVE - PIPE 281- SSD , W-13 LS U C X, XX _

1 kMR PUMP 'B' DISCH PIPE - REDUCER 10X8 151- SSD N-14 L3 UD C X, XX 8

RHR PtMP 'B' DISCH REDUCER - TEE RED 181- SSD N-15 L3 U C X. XX RHR PUMP 'B' DISCH REDUCE TEE - PIPE ISI- SSD W-16 LS U C X. XX RNR PtRtP 'B' DISCH PIPE - 45 ELBOK 181- SSD W-17 LS UD C X. XX RNR PUMP 'B' DISCH 45 ELBOW - ELBOW 383 SSD- W-il LS D C X, XX g RHR PUMP 'B' DISCH ELBOW - PIPE 2 81- SSD - W-19 LS U C X. XX ,

RHR PUMP 'B' DISCH PIPE - ELBON ,

183 SSD W-20 LS D C X, XX r RHR PUMP 'B' DISCH . ELBOW - P!PE {

131- SSD W-21 LS D C X. XX t - RNR PUMP 'B' DISCH P!PE - ELBON l 151- SSD W-22 LS U C X, XX RHR PUMP 'B' DISCH ELBOW - PIPE 181- $5D N-23 LS D C X. XX RRR PtMP 'B' DISCH PIPE

  • ELBON e

Page 38

'I service inspectia Plamd Schedile

, Prairie Isla:d Nrclear Cenr:tiig Pl=t, Ulit 1 -  !

Third Ten-Year 1 ASME See XI Code Ed.1989

[ ISO Item ASME Sts system Item Description Item Number Method & Notes 95 96 9*1 l 99 00 02 XX XX XX 4 131. SSD . W-24 LS UD C I XX ,

RMA PUMP 'B' DtSCM ELBOW -45 + ELBOW

~181* SSD W-25 L3 D C X. XX ,

BHR PUMP *B* D18CH ELBOW = VALVE B*

181= 68A H- 1 F-A 6 C 9 20 MA!NST!;AM *B' $1ESMIC PESTRAINT b

151- 68A N- 2 F+A 6 C 3. 20 MAINS.T.AM 'B' SE!SMIC RESTRAINT b

!$1* 68A ' H- 3 F-A 6 C 3. 20 SEISMIC RESTRAINT b

MAtNS?"AM 'B' 181* $6A H+ 4 F-A 6 C 3. 20 MAINSTEAM 'B' BEAA'O BRAK AS$Y / 3 b

13!= 60A P-A 6 C 3. 20 i H. S . g BEAR'G BRAX AS$Y / 3 0

MAINSTEAM 'B' 151* 64A N- 6 F-A 6 C 3. 20 g MAINSTEAM 'B' BEAR'G BPAN ASST / 3 b

181- 60A H- 7 F-A & C 3. 20 g MAINSTEAM 'B' ANCHOR ELBOW / 8 233- 68A H. O F-A 6 C 3. 20 S

MAINSTEAM *B' SEISMIC RESTRAINT ,

181* 60A W+ 1 LS 2D C S. 50 NOE1LE = RED. ELBOW MT UT b

MAINSTEAM 'B' 133 68A W- 2 L3 2U2D C S. 50 MAINSTEAM 'B' RED. ELBOW - PIPE MT UT 151* 6a4 W- 3 LS 2UD C S. 60 MAINSTEAM *B' PIPE - ELBOW PT UT 181- 66A W- 4 LS D2U C S. SG -

MAINSTEAM 'B' ELBOW

  • PIPE MT UT Ih4- 60A WI .g tm C S. 50 MAINSTEAM 'B' PIL ' *!PE PT UT ISI- 68A W. 6 LS UD C S. 50 -!

MAINSTEAM 'B' P!PE = PIPE PT UT

!$1- 60A W-.7 L5 2DU C S. 50

,O MAINSTEAM 'B' ISI* 68A MA!!i57EAM 'B' PIPE a 45 ELBOW W. 8 LS 2U2D -

RED. ELBOW = PIPE C S. 50 PT UT MT UT i 151 60A W. 9 LS 2U2D C S. 50 -

MAIN; TEAM 'B' PIPE = RED. ELBOW MT UT

!$1- 68A W-10 L3 U2D C S. 50 MAINSTEAM *B' 45 RED. PLBOW

  • P!PE MT UT 131- 60A W-11 L3 UI, C S. So MAINST9M *B' PIPE - PIPE PT UT ISla 688 H+ 1 F-A 6 C J. 20 g MAINSTEAM 'B' BEAR'G BRAK ASST ^

181 68B M- 2 F-A 6 C 3. 29 g MAINSTEAM 'B' CONSTANT SUPPORT )

ISI. 688 N- 3 F-A g.

MAINSTEAM 'B' CONSTANT SUPPORT VT3 1

ISI- 688 H+ 4 F-A 1 g I HAINSTEAM 'B' HEADER RESTRAfNT VT3 ;1 151- 685 HS F-A l S

MAINSTEAM 'B' SUPPORT BRACKET V" 3 151- 6BB H- 6 F-A l MAIN 5 TEAM *B' DBL SNUBBER + CLAMP VT3 151 68B W 1 LS UD C S. 60 . g MAINSTEAM *B' P!PE - PIPE PT UT -

181- C8B W- 2 L3 2DU C S. SO .

g ,

M41NSTEAM 'B' PIPE - ELBOW PT UT l Is!- 408 W. 3 LS D2U C S. 60 g MAINSTEAM 'B' l'. BOW

  • PIPE HT UT 1 131+ 689 W- 4 La 202D C S. be g MAINSTEAM 'B' P!PE
  • ELBOW PT UT Isla 669 W- S La D2U C S. 50 g MAINSTEAM 'B' " Q - RIPE MT UT

' 31* 668-1 W- 6 L8 UD C S. 80 g .

MAINSTEAM *B' PIPE

  • SWEEPOLET PT

!st 6aB W* T C S. 51 g MA!NSTEAM *B' SEEPOLET - REDUCER MT UT ,

p 131- 608 Na 8 LS 2DU C S. 60 g i MAINSTEAM 'B' PIPE = REDUCIN'3 TEE PT UT 153- 6BB W- 9 LS UD C 5. 50 g MAINSTEAM 'B' REDUCING TEE - PIPE MT UT ISI- 688 - W-10 LS 2U C S. 50 g MAINSTI.AM 'B' RED. TEE - VALVE MT UT

\

i Page 39 . j l

IIscryice Irspectio2 Plaa c d Schedule Pr:Irie Isla-d NIclear G:nerati g Plant, Ulit 1

- Third Ten-Year ASME See XI Code Ed.1989

^ Relief ISO Item ASME Schedul

-( )

Method Requests

( %J / System Item Description Item Number & Notes 95 96 97 99 00 02lXX XXlXX ISI. 68B W-11 C 5. 51 MAINSTEAM 'B' VALVE - VALVE MT UT

!$3- 6s3 W-12 LS D HELB MAINSTEAM 'B' VALVE - PIPE

!$1- 688 W-13 L3 UD HELS MAINSTEAM *B' P!PE a PIPE ISI- 68C H- 1 F-A 6 C 3. 20 g MAINSTEAM 'B' BEAR'G BRAK ASSY 151- 68C H- 2 F-A g MAINSTEAM 'B' SNUBBFR VT3 ISI- 68C H- 3 F-A MAIN 5Tf.AM 'B' RESTRAINT VT3

!$1- 68C W- 1 C 5. 80 g MAINSTEAM 'B' PIPE - SWEEPOLET PT ISI. 68C W- 2 C 5. 51 MAINSTEAM 'B' 5WEEPOLET - PIPE MT UT ISI- 68C W- 3 C 5. 51 MAINSTEAM *B' PIPE - ELBOW MT UT 181- 68C W- 4 C 5. 51 MAINSTEAM *B' ELBOW = VALVE MT UT ISI- 68C W- 5 C 5. 51

'B' VALVE - REDUCER MT UT

_MA!NSTEAM _

15!- 68C W- 6 C 5. 51 MAINSTEAM 'B' REDUCER - VALVE MT UT 153- 68C W 'I LS 2UD C 5. 50 MAINSTEAM 'B' PIPE - TEE PT UT 131- 68C W- 8 LS 2D C 5. 80 MAINSTEAM 'B' TEE - FLANGE NOZZLE MT ISI- 68C W- 9 L3 D2U C 5. 50 g

MAINSTEAM 'B' TEE - PIPE M UT

!$1- 68C W-10 C 5. 80 MAINSTEAM 'B' PIPE - FLANGE NOZZLE PT A ISI- 68C W-11 C 5. 80 f \ MAINSTEAM 'B' PIPE - FLANGE NOEZLE PT

( Is! sec KAINSTEAM 'B' W-12 Ls u PIPE - CAP C 5. 50 PT UT Is!- 68C W-13 LS D20 C 5. 50 MAINSTEAM 'B' TEE - PIPE MT UT ISI- 68C W-14 LS 20 C 5. 80 MAINSTEAM 'B' P!PE - FLANGE NOZ2LE PT ISI- 68C W-15 C 5. 80 MAINSTEAM 'B' P!PE - SWEEPOLET PT ISI- 68C W-16 C 5, 51 MAINSTEAM 'B' SWFEPOLET - CAP MT UT

!$!- 68C W-17 C 5. 80 MAINSTEAM 'B' PIPE - FLANGE NO2 ELE PT ISI- 68C W-18 LS U C 5. 50 MAINSTEAM 'B' PIPE - CAP PT UT ISI- 69 H- 1 F-A & C 3. 20 g FEEDWATFR LOOP 'B' SEISMIC RESTRAINT 151a 69 H- 2 T-A & C 3. 20 g S

FEE!*ATER LOOP 'B' SEISMIC RESTRAINT ISI- 69 'H- 3 F-A y FEE 0 WATER LOOP 'B' EUPPORT VT3 ISI- 69 H- 4 F- A & C 3. 20 g TEEISATER LOOP 'B' ANCHOR ELBOW 181- 69 H- 5 F-A & C 3. 20 g g FEEDWATTR LOOP 'B' ANCHOR ELBOW IS1- 69 H- 6 F-A g g ,

IIEDWATER LOOP 'B' BEAR'G BRAK ASSY YT3 J ISI- 69 H- 1 F-A & C 3, 20 3 FEE!*ATER LOOP 'B' ANCHOR ELBOW 181- 69 H- 5 F-A 6 C 3. 20 g g FETI*ATER LOOP 'B' ANCHOR ELBOW j ISI- 69 H- 9 F-A & C 3. 20 g g

FEEI*ATER I40P 'B' 8EISMIC RISTRAINT ll 151* 69 W- 1 C 5. 51 MT UT FEEDWATER LOOP

'B'__ Valve - PIPE W- 2

[ '

t ISI- 69 ITEI*ATER LOOP 'B' PIPE - PIPE C 5. 51 MT UT

% ~~I$!- 69 W- 3 C 5. 51 g

FIE!*ATER LOOP 'B' PIPE - ELBOW MT UT ISI- 69 W- 4 C 5. 51 FTEDWATER I40P 'B' ELBOW - PIPE MT UT Page 40 1

IIservice IIspection Plan erd Schedule '

Pr:Irie Isla d Nuclear Garctirg Plant, Unit 1 Third Ten-Year. .

ASME See XI Code Ed.1989 A Relief Schedule

,/ ISO .

Item ASME Requests

( SysteIA' Item Description Item Number Method & Notes 95 96 l 97 99 00
02 xx xx xx 181- 69 i M. S C S. S1 FEEDNATER LOOP 'B' PIPE - PEHE. 78 MT UT 781 69 W. 6 C S. 51 g FEEDNATER LOOP 'B' PENE. 78 - P!PL MT UT 131 69 N 7 LS U C S. 61 g PEEDWATER LOOP 'B' PIPE - ELBON MT UT ISI 69 W. O LS D , C S. 51 g PEEi*ATER LOOP 'B' ELBON - PIPf. MT UT -

181+ 69 W- 9 C S. 53 g FEEDWATER LOOP 'B' PIPE

183- 69 W-16 C S. 53 g FEEDWATER LOOP 'B' P!PE

253 69 C 5. 51 g-FEEDNATER LOOP 'B' W-11 ELBON,- PIPE MT UT 83I 69 W-10 C 5. 51 g FEEDWATER LOOP 'B' PIPE - PIPE MT UT

'181- 69 N-19 C S. 53 g FEEDWATER LOOP 'B' PIPE - VALVE MT UT ISI- 69 .

W-20 C 5. $1 g FEEDWATER LOOP 'B' VALVE - ELBON MT UT Is!- 69 N-21 C S. $1 FEEDWATER LOOPB' ELBOW - P!PE MT UT Is!* 69 W-22 C S. $1 f1EDWATER LOOP 'B' REDUCER - SWEEPOLET MT UT ist- 69 N-23 C S. 80 5WEEPOLET - PIPE MT b

FTEDWATER LOOP 'B' 151 69 W-24 C 5. $1 FEEDWATER LOOP 'B' PIPE = REDUCER MT UT ISI- 69 N-25 C 5. 21 ITEDWATER LOOP 'B' REDUCER - NOZELE MT UT ISI. 03A W.1 LS U C X. XX RHR PUMP 'A' DISCH RED TEE - ELBOW I5!- 03A W- 2 C X. XX RHR PUMP "A' DISCH ELBOW

  • PIPE

!sta 03A N- 3. C X. XX RHR PUMP 'A' DISCH PIPE - ELBON j IS!* E3A N4 C X XX RHR PUMP "A" DISCH ELBOW - PIPE 8 181- 83A W- S C X. XX kHR PUNP 'A' DISCH PIPE - ELBON ISI- 03A W. 6 C X, XX RHR PUMP 'A' DISCH ELBOW = P!PE

!sI- 03A W.1 C X. XX RHR PUMP *A' DISCH PIPE - TLE 151- 83A W. O C X. XX RHR PUMP 'A' DISCH TEE - ELBOW IS!- 8 3A . W- 9 CX.4X RNR PUMP 'A' DISCH ELBON = PIPE ISI- 83A N-10 C X. KX RHR PUMP 'A' DISCN FIPE - ELBOW

!$1= 83A W-11 C X. XX RHR P124P *A" DISCH ELBON = PIPE 181- S SA ' W-12 0 X, XX RHR PUMP 'A' DISCM s'IPE - ELBON 331* O SA N C X, XX RHR PUMP *A" DISCH ELBOW - PIPE

!$1= 83A W-14 C X. XX RHR PUMP 'A' DISCM PIPE

  • ELBOW ISI* 83A W-15 C X. XX RHR P'JMP "A* D18CH ELBOW - ELBOW

!$1+ 0 3A - N-16 C X. KX RMR PUMP *A" DISCH ELBOW - P!PE Page 41

I: service I:spectiol Plan tid Schedule Prcirle Istrid N;cle:r Ge er ti:g Pla:t, Unit 1 Third Ten

  • Year ASME See XI Code Ed.1989

/^N ASME Relief Schedule

( ISO Item ftequests

(,} System Item Description Item NumbeE Method & Notes 95l96 97 l 99 l 00 02 XX -XX XX 131- 33A W-37 C X. XX PNA PtMP 'A' DISCH P!PE - ELBO'?

Isla 83A W-10 C X. XX RHR PtMP 'A' DISCH ELBOW - P!PE ISI- 83A W-19 C X. XX RHR PUMP "A" DISCH PIPE - 45' ELBOW 151* 03A W-20 C X. KX RHR PUMP 'A' DISCH 45' ELBOW

  • PIPE 131- 03A W-21 C X. XX RHR PtMP *A' DISCH PIPE - VALVE 151- 43A W-22 C X. XX St PIMP 'A' SUCTION VALVE ELBOW IS!= B3A W-23 C X. XX SI PtMP 'A' SUCTION ELBOW
  • TEE 181- 03A W-24 C X. XX

$1 PtHP 'A' SUCTION TEE - PIPE 181 63A W-25 C X. XX

$1 PtMP 'A' SUCTION PIPE - PIPE 151- 83A W-26 C X. XX

$! PIMP 'A' SUCTION PIPE - ELBOW 151- 93A W-27 C X. XX SI PLMP 'A' SUCTION ELBOW

  • FLANGE ISI- 03A W-20 C X. XX SI PUMP 'A' SUCTION FLANGC - PTPE ISI- 83A W-29 C X. XX St PtMP 'A' SUCTION PIPE - FLANGE 181 4 3A W-30 C 6. 10 S t PIMP ' A' SUCTION PLG a S.I . PtMP 811 PT ISI. 63B W+ 1 L5 U C X. XX RHR PUMP 'B' DISCH REDUCE TEE - ELBOW 181- 839 W- 2 C X. XX FHR PUMP 'B' DISCH ELBOW = PIPE

[ ISI- 43B W* 3 C X. XX RHR PtMP 'B' DISCH PIPE a ELBOW

( f

\d ISI- 83B N* 4 C X. XX RHR PUMP 'B' ()fSCH ELBOW - ELBOW 351- 03B W- 6 C X. XX RHR PIMP 'B' DISCH ELBOW - PIPE __,

ISI- 838 W- 6 C X. XX RRR PtMP 'B' DISCH PIPE = TEE ISt- 838 W- 7 C X. XX RNR PUMP 'B' DISCH TEE = ELBOW ISI- 838 W- 8 C X . XX BHR PUMP 'B' DISCH ELBOW

  • PIPE 153- 038 W9 C X. XX RHR PtMP ' B' DISCH PIPE - ELB N 153* 838 W-10 C X. XX RHR PLMP 'B' DIECH ELBOW -

151- 838 W 11 C X. XX PHR PtNP 'B' DISCH F' 131* 83B .* C X. XX RHR PLMP 'B' DISCH  :

._llPE ISta 038 ip- C X. XX DHR PtMP 'B' DISCH P1ft - P!PE 331- 938 W 14 C X , XX RHR PtMP 'B' DISCH PIPE - El&OW 151- 839 W-15 C X. XX RHR PUMP 'B' DISCH ELBOW - P!PE j 181 836 W-16 C X. XX RRR PUMP 'B' DISCH P1PE

  • ELBOW

!sI- $3R W-T7 C X. XX RHR PtMP ' B' DISCH ELBOW - PIPE 151- 838 W-16 C X, XX RHP. PUMP 'O' DISCH PIPE - VAIVE

  • C X. XX 151- 838 W-19 St PtNP *B' SUCTION VALVE - ELBOW ISI* 938 W-20 C X. XX

% 'B' StKTION ELBOW - PIPE

_S ! PtMP

} 151- 038 W-22 C X. XX

(

(/ _S 1 P_tMP ISI+ 83B

'B' St'CT I ON TEE - PIPE W-23 CX, XX

$1 PUNP 'B' SUCTION PIPE - PIIT

!$1- 938 W-24 C X. XX SI PtMP 'B' SUCTION P!PE

  • ELBOW Page 42

Irservice IIspection Pla z c;d Sched:le Prmirie Isla d Niclear G:nir: ting Plalt, U:it 1 Third Ten-Year ASME See XI Code Ed.1989

{

[] y ISO Item ASME Method Relief Requests Schedule

(/ System Item Description Item Number & Notes 95 :96 97 99' 00 02- XXlXX XX 281- 8 3b W-25 C X. XX S1 PtMP 'B' SfR" TION ELBOW - F1ANGE - -

ISI- 838 W-26 C X XX 51 PtMP 'B' SUCTION 11 ' ACE - PIPa.

181- 838 d-27 C X. XX SI PIMP 'B' SUCTION PIPE - FLANGE ISI 038 W-2s C 6. 10 81 PLMP 'B' EUCTION FLG - 8.1. PUMP 912 PT ISI- 99A H- 1 P-A VT3 b

RHR PtMP *A" D3GCH REISMIC SUPPORT ISI- 49A H- 2 F-A VT3 b

RHR PUMP 'A" DISCH SE"SMIC SUPPORT 131 09A H- 1 F-A b

PHR Pt9fP *A' DISCH SEI& TIC SUPPORT VT3 188* 89A H- 4 F-A PHR PIMP 'A' DISCH HYDb SNUBBER /4 LUGS VT3 ISI- 09A H- S F- A RHR PIMP "A" DISCH RIGID HANGER / CLAMP VT3 181- D BA W. 1 C T. XX RHR PtMP 'A' DISCH REDUCER - PIPE ISI- 09A W- 2 LSU C X, XX kHR PUMP 'A* DISCH PIPE - ELBOW ISI- 09A W- 3 LSD C X. XX RHR PUMP 'A' DISCH ELBOW - PIPE _

ISI- 09A W- 4 C X. XX RHR PtMP 'A' DISCH PIPE - FIPE ISI 89A W- S C X, XX RHR P!MP 'A' DISCH PIPE - ELBOW ISI- 99A W- 6 C X. XX PHR PtMP *A* DISCH ELBOW ~ PIPE 131- B9A W- 1 C X. XX RHR PIMP 'A' DISCH PIPE - 4 5 ' ELBOW Oj 351- 89A W 8 4b' ELBOW - PIPE C X. XX RHR PUMP 'A' DISCH b 151- 09A W- 9 C X. XX RHR PtMP 'A" DISCH PIPE - FLANGE ISI- 89A W-10 C X. XX RHR PLMP *A* DISCH ttRNGE - FIPE ISI- 89A W-11 C X. XX RHR PIMP 'A' DISCH PIPE - WELDOLET ISI- 09A W-12 LS U C X. XX RHR PtMP *A* DISCH PIPE - ELBOW

!$1= 99A W-13 LS D C X. XX RHR PLMP 'A" DISCH 45' ELBOW - PIPE ISI- 09A W-14 C X. XX RHR PtMP 'A' DISCH PIPE - 45' ELBOW 331- 69A W-15 C X. XX kHR FtMP 'A' DISCH 45' ELBOW - PIPE 151- 09A W-16 C X. XX RHR PtNP 'A' DISCH PIPE - PEN O 48 ISI- 99A W-11 C X. XX PHR PLMP "A" DISCH PEN 8 48 - ELBOW 381- 09A W-16 C X. XX j RHR I"JMP 'A' DISCH ELBOW - ELBOW i I

191- 99A W-19 C X. XX RHR PUMP 'A' DISCH ELBOW - PIPE l

2SI- 89A W-20 C 5. 51 i RHR PLMP 'A' DISCH PIPE - VALVE PT UT ISI- 49A W-21 C 5. Il g RHR PIMP "A* DISCH VALVE - PIPE PT UT ISI- 09h W-22 C 5. Il g RHR PIMP "A" DISCH PIPE - ELBOW PT UT ISI- 994 W-23 C 5. 11 RHR PtMP 'A' DISCH ELBOW - PIPE PT UT ISI- 99A W-24 C 5. 11 kHR PLMP ' A' DISCH PTPE - ELBOW PT UT ISt- 89A W-25 C5 Il p RHR PtMP 'A" DISCH ELBOW - PIPE PT UT l f th-99A W-26 C 5. 11

( r RHR PLMP 'A' DISCH 181- 99A PIPL - ELBOW W-21 C 5. 11 PT UT RHR PtMP 'A" DISCH ELB3M - PIPE PT UT ISI- 99A W -2 8 C 5. Il RHR PIMP 'A* D]SCH PIPE - PIPE PT UT Page 43

I:scrvice Inspection Plamd Schedule Pral Ic Island N:cle'r Gen:rati;g Plant, Uzit 1 Third Ten-Year ASME Sec XI Code Ed.1989

[ ISO Item Item Description ASME Item Number Method e ts

( j System & Notes 95 96 97 l 99 00 02 l XX XX XX ISt- 09A W-29 C S.11

  • A" DISCH PIPE - ELBOW PT UT O RHR PUMP ISI- 49A W-30 C 5. 11 RHR PLMP 'A' DISCH ELBON - PIPE PT UT 151- 09A N-31 C 5. 11 RHR PtMP *A" DISCH PIPE - ELBOW PT UT Ig!- 09A W-32 C 5. 11 RHR P'JMP 'A' DISCH ELBOW - PIPE PT UT 133- 99A W-33 C 5.11 RHR PUMP *A* DISCH PIPE - VALVE PT UT 181- 89B H- 1 F- A S

RHR PIMP 'B' DISCH SE!$MIC PE!TRAINT VT3 ISI- 898 H- 2 P-A RHR PtMP 'B' DISCH RUPTURE RESTRAINT VT3 ISI- 09B H- 3 F-A RHR PUMP 'B' DISCH $LIDE SUPPORT VT3 183- 098 H- 4 F-A ,

VT3 0

RHR PIMP 'B' DISCH SWRY STRUT /CLRMP 381- 998 H- 5 F-A VT3 0

RHR PIMP 'B' DISCH SPR1HG/ CLAMP 181* 89B H- 6 F-A RHR PIMP 'B' DISCH HYDR ENUBBER VT3 TSI- 898 H- 7 F-A S

RHP PLMP ' B' DISCH RIGID HANGER /CLRMP VT3 151- 098 H- 8 F-A RHR PIMP 'B' DISCH SWAY STRUT VT3 181- 898 N- 1 L3 U C X. XX DliR PtMP 'B' DISCH RF'AICE TEE - PIPE 15I- 098 N 2 LS D C X. XX kHR PtMP 'B' DISCH N PE - ELBOW  !

33!a 899 N- 3 L8 U C X XX RHR tMP ' B' DISCH ELBOW-PIPE 10" q 151- 898 N- 4 C X, XX

_ RNR PtMP 'B' DIbCh P!PE f W- 5 L8 D (j ISI- 89B CONTAINMENT - ELBOW C X XX RHR PtMP 'B' DISCH 151- 89B W- 6 L5 U C X. XX RHR PtMP 'B' DISCH ELBOW - PIPE

~ UI- 89B W- 7 C X . XX RHR PUMP 'B' DISCH PIPE FLANGE 10-ISI- 898 W+ 0 C X. XX RPR PLMP 'B' DISCH *MNGE - PIPE ISI- 89B N- 9 C X. XX RHH PIMP 'B' DISCH PIPE WELDOLET 351- 898 N-10 LS U C X. XX RNR PLMP 'B' DISCH PIPE - 45 ELBOW ISI- 899 N-11 L3 U C X. XX RNR PIMP 'B' DI5CH 45 ELROW

  • PIPE ISI- 99B N-12 L3 U C X. XX RHR PIMP 'B' DICCH <[E - 45 ELBON ISI- 89B k-13 L5 D C X. XX

~RHR PIMP 'B' DISCH 45 ELBOW - PIPE I$1- 09B W-34 C 5. 51 RHR PIMP 'B' DISCH PIPE - PEN 10 PT UT 151- 895 W-15 L5 D C X, XX

_P;HR PLMP 'B' DISCH PEN 10 - ELBOW 181- 99B W-16 LS UD C X. XX RHR PtMP 'B' DISCH 4 5 ELBOW - 45 ELBOW 151- 69B W-17 LS U C X. XX RNR PUMP 'B' DISCH 45 ELBOW - RED TEE 181- P9B N-18 C 5. 51 g

RHR PtMP 'B' DISCH TEE - VALVE PT UT 15!- 095 W-19 C X. XX RHR PIMP 'B' DISCH ICD TEE - PIPE 151- S SB W-> 0 C X. XX RHR PUMP 'B' DISCH l'IPE - ELBON ISI 998 W-21 C X. XX RHR PtMP 'B' DISCH ELBOW - PIPE

[ m  !$!- 998 W-22 C S. 11 8 RHR PtMP 'B' DISCH PIPE - VALVE PT UT

./ iSI-998 W-23 C b. 11 D HH PLMP ' D ' Iq sCH VALVE - FLBOW PT UT ISI- 990 W-24 C 5. 11 RNR PIMP 'B' DISCH PT UT J ELROW - PIPE Page 44

Irservice IIspection Plamd Schedule Pr;irie Islard N:cle:r G=erating Pl=t, U11t 1 1rhird 1ren-1' ear ASME Sec XI Code Ed.1989

~s Relief Schedule

. ISO Item ASME

(  %

SyBtem Item Description Item Number Method Requests

(^,,,/) & Notes 95l96 97l99 0 02 ;xx lxx lxx 183* GDR W-2S C S. Il RHX PUMP 'B' DISCH PIPE - ELBOW PT UT S ISI- 999 W-26 C S. 11

  • RNR PUMP 'B' LISCH ELaDN - PIPE PT UT 181 09B W-21 C S. 11 RHR PUMP 'B' DISCH PIPE - 45' ELBOW PT UT 131 099 W-20 C 5. 11 RHR PUMP 'B' DISCH 45' ELBOW - PIPE PT UT

.oa- 09B W-29 C S. 11 ,

RHR PUMP 'B' DISCH PIPE - $5' ELBOW PT UT ISI- 09B W-30 C S.11 RHR PG4P 'B' DISCH S$* ELBOW - PIPE PT UT 181- 898 W-31 C S. 11 RHR PUMP 'B' DISCH PIPE - VALVE PT UT 181- 91A W- 1 C X. XX ALT CDNT SP 11 SUCT TEE - PIPE ISI- 91A W- 2 C X. XX ALT CONT SP 11 SUCT PIPE - ELBOW 251- 91A W- 3 C X. XX ALT CONT SP 11 SUCT ELBOW - PIPE 151- 91A W- 4 C X. XX ALT CONT SP 11 SUCT PIPE - ELAOW 181- 91A W- S C X, XX

, ALT CONT SP 11 SUCT ELBOW - PIPE ISI- 91A W. 6 C X, XX ALT CONT EP 11 $UCT PIPE - PIANGE ISI- 91A W- 7 C X. XX ALT CONT $P 11 $UCT FLANGE - PIPE 181 91A W- 0 C X. XX

_ ALT CONT SP 11 SUCT PIPE - ELBOW ISI- 91A W- 9 C X. XX ALT CONT SP 11 SUCT ELBOW - PIPE

~s  !$1- 91A W-3D C X, XX

[ j ALT CDNT SP 11 SUCT PIPE - WELDOLET

\ / ISI- 91A W-11 C X. KX

  1. ALT CONT SP 11 SUCT PTPE - ELBOW 351- $1A W-12 C X. XX ALT COKf SP 11 SUCT ELBOW - VALVE ISI- 91A W-13 C X. XX ALT CONT SP 11 SUCT VALVE - REDUCER

~[81- 91A W-14 C X. XX ALT CONT SP 11 SUCT REDUCER - TEE ISI- 91A W-16 CX. XX ALT CONT SP 11 AUCT TEE - WELDOLET ISI- 91A W-16 C X. XX ALT CONT SP 11 $UCT TEE - FLANGE ISI- 91A W-17 C X. XX ALT CONT SP 11 $UCT FLANGE

  • PtPE ISI- 91A W-16 C X. XX ALT CONT SP 11 SUCT PIPE - PLANGE 15I. 918 W- 1 C X. XX ALT CONT SP 12 SUCT TEE - PIPE 151- 919 Wa 2 C X. XX

, ALT CONT SP 12 EUCT PIPE - ELBDW 151- 91B W- 3 C X. XX ALT CDNT SP 12 SUCT ELBOW - PIPE ISI- Dip W- 4 C X. XX ALT CD4T SP 12 SUCT PIPE - ELB3W IBl* 918 W- S C X. XX ALT CDNT SP 12 SUCT ELBOW - PIPE 131- 918 W- 6 C X. KX ALT CONT SP 12 $UCT PIPE - ELBOW ISI- 919 W- 7 C X. XX ALT CONT 8P 12 SUCT ELb3W - P!PE 151- 919 W- 8 C X. XX ALT CONT SP 12 SUCT PIPE - FLANGE 151- 91B C X. XX lW- 9 ALT CONT SP 12 $UCT iPLANGE - PIPE p' 131- 919 C X. XX lW-10 f , _ ALT COWT $P 12 SUCT JP1PE-ELBOW

\s s/ 151- 91B W-11 CX, XX ALT CONT SP 12 SUCT ELBOW - PIPE 151- 918 'W-12 C X. XX I~

Alf CONT SP 12 SUCT __

PIPE - WF.LDOLET Page 45

l Inservica Irspection Plamd Schedule Prnirie Istrd Nicle r G=r;tiig Plaxt, Urit 1 Third Ten-Year ASME See XI Code Ed.1989

,O ASME Relie1 Schedule

! ) ISO Item Requests

(/ System Item Description Item NumbeE Method & Notes 95 96 9'l 99l00 02 XX XXlXX 331- 919 W-12 C X, XX ALT CONT EP 12 SUCT PIPE - ELDOW ISI- 918 W-14 C X. XX ALT CONT SP 12 SUCT ELBOW - VALVE ISI- 918 W-15 C X. XX ALT CONT SP 12 SUCT VALVE - REDUCER ISI- 918 W-16 C X. XX ALT CONT SP 12 SUCT REDUCER - TEE ISI- 918 W-17 C X. XX ALT CONT $P 12 SUCT TEE - WELD 0LET ISI- 918 W-19 C X. XX ALT CONT SP 12 SUCT TEE - FIANGE ISI- 91B W-19 C X.XX ALT CONT SP 12 SUCT FLANGE - PfPE IS!- 918 W-20 C X. XX ALT CONT SP 12 SUCT PIPE - FLANGE ISI- 93A H- 1 F- A RHR HEAT EXCH 11 SUPPORT VT3 33-93A H- 2 F-A b

RHR HEAT EXCH 11 SUPPORT VT3 ISI- 93A W+ 1 C 1. 20 RHR HEAT EXCH 11 HEAD - SHELL UT ISI- 93A W- 2 C 1.10 RHR HEAT EXCH 11 SHELL - FLANGE UT 151- 93B H- 1 F-A PHR HEAT EXCH 12 SUPPORT VT3 ISI- 939 H- 2 F-A RHR HEAT EXCH 12 SUPPORT VT1 ISI- 938 W- 1 C 1. 20 0

RHR REAT EXCM 12 HEAD - SHELL UT 251- 938 W- 2 C 1. 10 RHR HEAT EXCH 12 SHELL - F1ANGE UT

/g 181- 96 W. 2 C X. XX

[ l CONT SPhAY 11 DISCH FLANGE - REDUCER 351- 96 W- 3 C X. XX CONT SPRAY 11 DISCH REDUCER - PIPE 181- 96 W. 4 C X. XX CONT SPRAY 11 DISCH PIPE - WELDOLET ISI- 96 W- 5 C X. XX CONT SPRAY 11 DISCH PIPE - VALVE ISI- 96 Wa 7 C X. XX CONT SPRAY 12 DISCH F1ANGE - REDUCER 3 1= 96 W- 8 C X. XX CONT SPRAY 12 DISCH REDUCER - PIPE 152- 96 W- 9 C X. XX CONT SPRAY 12 0 ISCH PIPE - WELDOLET ISI- 96 W-10 C X. XX CONT SPRAY 12 DISCH PIPE - VALVE ISI- 97A H- 1 F- A SI 12 DISCHARGE SPRING / CLAMP VT3

'I3!- 97A W. 1 C 5. 21 SI 12 DISCHARGE PEN 28A - REDUCER PT UT 153- 97A W- 2 C 5. 2.'

St 12 018 CHARGE REDUCER - P!PE PT UT TE"!= 97A W- 3 C 5. 21 SI 12 PISCHARGE PIPE - PIPE PT UT ISI- 97A - W- 4 C 5. 21 SI 12 DISCHARGE P!PE - 45 ELBOW PT UT ISI- 97A W- 5 C 5. 21 SI 12 FISCHARGE 45 ELBOW - PIPE PT UT W - 97A W- 6 C 5. 21 51 12 DISCHARGE PIPE - 45 ELBOW PT UT ISI- 97A W- 7 C 5. 21 51 12 DISCHARGE 45 ELBOW - PIPE PT UT 181- 97h W- 8 C 5. 21 PIPE - RED TEE PT UT

~31 12 DISCHANCE ISI- 97A W- 9 C 5. 21 SI 12 DISCHAPGE RED TEE - REDUCER PT UT b ISI- 979 H- 1 F-A f

" ) SI 12 DISCHARGE kSI- 97B BOX SUPPORT H- 2 F-A VT)

SI 12 DISCHARGE BOX SUPPORT V13 ISI- 97in W- 1 C 5. 21 j 51 12 PISCHAAGE RED TEE - P!PE PT UT , l Page 46

I service IIspectio2 Pla3 c::d Scliedile Prrfrie Isla d Nucle:r G:neraticg Fdait, Ulit 1 Third Ten-Year ASME Sec XI Code Ed.1989

.[ ISO System Item Item Description ASME Method q ts

(/ ISI- 978 W- 2 Item Number C S. 21

& Notes 95l96 97 99l00l02 xx XX XX 5! 12 DISCHARGE P!PE - ELBOW PT UT 181- 978 W- 3 C 5, 21 81 12 DISCHARGE ELBOW - PIPE PT UT 381- 975 W- 4 C 5. 21 E! 12 DISCHARGE PIPE - ELBOW PT UT 151- 975 W- $ C 5. 21 SI 12 DISCHARGE dLBOW - PIPE PT UT ISI- 978 W* 6 C S. 21 SI 12 DISCHARGE PIPE - ELBOW PT UT 331- 975 W- 7 C S. 21 SI 12 DISCHARGE ELBOW - PIPE PT UT

!$3- 975 W- 8 C 5. 21 SI 12 DISCHARGE PIPE - ELBOW PT UT ISI- 978 W- 9 C 5. 21 51 12 DISCHARGE ELBOW - PIPE PT UT ISI- 978 W-10 C $. 21

$1 12 DISCHARGE PIPE - ELBOW PT UT 151- 976 W-11 C 5. 21 5I 12 DISCHARGE ELBOW - PIPE PT UT 381- 978 W-12 C S. 21 SI 12 DISCHAkGt PIPE - 45 ELBOW PT UT ISI- 97C N- 1 F-A 51 12 DISCHARGE SNUBBER / CLAMP VT3 ISI- 97C H- 2 F* A SI 12 DISCHARGE BOX SUPPORT VT3 151- 97C H- 3 F-A 51 12 DISCHARGE BOX SUPPORT VT3 181- 97C H- 4 F-A 81 12 DISCHARGE BOX SUPPORT VT3 183- 97C Ha 5 F-A 31 12 DISCHARGE SNUBBER / CLAMP VT3 251- 97C H- 6 F-A g g) SI 12 DISCHARGE RIGID BOX VT3

( 181- 97C SI 12 DISCHARGE H- 7 ROD / CLAMP F-A VT3 151- 97C H- 8 F-A SI 12 DISCHARGE SUPPORT VT3 0

151- 97C W- 1 C 5. 21 81 12 DISCHARGE 45 ELBOW - PIPE PT UT I5I- 97C W- 2 C 5. 21

$! 12 DISCHARGE PIPE - P1PE PT UT 151- 97C W- 3 C 5. 21

$1 12 DISCHARGE PfPE - VALVE PT UT ISI- 97C W- 4 C 5, 21 81 12 DISCHARGE VALVE - PIPE PT UT 181* 97C W- 5 C 5. 21 SI 12 DISCHARGE P!PE - ELBOW PT UT ISI- 97C W- 6 C S. 21 81 12 DISCHARGE ELBuW - PIPE PT UT 181- 97C W- 7 C 5. 30 SI 12 DISCHARGE PIPE - ORIFICE PT ISI- 97C W- 0 C 6. 33 81 12 DISCHARGE ORIFICE - PIPE PT 151- 97C W- 9 C S. 21 SI 12 DISCHARGE PIPE - ELBOW PT UT

!st- 97C W-10 C 5. 21 51 12 DISCHMGE ELBOW - PIPE PT UT ISI- 970 W-11 C b. 21 j

$1 12 DISCHARGE PIPE - ELB3W PT UT

!$1- 9 FC W-12 C 5. 21 31 12 DISCHARGE ELBOW - PIPE PT UT 181- 97C W-13 C 5. 21 SI 12 D18 CHARGE PIPE - VALVE PT UT 151- 97C W-14 C 5. 21 Pt 12 DISCHARGE VALVE - PIPE PT UT

!$1- 97C W-16 C S. 21 II 12 DISCHARGE PIPE - TF:E PT UT

/"\ ist- 97C W-16 C S. 21 81 12 DISCHARGE TEE - REDUCER PT UT

% I53- 97C W-17 C 5. 21 BI I2 DISCHARGE TEE a PIPE PT UT I5I- 97C W-it C 5, 21 SI 12 CISchARGE PIPE - VALVE PT UT Page 47

Irservice 1:spectior Plai exd Sched;1c Prcirle Isla:d Nucle:r G=:r;ti:g Plait, Unit 1 Third Ten-Year ASME Sec XI Code Ed.1989

[ ISO System Item Item Description ASME Item Number Method u ts 95 96 l 97 l 99 tj & Notes 00l02lXX XX XX 181- 97D H- 1 F-A

$! 12 DISCHARGE BOX HANGER VT) 13I- 97D H- 2 F-A SI 12 DISCHARGE BOX HANGER VT) 151- 97D H- 3 F-A BI 12 DISCHAPGE SNUBBER / CLAMP VT3 151- 97D H- 4 F-A S

51 12 DISCHARGE BOX HANGER VT3 ISI- 97D W- 1 C 5. 21 SI 12 DISCHARGE REDUCER - PIPE PT UT III- 91D W- 2 C 6. 23 81 12 DISCHARGE PIPE - ELBOW PT UT ist- 97D W- 3 C S. 21 51 12 DISCHARGE ELh0W = PIPE PT UT ISI- 97D W- 4 C 5. 21 SI 12 DISCtlARGE PIPE - ELBOW PT UT 151- 97D W- S C $. 21 31 12 DISCHARGE ELBOW - PIPE PT UT 151- 97D W- 6 C 5. 21 SI 12 DISCHARGE PIPE - VALVE PT UT 181- 97D W- 7 C 5, 21 51 12 DISCHARGE VALVE - PIPE PT UT ISI- 97D W- 0 C b. 30

$1 12 DISCHARGE PIPE - ORIFICE PT 15I- 97D W- 9 C 5. 30 El 12 DISCHARGE ORIFICE - PIPE PT 181- 97D W-10 C 5. 21 81 12 DISCHARGE PIPE - ELBOW PT UT 181- 97b W-11 C S. 21 SI 12 DISCHARGE ELBOW - PIPE PT UT ISI- 97D W-12 C 5. 21 Si 12 DISCHARGE PIPE - ELBOW PT UT

('N Ny SI 12 DISCHARGE 181- 97D ELBOW - PIPE W-14 C 6. 21 PT UT 5! 12 DISCHARGE PIPE - VALVE PT UT ISI- 97D W-16 C 6. 21 SI 12 DI5 CHARGE VALVE - P2PE PT UT

!$1+ 97D W-16 C S. 21 SI 12 DISCHARGE PIPE

  • TEE PT UT 183- 97D W-11 C S. 21 51 12 DISCHARGE TEE - REDUCER PT UT I51- 97D W-le C S. 21 SI 12 DISCHARGE TEE - PIFE PT UT 151- 97D W-19 C 5. 21 SI 12 DISCHARGE PIPE - VALVE PT UT ISI- 98A H- 1 F-A SI 11 DISCHARGE BNUBBER TO CLAMP VT3 I5!- 96A H- 2 F- A SI 11 DISCHARGE SNUBBER / CLAMP VT3 ISI- 98A H- 3 F- A

$1 il DISCHARGE DOUBLE SPR/ CLAMP / LUG VT3

!$3* 98A H- 4 F-A SI 11 DISCHARGE FLOOR RESTRAINT VT3 151- 98A H- 5 F-A

$I 11 DISCHARGE ROD / CLAMP VT3 181- 96A H- 6 f-A 81 11 DISCHARGE SUPPORT & SEISMIC VT3 ISI- 9th H- 7 F-A

$1 11 DISCHARGE ROD / CLAMP VT3 IS!- SsA W- 1 C 5. 21 SI 11 DI$ CHARGE PEN 2RB - REDUCER PT UT 181- 9AA W- 2 C 5. 21 SI 11 DISCHARGE REDUCER - PIPE PT UT ISI- 98A W- 3 C 5, 21 51 Il DISCHARGE PIPE - ELBOW PT UT

~5st- 94A W- 4 C 5. 21 SI Il DISCHARGE ELBOW - 45 ELBOW PT UT

!?Ia OsA W. S C 5. 21 4 SI 11 DISCHARGE 45 ELBOW - PIPF PT UT ISI- 96A W- 6 C S. 21

$1 11 DISCHARGE PIPE - ELBOW PT UT 151 9fA W- 7 C 5. 21

$1 11 DISCHARGE ELBOW - PIPE PT UT Page 48

1: service I;spection Plannd Sched:le Prairie bland N!cle:r Gezer:tiIg Pint, U lt i Third Ten-Year ASME See XI Code Ed.1989

[ ISO Item ASME ts System Item Description Item Number Method & Notes 95 XX

\v/ 96 l 97 l 99 l 00 l 02xxlXX 333- 98A W- 0 C 5. 21 51 11 DISCHARGE PIPE - ELBOW PT UT 161- 98A W- 9 C 5. 21 31 11 D!$ CHARGE ELBOW - PIPE PT UT 181- 98A W 10 C 5. 21

$! 11 DISCHAkGE PIPE - ELBOW PT UT 131- 98A W-11 C 5. 21 51 11 DISCHARGE ELBOW - PIPE PT UT

!$3- 98A W-12 C 5. 21 81 11 DISCHARGE PIPE - ELBOW PT UT 131- 9aA W-13 C 5. 21 PT UT 8

st 11 DIsCHAaGE E1. BOW - FIPE ISI 98A W-14 C 5. 21 PIPE - EI. DON PT UT

^81 11 DISCHARGE 281- 98A W-15 C 5. 21 31 11 DISCHARGE ELBOW - 45 ELBOW PT UT 153- 98A W-16 C 5. 21 S! 11 DISCHARGE 45 ELBOW - PIPE PT UT ISI. 98A W-17 C 5. 21

$1 11 DISCHARGE P!PE - PIPE PT UT

!$I- 98A W-18 C 5. 21

$1 11 DISCHARGE P2PE - ELBOW PT UT ISI- 98A W-19 C 5. 21 81 11 DISCHARGE ELBOW - PIPE PT UT I5I- 98A W-20 C 5. 21

$1 11 DISCHARGE PIPE - PIPE PT UT ISI- 98A W-21 C 5. 21 SI 11 DISCHARGE PIPE

  • ELBOW PT UT ISI- 98A W 22 C 5. 21 81 11 DISCHARGE '.LBOW - PIPE PT UT

!$1* 98A W-23 C 5. 21 SI il DISCHARGE PIPE - 35 ELBcW PT UT 351* 98A W-24 C 5. 21

[. - %h SI 11 DISCHARGE 35 ELBOW - PIPE PT UT k ISI- 98A W-25 C 5. 21 81 11 DISCHARGE PIPE - 45 ELBOW PT UT 151- 9eh W-26 C 5. 21 81 11 DISCHARGE 4 5 ELBOW - PIPE PT UT ISI+ 98A W-27 C 5. 21 81 11 DISCHARGE PIPE - PIPE ~

PT UT ISI- 96A W-28 C 5, 21 81 11 DISCHADGE P!PE - RED TEE PT UT 15Ia 98A W-29 C 5. 21 81 11 DISCHARGE RED TEE - PEDUCER PT UT ISI- 988 H- 1 F-A S

B1 11 DISCHARGE BOX SUPPORT VT3 ISI* 988 H- 2 P-A SI 11 DISCHARGE BOX SUPPORT / LUGS VT3 15I- 988 W- 1 C 5. 21 SI 11 DISCHARGE RED TEE - P!PE PT UT l 151- 99B W- 2 C 5. 21 SI 17 DISCHARGE PIPE - RED TEE PT UT ISI- 988 W- 3 C 5. 21 51 11 DISCHARGE RED TEE - PIPE PT UT l ISI- 988 W- 4 C 5. 30 j SI 11 DISCHAAGE PIPE - VALVE PT '

ISI- 998 W- 5 C 5. 30 51 11 DISCHARGE VALVE - P!PE PT ISI- 988 W- 6 C 5. 21 SI 11 DISCHARGE PIPE - ELBOW PT UT 151- 985 W. 7 C 5. 21 SI 11 DISCHARGE ELBOW - PIPE PT ITI 181- 985 W- 8 C 5. 30 SI 1! DISCHARGE PIPE - OPIPICE PT ISI- 989 E- 9 C 5. 30 SI 11 DISCHARGE ORIPICE - PIPE PT ISI- 988 W-10 C 5. 21 31 11 DISCHARGE PII'E - ELBOW PT UT 1

ISI- 999 W-11 C 5. 21 i SI 11 EISCHARGE ELBOW - PIPE S PT UT 181- 988 W-12 C 5. 30

_81, 34 DISCKARGE PIPE - VALVE PT IS'.- 985 W-13 C 5. 30

'.I 11 DISCHARGE VALVE - PIPE PT Page 49

Insenice Inspection Plan and Schedule Prairie Island Nuclear Generating Plant, Unit 1 Third Ten-Year ASME See XI Code Ed.1989 Relief Schedule

)

. Item ASME Requests a System Item Description Item Number Method & Notes 95 96 l 97 l 99 XX 00l02lXX!XX 181- 968 W-34 C 5. 21 I

$1 11 DTSCHARGE P!PE - TEE PT UT 157 988 W-15 C 5. 21 SI 11 DISCHARGE TEE - PEDUCER PT UT ISI- paB W-16 C 5. 21 SI la DISCHARGE TEE - PIPE PT UT 151 988 W-17 C 5. 30 ST 11 DISCHARGE PIPE - VALVE PT 151- pac H- 1 T-A SI 11 DISCHARGE ROD / CLAMP VT3 IS1- 98C H. 2 F-A

$1 11 DISCHARGE kOD / CLAMP YT3 ISI- 99C H- 3 F-A SI 11 DISCHARGE $NUBBER VT3 ISI- 90C H- 4 F-A SI Il DISCHAPGE SUPPORT VT3 351- Dec H- 5 F-A

$1 11 DISCHARGE RIGID / BOLT VT3 ISI- 98C H- 6 F-A SI 11 DI5 CHARGE TRIPLE ROD / BOLT VT3 ISI- 96C H- 7 F-A

$1 11 D*.SCHARGE BOX HANGER VT3 ISI- 9fC H- 8 F-A S4 .,* DISCHARGE BOX HANGER VT3 ISI- 9BC H- 9 F- A SI 11 DISCHARGE SPRING / SLIDE VT3 ISI- 98C H-10 F-A

$1 11 DISCHARGE SNUBRER / CLAMP VT3 ISI. 90C H-31 F-A SI 11 DISCHARGE BOX RESTPAINT VT3 ISI- 98C W- 1 C 5. 21 SI Il DISCHARGE REDUCER - PIPE PT UT ISI- 9BC W- 2 C 5. 21 SI 11 DT5 CHARGE PIPE - ELBOW PT UT ISI- 98C W- 3 C 5. 21 51 11 DISCMARGE ELBOW - PIPE PT UT ISI- 98C W- 4 C 5. 21 51 11 DI3 CHARGE PIPE - 45 ELBOW PT UT 181 96C W- 5 C 5. 21

,SI 11 DISCHARGE 45 ELROW - PIPE PT UT ISI- 98C W- 6 C 5. 21 St 11 DISCHARGE PIPE - 45 ELB78 PT UT 181- 9BC W- 7 C 5. 21 SI 11 DISCHAPGE 45 ELBOW - PIPE PT UT ISI- 9BC W- 8 C 5. 21 SI 11 DISCHARGE PIPE - 45 ELBOW PT UT ISI- 90C W- 9 C 5. 21 SI 11 DISCHARGE 4 5 ELBOW - P!PE PT UT ISI- 98C W-10 C 5. 21 SI 11 DISCHARGE PIPE - ELBOW PT UT ISI- 98C W-11 C 5. 21 51 !! DISCHARGE ELBOW - PIPE PT UT

!$1- 99C W-12 C 5. 21 SI 11 tilSCHU GE PIPE - ELBOW PT UT ISI- Dec W-13 C 5. 21 SI 11 DISCHARGE ELBOW - PIPE PT UT ISI- 9et W-14 C 5. 21 SI 11 DISCHARGE PIPE - P!PE PT UT IS3- 9aC W-15 C 5. 30

$1 11 DISCHARGE PIPE - VALVE PT ISI- 98C W-16 C 5. 30

$1 Il DISCHARGE VALVE - PIPT. PT ISI- 96C W-17 C 5, 21 El 11 DISCHARGE PIPE - ELBOW PT UT 153- 9BC W-le C 5. 21 SI 11 DISCHARGE ELBOW - PIPE PT UT ISI- 98C W-19 C 5. 30 51 Il DISCHARGE PIPE - ORIFICE PT

  • 151- 9st ~ W-20 C 5. 30

_S1 11 DISCHARGE ORIFICE - P2PE PT ISI- 98C W-21 C 5. 21 PIPE - TEF S

_S_I_11 DISCHARGE PT UT ISI- 9ec W-22 C 5. 21 53 Il DISCHARGE TEE - REDUCER l37UT i

Page 50 m....

hservie) lispectio] Pla; cd Sched:le Prcirle Isla;d N cle'r G nerati;g Plant, Ulit 1 1Fhird 1ren-)(ear ASME See XI CUde Ed.1989 j ISO Item ASME R qu ts (j system IteIn Description Item Number Method & Notes 95l96 97 l 99 l 00 02lXX XX XX 151- 98C W-23 C 5. 21 SI 11 DISCKARGE TEE - PIPE PT UT

!$1- 98C W-24 C 5. 21 SI 11 EISCHARGE PIPE

  • ELBOW PT UT ISI- 99C N-25 C 5. 21 33 11 DISCKARGE ELBOW - PIPE PT UT ISI- 9ec W-26 C 5. 30 S

81 11 DISCHARGE PIPE - VALVE PT 151- 98C N-27 C 5. 30 SI 11 DISCKARGE VALVE - PIPE PT ISI- 9BC N-28 C 5. 21 SI 11 DISCHARGE PIPE - TEE PT UT ISI- 98C N-29 C S. 21 SI 11 DISCHARGE TEE - REDUCER PT UT ISI- 90C W-30 C 5. 21 81 11 DISCRARGE TEE - PIPE PT UT 181- 98C W-31 C 5. 30

$1 11 D!$CHAAGE PIPE - VALVE PT ISI- 99A H- 1 F-A SI 12 DISCHARGE SPRING / SLIDE /U-BOLT VT3 ISI- 99A H- 2 F-A SI 12 DISCHARGE SLIDE / U-POLT VT3

~}SI- 99A H- 3 F- A SI 12 DISCRARGE ROD / CLAMP VT3 131- 99A H- 4 F-A 51 12 DISCKARGE SEISMIC ARCH./ SADDLE VT) 181- 99A H~ 5 F- A SI 12 DISCHARGE PIPE CLAMP VT3 ISI- 99A H+ 6 F-A SI 12 DISCHAAGE SEISMIC / CLAMP / LUGS VT3 I5I- 99A W- 1 C 6. 10 51 kJ DISCHARGE PUMP - FLANGE MT

, -%s 151- 99A N- 2 C 5. 21

[ SI 12 DISCHARGE FLANGE - PIPE PT UT

'\'~~' 151- 99A N- 3 C 5. 41 21 12 DISCHARGE PIPE - WELDOLET PT 331 99A W- 4 C 5. 21

$! 12 DISCKARGE PIPE - ELBOW PT UT 181- 99A W- 5 C 5, 21 81 12 DISCRARGE ELBOW - VALVE PT UT 151- 99A N- 6 C 5. 21 SI 12 DISCHARGE VALVE - VALVE PT UT ISI- 99A W- 7 C 5. 21 51 12 DISCHARGE VALVE - ELBDW PT UT 151- 99A W- 0 C 5. 21

$1 12 DISCRARGE ELBOW - PED TEE PT UT ISI- 99A W- 9 C 5. 21 51 12 DISCHARGE RED TEE - PIPE PT UT 151- 99A N-10 C 5. 21

$! 12 DISCHARGE PIPE + VALVE PT UT 151- 99A N-11 C 5. 21 SI 12 DISCHARGE RED TEE - REDUCER PT UT ISI- 99h N-12 C 5. 21 SI 12 DISCKARGE REDUCER - PIPE PT UT 153- 9hA W-13 C 5. 21 51 12 DISCHARGE PIPE - ELBON PT UT ISI- 99A W-14 C 5. 21 SI 12 DISOKARGE ELBOW - PIPE PT UT 151* 99A W-15 C 5. ?1 SI 12 DISCHARGE PIPT - ELBON PT UT ISI- 99A W-16 C 5. 21 SI 12 DISCHARGE ELBOW - PIPE PT UT I5I- 99A W-11 C 5. 21 SI 12 DI5CKARGE P!PE - FLANGE PT UT I

151- 99A W-19 C 5. 21 ,

SI 12 DISCRARGF. FIANGE - PIPE PT UT 151- 99A W-19 C 5. 21

$1 12 DISCRARGE PIPE - ELBDW PT UT

/\ ISI- 99A W-20 C 5. 21

( ) 31 12 DISCHARGE ELSDN - PIPE PT UT

\s. e!  !$1* 99A W-21 C 5. 21 )

$! 12 DISCKARGE PIPE - ELBOW PT UT

~I II- 99A N-22 C 5, 21 Al 12 DISCHARGE ELBOW - PIPE PT UT Page 51 1

hservice hspectio2 Plaund Sched le Prairie Island Nelecr Gneratirg Plaxt, Ulit 1 Third Ten-Year ASME See XI Code Ed.1989 en ASME Relief Schedule

/ i ISO Item Requests 1 ( w/ ) System Item Description Item Number Method & Notes 95 96 97 l 99 00 02lXX XXlXX ISI. 99A W-23 C 5. 21 81 12 DI!CHAPGE PIPE - PIPE PT UT 181- 99A W-24 C 5. 21 f PIPE - ELBOW PT UT j' $1 12 DISCHARGE l

I5!- 99A W-25 C 5, 21 81 12 DISCHARGE ELBOW - PIPE PT UT

!$1- 99A W-26 C 5. 21 SI 12 DISCHARGE P2PE - ELBOW PT UT ISI- 9BA W-27 8 9. 21 ST 12 DISCHARGE ELBOW = b,LBOW PT 151- 990 H- 1 F-A

$1 12 DISCHARGE WALL LUGS VT3 153* 998 H- 2 F-A SI 12 DISCHARGE BOK HANGER VT3 ISI- 998 H- 3 F-A

$1 12 DISCHARGE BOX HANGER VT3 131- 99B H- 4 F-A S

SI 12 DISCHAPGE RIGID SUPPORT VT3 161- 99B N- 1 C 5. 21 SI 12 DISCHARGE ELBOW - BEDUCER PT UT 181- 998 W- 2 C 5. 21 El 12 DISCHAAGE REDUCER - P!PE PT UT ISI- 995 W- 3 C 5. 21

$I 12 DISCHARGE P!PE - ELBOW PT UT

!$1- 99B N- 4 C 5. 21 El 12 DISCHARGE ELBOW - PIPE PT UT ISI- 998 N- 5 C 5. 21

$1 12 DISCHARGE PIPE - ELBOW PT UT 151 998 N- 6 C 5. 21 81 72 DISCHARGE ELBON - PEN 28A-1 PT UT 151- 998 N- 7 C 5. 21 SI 12 DISCHARGE PEN 28A ELBOW PT UT ISI- 998 W- 6 C 5. 21

/

A) SI 12 DISCHARGE ELBOW - PIPE PT UT

/ IS!- 998 SI 12 DISCHARGE N- 9 PIPE - ELBOW C 5. 21 PT UT ISI* 998 N-10 C 5. 21

$1 12 DISCHARGE ELBOW - REDUCER PT UT ISI- 998 W-11 C 5. 23

$1 12 DISCHARGE REDUCER - PIPE PT UT 151- 998 W-12 C 5. 21 SI 12 DISCHARGE P!PE - ELBOW PT UT ISI- 99B W-13 C 5. 21 SI 12 DISCHARGE ELBOW - PIPE PT UT 151- 990 W-14 C 5. 21 ,

$1 12 DISCHARGE PIPE - VALVE PT UT ISI- 995 W-15 C 5. 21 S! !! DISCHARGE VALVE - ELBOW PT UT 3 1- 99B W-16 C 5. 21 SI 12 DISCHARGt ELBOW - PIPE PT UT 151- 99B W-17 C 5. 21 l SI 12 DISCHARGE PIPF - ELBON PT UT 181= 99B W-10 C 5. 21 81 12 DISCHARGE ELBOW - PIPE PT UT l ISI- 998 N-19 C 5. 21 l SI 12 DISCHARGE P!PE - REDUCER PT UT ISI- 99B W-20 C 5. 21 SI 12 DISCHARGE DEIKJCER - PEN 28A PT UT ISI-100A Ha 1 F-A SI 11 DISCHRRGE SPRING / SLIDE /SALDLE VT1 131-100A H- 2 F-A 21 11 DISCHARGE SADDLE SUPPORT YT3

!$1-100A H- 3 T-A

$1 11 DISCHARGE DOUBLE ROD / SADDLE /BA VT3 151 -1 P'W H- 4 F-A SI 11 DISCHARGE SADDLE & SEISMIC VT3 151-100A H- 5 F-A SI 11 DISCHARGE DOUHLE ROD / SADDLE /BA VT3

/ 151-100A H- 6 F-A

$I 11 DISCHARGE BOX HANGER VT3 (Ns 183-100A W. 1 C 6. 10 81 11 DISCHARGE PtMP - FLANGE MT 151-100A W- 2 C 5. 21 SI 11 DISCHARGE FLANGE - PIPE PT UT Page S2

liservice lispectin Plaund Sched:le Prairie Isla d Niclecr G=eratlig Plait, Uzit 1 Third Ten-Year ASME See XI Code Ed.1989

',m Relief Schedule

\ ISO Item ASME Requests (wr / System it.em DescE1ption item Number Method & Notes 95 96 97l99 00 02lXX 'XX XX 151-100A N- 3 C 5. 41 5! 11 DISCHARGE PIPE - WELDOLET PT b

151-100A W- 4 C 5. 23

$1 11 DISCHARGE PIPE- ELBON PT UT 181-100A N- 5 C 5. 21 8I 11 DISCHAAGE ELBON - VALVE PT UT 153-1004 Wa 6 C 5. 21 81 11 DISCHARGE VALVE - VALVE PT UT 351-100A N- 1 C 5. 21 BI 11 DISCHARGE VALVE - ELBOM PT UT 781-100A W- 8 C 5. 21 ELBON - RED TEE PT UT b

SI 11 DISCHARGE 381-100A W- 9 C 5, 21 61 11 DISCHARGE RED TEE - PIPE PT UT 181-100A N-10 C 5. 21 S

SI 11 DISCHARGE PIPE - VALVE PT UT ISI-IDOA W-11 C S. 21

$1 11 DISCHARGE VALVE - PIPE PT UT 131-100A W-12 C 5. 21 SI 11 DISCHARGE PIPE - PIPE PT UT 231-200A N-13 C 5. 21 51 11 DISCHARGE PIPE - ELBOW PT UT 13Z-100A N-14 C 5. 21 81 11 DISCHARGE ELBOW - P!PE PT UT 181-100A W-15 C 5. 21 53 11 DISCHARGE PIPE - ELBOW PT UT ISI-100A W-16 C 5. 21 51 11 DISCHARGE ELBOW = PIPE PT UT ISI-100A W-17 C 5. 21 BI 11 DISCHARGE PIPE - P!PE PT UT 151-100A W-18 C 5. 21 St 11 DISCHARGE PIPE - VALVE PT UT g 181-100A W-19 C 5. 21 RE!) TEE - REDUCER PT UT l .SI 11 DISCHARGE

\ 1$I-100A N-20 C 5. 21

$! 11 DISCHARGE REDUCER - PIPE PT UT 353-100A W-21 C 5. 21 51 11 DISCHARGE PIPE - ELBOW PT UT

!$1-100A W-22 C 5,21 SI 11 DISCHARGE ELBOW - PIPE PT UT ISI-100A W-23 C 5. 21 81 11 DISCHARGE P!PE - ELBON PT UT 151-100A M-24 C 5. 21 SI 11 DISCHARGE ELBOW - PIPE PT UT 151-200A W-25 C 5. 21 SI 11 DISCHARGE PIPE - FLANGE PT UT ISI-100A W-26 C 5. 21 51 11 DISCHARGE FLANGE - PIPE PT UT 331-100A W-27 C 5. 21 e SI 11 DISCHARGE PIPE - E1 BOW PT UT 151-100A u-29 C 5. 21 31 11 DISCHARGE ELBOW - P1PE PT UT 151-100A W-29 C 5. 21 SI 11 DISCHARGE PIPE - ELBON PT UT IS!-100A N-30 C 5. 21 SI 11 DISCHARGE ELBON - PIPE PT UT 151-1008 H- 1 F-A 51 11 DISCHARGE ROD / CLAMP VT3 ISI-100B H- 2 F- A

$1 11 DISCHARGE WALL LUGS VT3 151-1000 H- 3 P- A

$1 11 DIRCHARGE BOX HANGER VT3 ISI-100B H- 4 T-A St 11 DISCHARGE BOX HANGER VT3 _

151-1005 Ha 5 T-A

_SI 11 DISCHARGE BOX HANGER VT3 151-1005 H- 6 F-A SI 11 DISCHARGE BOX HANGER VT3

[h ISI-100B H- 7 F- A f ) 33 11 DISCHARGE ROD /CLRMP VT3 k.j 181-1003 W- 1 C 5. 21 81 11 DISCHARGE PIPE - ELBOW PT UT 153-1008 W- 2 C 5. 21 51 Il DISCHARGE ELBOW - P1PE PT UT Page 53

- IIservice lispection Plaa md Sched le

- Pr:Irie Islard N:cle:r GeaIrati:g Platt, Unit 1 Third Ten-Year

. ASME See XI Code Ed.1989 '

ISO Item .

ASME qu ts

'J' System Itein Description Iteto Number Method & Notes 95: 96 97 99 00l02lXX XX XX IS3-100B W- 3 C 5. 21 PT UT b

's! 11 DISCHRRGE PIPE - (S ELBOW 181-1005- . W- 4 C 5. 21 SI 11 DISCHARGE- 45 ELBOW

  • P1PE - PT UT 151-1005 Wa $ C 5. 21 SI 11 DISCHARGE' P1PE - ELBOW PT UT 181-100B W- 6 C 5. 21 51 11 DISCHARGE ELBOW - PIPE PT UT 151 100B W- 7 C 5. 21 51 11 DISCHARGE - P2PE - ELBOW PT UT 18J-1005 W- 9 C $. 21

$! 11 DISCHARGE ELBOW - PEN 288- 1 , .

PT UT 181-100B W- 9 . C 5. 21 31 11 DISCHARGE PEN 28B ELBOW PT UT 181-1000 W-10 C 5. 21 81 11 DISCHARGE ELBOW - PIPE PT UT 331-100B W-11 C S. 21 81 11 DISCHARGE P!PE = 4b ELBOW PT UT 151-200B W-12 C S. 21 SI 11 DISCHARGE 4% ELBOW - PIPE PT UT 181-1000 W-13 C 5. 21 ST 11 DISCHARGE PIPE

  • ELBOW PT UT 151-1008 W-14 C S. 21

$1 11 DISCHARGE ELBOW PIPE PT UT 151-100B W-15 C S. 21 51 11 DISCHARGE PIPE - ELBOW PT UT 151-1005 W-16 C 5. 21 51 11 DISCHARGE ELBOW - PIPE PT UT 181-1005 W-11 C 5. 21 81 11 DISCHARGE PIPE - ELBOW PT UF ISt 1008 W-18 C 5. 21 81 Il DISCHARGE ELBOW = P!PE PT UT IS!-1003 W-19 C 5. 21 51 11 DISCHARGE P1PE - ELBOW PT UT 281-1008 W-20 C 5. 21 SI 11 DISCHARGE ELBOW - P!PE P's UT  !

181-1005 W-21 C S. 21

$! 11 DISCHARGE PIPE

  • ELBOW PT UT j 15I-100B W-22 C 5. 21 81 11 DISCHARGE ELBOW - PIPE PT UT 151-1005 W-23 C 5. 21 SI 11 DISCHARGE P1PE - ELBOW PT UT f W-24 C 5. 21. .

18I*100B

$1 11 DISCHARGE ELROW = PIPE PT UT 15I-1008 W-25 C S. 21 q

$1 11 DISCHARGE P!PE - ELBOW PT UT .

153-100s W-26 C 5. 21 .

Bf 11 DISCHARGE ELBOW

  • VALVE PT UT l 18I-1008 W-27 C 5. 21 St 11 DISCHARGE VALVE - PIPE PT UT 153-100s W-28 C 5. 21

$1 11 DISCHARGE P2PE - ELBOW PT UT 151-2006 W-29 C S. 21 81 11 DISCHARGE ELBOW - PIPE PT UT 181-1008 - W-30 C S. 21 SI 11 D15 CHARGE PIPE - ELBOW PT UT 181-1008 W-11 C 5. 21 81 11 DISCHARGE ELBOW - PIPE PT UT 131-2005 W-32 C 5. 21 51 11 D18 CHARGE P2PE - REDUCER PT UT 151-1905 W-33 C 5, 21 81 11 D15 CHARGE REDUCER - PEN 26A PT UT -

151*101 H- 1 F- A St TEST RETURN BOX BUPPORT VT3 151-101 H+ 2 F- A 51 TEST RETUPN SPRING /CLAHP VT3 131-101 H- 3 P-A SI TEST RETURN BENT BAR S0PPORT VT3 151-101 W- 1 C 5. 21 g St TEST RETURN WELDOLET a PIPE PT UT j

\ 151-101- W- 2 C 5. 30 g 'l B1 TEST RETURN PIPE - ELBOW PT 15I+101 W- 3 C 5. 30

$1 TEST R1' TURN' ELBOW - PIPE PT -

Page 54 i

. _I nervice Igspectiom Plalicid Schedule .

i'rairie Isind NIclear Grarati:rg Plan U; tit 1 )

i Third Ten-Year  !

. ASME See XI Code Ed.1989 Item ASME * *

} _ ISO' System Item Description Item Number Method R sts 95 96 97 4

& Notes 99 00 02 XX XX XX 151-101 . W- 4 C S. 30 j St TEST RETURN PIPC - ELBOW PT 153-101 W4 S C S. 30 e

'$$ TEST RETURN ELBOW - P!PE PT 151-101 W- 6 C S. 30 i St TEST RETURN P2PE - ELBOW PT 181-101 W- 1 C S. 30

'81 TEST prTURN ELBOW - P1PE PT 181-101 W- 0 C S. 21 'j

$1 TEST RETURN PIPE a RED TEE PT UT

!$1-101 W- 9 C S. 21 81 TEST RETURN RED TEE - ORIP1CE PT UT j 153-101 W-10 C S.21 j al TEST RETURN ORIFICE = PIPE PT UT 15I-101 W-11 C S. 30 i 51 TEST RET'JRN P!PE

  • VALVE PT ;i 181-101 W-12 C S. 30 *

$1 TEST RETURN VALVE a PIPE PT j 181-101 W-13 C S. 30 l 81 TEST RETURN PIPE = VALVE PT 181-101 W-14 C S. 30 51 TEST RETURN VALVE a PIPE PT ,

181-101 W-15 C S. 30 31 TEST RETURN P!PE - TEE PT 181-101 W-16 C S. 30 ',

St TEST RETURN TEE = REDUCER PT 181-101 W-17 C S. 30 f St TEST RETUPN TEE - PIPE PT ISI-101 W-18 C 5. 30 31 TEST RETURN PIPE

  • TEE PT f 181-102 H- 1 T-A St TEST RETURN BENT BAR RESTRAINT VT3  ;

151-102 H- 2 F-A .}

S1 TEST RETURN ROD / CLAMP VT3 j 151-102 W. 1 C S. 21. g SI TE87 RETURN WELDOLET - PIPE PT UT 151-102 W- 3 C S. 30 ~f 81 TEST RETURN PIPE- ELBOW PT {

15I-102 W- 3 C S. 30 ,

St TEST RETURN ELBOW - PIPE PT .l 181-102 W- 4 C S. 30  ;

5! TEST RETURN PIPE - ELBOW PT .

,181-102 W- S C S. 30 g I

81 TEST RETURN ELBOW

  • PIPE PT 151-102 W- 6 C S. 30 4 81 TEST RETURN P!PE - ELBOW PT 153-102 W- T C S. 30 f 81 TEST RETURN ELBOW
  • PIPE PT 181-102 W- 0 C S. 21  ;

$1 TEST RETURN FIPE - RED TEE PT UT J 151-102 ,

W9 C S. 21  !

St TEST RETURN RED TEE

  • ORtr!CE ' PT UT 131-102 W-10 C S. 21 ,

51 TEST RETURN ORIFICE - PIPE PT UT j 132 102 W-11 C S. 30 .

I 81 TEST PETURN PIPE + 45 ELBOW PT 181-102 W-12 C S. 30

$! TEST RETURN 45 ELBOW - PIPE PT 181-102 W-13 C S. 30 81 TEST BETURN PIPE - 45 ELBOW PT i 181-102 W-14 .

C 5. 30 l

-$1 TEST RETUPR 45 ELBOW

  • P!PE PT 181-102 W-16 C 5. 30 St TEST RETURN PIPE
  • VALVE PT ISI-102 W-16 C S. 30 SI TEST RETURN VALVE - P2PE PT 151-102 W-1T C S. 30 51 TEST RETURN PIPE - VALVE PT 181-102 W-10 C S. 30

_S!_ TEST RETURN VALVE

(  ; 181-102 51 TEST RETURN W-19 PIPE - TEE C 5. 30 PT 151*102 W-20 C S. 30

$1 TEST RETURN TEE = REDUCER PT

.l Page- 55

I service IIspectio2 Plam c d Sched:le Prairie IslaId N:cle:r Ce.xratirg Pla;t, Uzit 1 Third Ten-Year ASME See XI Code Ed.1989

[ ISO Item ASME Req sts (j system Item Description Item Number Method & Notes 95 96 97 l 99 00 02lXX- XX XX

!$3-102 N-21 C 5. 30 l SI TEST RETURN TEE - PIPE PT 131-102 N-22 C 5. 30 51 TEST RETURN PIPE - TEE PT 131-103 H- 1 F-A 31 TEST RETURN ROD / CLAMP VT3 151-103 H- 2 F-A ,

81 TEST RETURN BOX SUPPORT VT) ]

l 153-103 N- 1 C 5. 30

$2 TEST RETURN REDUCER - TEE PT 251-103 N- 2 C 5. 30 51 TEST RETURN TEE - PIPE PT 151-103 N- 3 C 5. 30

$1 TEST RETURN PIPE - TEE PT 331-103 N- 4 C 5. 30 81 TEST RETURN TEE - PIPE PT 151-103 N- 5 C 5. 30 SI TEST RETUPN P!PE- ELBOW PT ISI-103 W- 6 C 5. 30 8! TEST RETURN ELBCN - PIPE PT 131-103 W- 7 C 5. 30 SI TEST RETURN PIPE - ELBON PT 151-103 N- 5 C 5. 30 St TEST RETURN ELBON = PIPE PT 151-103 W- 9 C 54 30

$1 TEST RETURN PIPE - VALVE PT 151-103 N-10 C 5. 30 BI TEST RETURN VALVE - PIPE PT 181-103 N-11 C 5. 30 ,

St TEST PETURN PIPE - VALVE PT XH-106-129 FN-53 HELB S

FEEDWATER PUMP - PIPE f

'g- XH-106-129 FW-95 HELB t TEEDWATER P2PE - TEE XH-106-242 MS-26 L8 UD MELB O

MAIN ETEAM 'A' P2PE - PIPE XH-106-242 NS-38 LS UD HELB ELBOW - PIPE b

MAIN $TLAM 'A' keep me keep me keep me g,,

keep me keep me f

l' V

Page 56