Issue date | Title | Topic | |
---|---|---|---|
ML20154C703 | 29 September 1998 | Notice of Violations from Insp on 980323-0410 & 0622-25. Violations Noted:Without Prior Commission Approval & Without Performing Written Safety Evaluations,Licensee Made Changes Described in USAR Re Unreviewed Safety Question | |
ML20236T143 | 23 July 1998 | Notice of Violation from Insp on 980531-0711.Violation Noted:On 980604,technicians Placed Heavy Door & Frame in Control Room Equipment Cabinet Adjacent to Train a Protection Sys Logic Cabinets | |
ML20249A034 | 12 June 1998 | Notice of Violation from Insp on 980419-0530.Violation Noted:On 980317,electricians Removed Breaker NG001AGF1 While Clearance Order 98-0250-EF Relied on Procedure Mge EOOP-11 to Establish Isolation of Breaker from Bus | Grab sample |
ML20248B647 | 27 May 1998 | Notice of Violation from NRC Investigation on 961224-980206. Violation Noted:On 961211,S Buehne Intentionally Submitted Info to Licensee Known to Be Inaccurate & Info Submitted to NRC | |
ML20216A888 | 6 May 1998 | Notice of Violation from Insp on 980308-0418.Violation Noted:On 980410,an Accessible High Radiation Area on Radwaste Bldg Roof W/Dose Rate of Approx 400 Mr/H at 18 Inch Was Not Posted as High Radiation Area | High Radiation Area |
ML20217E085 | 23 April 1998 | Notice of Violation from Insp on 970624-27.Violation Noted: Licensee Identified That Unauthorized Work, (Work Outside Scope of Assigned Work Package Tasks & Applicable Procedures) Performed & Not Documented | |
ML20217M529 | 2 April 1998 | Notice of Violation from Insp on 980316-20.Violation Noted: Inspector Identified Seven Radioactive Matl Containers Located in Radwaste Storage Bldg | |
ML20217H643 | 1 April 1998 | Notice of Violation from Insp on 980125-0307.Violation Noted:Operators Failed to Log Entry Into Action Statement for TS 3.1.3.5 Shutdown Rods Inserted Beyond Rod Insertion Limits | |
ML20216G566 | 13 March 1998 | Notice of Violation from Insp on 980223-27.Violation Noted: Proper Surveys Were Not Performed to Prevent Unconditional Release of Radioactive Matls Greater than Release Criteria | |
ML20199H914 | 29 January 1998 | Notice of Violation from Insp on 971214-980124.Violation Noted:Technicians Failed to Follow Procedure Steps by Removing Vendor Wire & Reversed Variable Transformer Leads | |
ML20198A751 | 29 December 1997 | Notice of Violation from Insp on 971102-1213.Violations Noted:On 971113,inspectors Noted That Containment Coordinator Had Been Assigned Duty of Closing Containment Hatch While Retaining Balance of Coordinator Duties | |
ML20199K296 | 25 November 1997 | Notice of Violation from Insp on 970922-1102.Violation Noted:Operators Used Markings on Drawing EID0003 as Operator Aid W/O Documented Approval of Shift Supervisor & Root Valves Indicated on Attachment C Were Operated | |
ML20199F696 | 14 November 1997 | Notice of Violation from Insp on 971020-24.Violations Noted: Snubbers 17994 & 20231 Did Not Meet Unconditional Release Criteria & Were Taken Outside Normally Established Radiological Controlled Area W/O Using Form RPF 02-515-02 | High Radiation Area |
ML20217F191 | 2 October 1997 | Notice of Violation from Insp on 970810-0920.Violation Noted:On 970828,worker Entered Radiologically Controlled Area W/O Electronic Dosimetry Required by Radiation Work Permit 970009 | |
ML20210N682 | 21 August 1997 | Notice of Violation from Insp on 970629-0809.Violation Noted:Worker Entered Radiologically Controlled Area W/O Neutron Dosimetry Required by Radiation Work Permit 970003 | |
ML20140E831 | 6 June 1997 | Notice of Violation from Insp on 970406-0517.Violations Noted:Security Escorts Escorted More than Five Visitors Into Vital Areas W/O Specific Approval of Vice President of Plant Operations or Designee | |
ML20140E718 | 25 April 1997 | Notice of Violation from Insp on 970223-0405.Violation Noted:On 970227,radwaste Operators Did Not Follow Proper Procedures & Disregarded Panel Alarm When They Were Instructed by Supervisor to Exceed Precautionary Fill Limit | |
ML20137N091 | 3 April 1997 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Corrective Actions in Response to QA Audit K381 Finding Failed to Identify & Correct Conflict Between TS Clarifications & TS | |
ML20137M586 | 3 April 1997 | Notice of Violation from Insp on 961007-25.Violation Noted: Licensee Corrective Actions in Response to Quality Assurance Audit K381 Findings,Failed to Identify & Correct Conflicts Between TS Clarifications & TS | Condition Adverse to Quality |
ML20137M341 | 2 April 1997 | Notice of Violation from Insp on 970127-0214.Violation Noted:Underlying Design Error Was Not Promptly Corrected | Condition Adverse to Quality |
ML20136E259 | 10 March 1997 | Notice of Violation from Insp on 970111-0222.Violation Noted:On 960728,shift Supervisor Logged Failure of Ci Valve Ef HV0034 to Close on Demand,But Failed to Recognize That Failure Resulted in Entry Into TS Action Statement 3.6.3 | |
ML20147B768 | 30 January 1997 | Notice of Violation from Insp on 961201-970111.Violation Noted:On 961206,shift Supervisor Documented Operability Determination for turbine-driven Auxiliary Feedwater Pump Identifying Governor Oil Result | |
ML20133C100 | 31 December 1996 | Notice of Violation from Insp on 961007-11 & 21-25. Violations Noted:Incorrect TS Clarifications Re 10CFR50.59, Failure to Perform Required Insvc Insp & Testing & Operating Facility Differently than Described in Updated SAR | |
ML20132F193 | 13 December 1996 | Notice of Violation from Insp on 961020-1130.Violation Noted:Sys Engineer Provided Operability Recommendation W/O First Properly Identifying Leaking Equipment & Evaluating Effect & Failed to Establish/Maintain Procedure Stn FP-204 | Fire Protection Program |
ML20134G300 | 7 November 1996 | Notice of Violation from Insp on 960908-1019.Violation Noted:On 960323,w/plant in Mode 5,operators Discovered SI Pump Discharge Valves EM HV-8802A & 8821A Handswitches Tagged Do Not Operate Closed But Still Power Available | |
ML20059C309 | 29 December 1993 | Notice of Violation from Insp on 931024-1204.Violations Noted:Failure to Maintain Cognizance of Control Panels & Permits & Failure to Properly Restore Clearance Orders | |
ML20058E277 | 19 November 1993 | Notice of Violation from Insp on 930912-1023.Violation Noted:Licensee Determined Personnel Failed to Position & Verify That Actual Valve Positions for Boric Acid Filter Inlet & Outlet Reflected Required Reach Rod Position | Boric Acid |
ML20057G189 | 15 October 1993 | Notice of Violation from Insp on 920830-1010.Violation Noted:During Period of May - Aug 1992,records Were Identified as Being Incomplete or Inaccurate | |
ML20057G118 | 14 October 1993 | Notice of Violation from Insp on 930920-24.Violation Noted: During 930920-24,inspectors Determined That Weakness Had Not Been Corrected | |
ML20057E289 | 4 October 1993 | Notice of Violation from Insp on 930809-27.Violation Noted:Seven Failures of Bellows in Residual Heat Valves EJ8856A & -B Since 1984 Not Resolved | |
ML20058M761 | 1 October 1993 | Notice of Violation from Insp on 930801-0911.Violation Noted:Operators Started Safety Injection Pump W/O Starting Component Cooling Water Pump on 930813 | |
ML20057C224 | 21 September 1993 | Notice of Violation from Insp on 930823-27.Violation Noted: Unescorted Access to Protected or Vital Areas for Contractor Personnel Who Terminated Employment at Facility for Period 930101-0801 Had Not Been Rescinded as Required | |
ML20128D557 | 1 February 1993 | Notice of Violation from Insp on 921122-930102.Violation Noted:Failure to Properly Implement Procedure & Inadequate Spent Fuel Pool Bridge Crane Operating Procedure | |
ML20126A499 | 11 December 1992 | Notice of Violation from Insp on 921011-1121.Violation Noted:Licensee Failed to Change Alr OO-O47E to Provide Alternate Method of Draining Tank | |
ML20125C662 | 7 December 1992 | Notice of Violation & Proposed Imposition of Civil Penalty from Insp on 920921-1006.Violation Noted:While Implementing WR 51543-92,personnel Expanded Scope of Work Being Performed W/O Revising WR 51543-92 to Provide Further Directions | |
ML20197H646 | 9 November 1990 | Notice of Violation from Insp on 900926-1005.Violation Noted:Corrective Action Program Did Not Assure That Nonconforming Condition Potentially Affecting turbine-driven Auxiliary Feed Pump Was Promptly Reported & Corrected | Unanalyzed Condition |
ML20062D002 | 19 October 1990 | Notice of Violation from Insp on 900801-0914.Violation Noted:Test of Main Generator Voltage Regulator Performed W/O Procedure | |
ML20059N313 | 1 October 1990 | Notice of Violation from Insp on 900701-31.Violation Noted: Individual Assumed Supervising Operator Watch W/O Having Performed Five 12-h Shifts in Preceeding Calendar Yr | |
ML20058P249 | 13 August 1990 | Notice of Violation from Insp on 900507-11 & 0629-0703. Violation Noted:Inadequately Adjusted Detection Aids Sys | |
ML20056A288 | 31 July 1990 | Notice of Violation from Insp on 900601-30.Violations Noted: Corrective Action Specified in LER 90-004 Not Appropriate to Reduce Probability of Similar Events Occuring in Future & Strip Charts Did Not Reflect Real Time | |
ML20058K368 | 26 June 1990 | Notice of Violation from Insp on 900514-18.Violation Noted: Insufficient Radiological Emergency Response Training Which Could Result in Improper Emergency Classifications &/Or Protective Action Recommendations to Offsite Authorities | |
ML20246P201 | 15 May 1989 | Notice of Violation from Insp on 890401-30.Violation Noted: Corrective Actions Not Effective in Precluding Repetition of Event | Ultimate heat sink |
ML20245J403 | 1 May 1989 | Notice of Violation from Insp on 890201-28.Violation Noted: Inoperable Fire Barrier,Failure to Lock Valve in Accordance W/Procedure & Failure to Update Drawing | Fire Barrier Fire impairment Fire Protection Program |
ML20245E926 | 21 April 1989 | Notice of Violation from Insp on 890313-17.Violation Noted: Seven Individuals Left Util W/O Receiving Exit Whole Body Count & No Record Included in Their Exposure History File Indicating Attempt Made to Contact Them to Return for Count | |
ML20245A560 | 13 April 1989 | Notice of Violation from Insp on 890306-10.Violation Noted: Fire Hazards Analyses for Plant Mod Request 2206, Auxiliary Bldg Fire Protection Sys Did Not Include Consideration of Radiation Release Potential Under Stated Condition | Fire Protection Program |
ML20247A787 | 15 March 1989 | Notice of Violation from Insp on 890213-17.Violation Noted: Licensee Installed Temporary Jumper Across Cell 10 of Station Battery NK12 & No Safety Evaluation Provided | Temporary Modification |
ML20195E059 | 31 October 1988 | Notice of Violation from Insp on 880919-23.Violation Noted: Numerous Analytical Results for Various Chemical Parameter Analyses Performed by Technicians on Lab Analytical Accuracy cross-check Program Stds from 870710 to 880720 Unacceptable | |
ML20195D930 | 28 October 1988 | Notice of Violation from Insp on During Sept.Violations Noted:Failure to Cycle During Initial Quarterly Surveillance Test Attempt Because Yellow Train four-way Valve Did Not Operate | |
ML20195B313 | 21 October 1988 | Notice of Violation from Insp on 880912-16.Violations Noted:Alarms on Several Eberline AMS-3 Continuous Airborne Radioactivity Monitors Incorrectly Set High & Failure to Leak Test Four Sr-90 Sources for Period Exceeding 18 Months | |
ML20205C291 | 19 October 1988 | Notice of Violation from Insp on 880606-17.Violations Noted: Procedures & Instructions Provided to Maint Personnel for Component Cooling Water Pump Maint Activity Did Not Include Appropriate Cautions or Details for Removal of Bearing | Safe Shutdown Fire Barrier Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |