Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23257A24119 September 2023Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1Anticipated operational occurrence
ML23181A03411 July 2023Summary of Classification Meeting with TMI-2 Solutions, LLC Regarding the Process for Consultation Under Section 106 of the National Historic Preservation Act of 1966 as Related to the Historic and Culture Resources Review License Amendment
ML23047A38221 March 2023Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting
ML22215A1919 August 2022Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion TimesProbabilistic Risk Assessment
FLEX
Large early release frequency
Offsite Circuit
ML22147A0936 June 20222021 Annual Assessment Public Meeting SummaryPandemic
Coronavirus
COVID-19
ML22151A1302 June 2022May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor VesNondestructive Examination
ML22125A2459 May 2022May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis
ML22003A05610 January 2022Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1
ML21323A0476 December 2021Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors
ML21288A03918 October 2021September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor
ML21181A3351 July 2021June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application ProjectProbabilistic Risk Assessment
ML21158A2238 June 2021Meeting Summary for Ticap Workshop 3Probabilistic Risk Assessment
Maintenance Rule Program
ML21140A38924 May 2021Riv Column 1 EOC 2020 Public Meeting SummaryCoronavirus
COVID-19
ML21132A29514 May 2021Summary of Public Meeting to Discuss Technology Inclusive Content of Application ProjectProbabilistic Risk Assessment
Maintenance Rule Program
ML21117A0265 May 2021Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate
ML20337A1578 December 2020Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2
ML20287A40126 October 2020Summary of September 17, 2020, Meeting with Entergy to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Request to the Extend Allowable Outage Time for the Emergency Cooling Pond
ML20260G99916 September 2020Summary of August 4, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Regarding Adoption of 10 CFR 50.69Probabilistic Risk Assessment
ML20189A2837 July 2020Summary of Region IV Annual Assessment Public MeetingCoronavirus
ML20153A2254 June 2020April 29, 2020, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed Relief Request Use of Carbon Fiber Reinforced Polymer Piping for Underground Service Water Piping at Arkansas Nuclear One, Units 1 and 2
ML19326A3153 December 2019Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing RequirementsAnchor Darling
ML19182A03310 July 2019Summary of Teleconference with Entergy Operations, Inc. Regarding Proposed License Amendment Request Revised Fuel Handling Analysis and Adoption of Various TSTF Travelers for Arkansas Nuclear One, Unit 2
ML19191A1889 July 2019Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary
ML19162A02721 June 2019Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief ValvesIncorporated by reference
ML19036A8837 February 2019Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879
ML18354B1712 January 2019Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines
ML18325A17128 November 2018Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation AreasHigh Radiation Area
ML18176A13121 June 2018Summary of Annual Assessment Meeting with Entergy Operations, Inc., Regarding 2017 Performance of Arkansas Nuclear One
ML18120A1771 May 2018Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization StaffingPower change
ML18107A49727 April 2018April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements
ML18108A06518 April 2018Annual Assessment Meeting Summary and Attendance List 2018Open House
ML18099A07116 April 2018March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control ProgramSurveillance Frequency Control Program
Backfit
ML17353A15422 December 2017Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060)
ML17132A25919 May 2017TMI Annual Assessment Meeting (4-20-17) SummaryOpen House
ML16228A06215 August 2016Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, FloodinTornado Generated Missile
ML16109A36418 April 2016Summary of Meeting to Discuss Supplemental Inspection Results and Annual Assessment Meeting with Entergy Operations Inc. Regarding 2015 Performance of Arkansas Nuclear One
ML16085A3296 April 2016Summary of March 22, 2016, Meeting with Exelon Generation Company, LLC, on Proposed License Amendment Request to Adopt ANSI 3.1-2014 Operating Training Standards
ML16091A07831 March 2016Annual Assessment Meeting Summary on 03/23/2016Open House
ML16040A21811 February 2016January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing ManagersProbabilistic Risk Assessment
ML15348A1886 January 2016Summary of October 28, 2015, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc. to Discuss Flood Analysis Associated with Arkansas Nuclear One,
ML15350A19630 December 2015Summary of the Conference Call Regarding Fall 2015 Steam Generator Tube Inservice Inspection
ML15267A41824 September 2015Summary of Meeting to Discuss Arkansas Nuclear One Performance Improvement
ML15225A25414 August 2015Summary of 4/20-23/2015 Audit in Support of Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition)Safe Shutdown
Probabilistic Risk Assessment
ML15132A17521 May 2015Summary of Annual Assessment Meeting with Entergy Operations Inc., Regarding ANO 2014 Performance
ML15089A16427 April 2015Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis
ML15104A63814 April 2015Summary of Annual Assessment Meeting - Three Mile Island Nuclear Station, Unit 1Open House
ML15007A47815 January 2015Summary of July 15-18, 2013, Arkansas Nuclear One, Unit 2, Audit Associated with License Amendment Request to Transition to National Fire Protection Association Standard 805Safe Shutdown
Probabilistic Risk Assessment
Multiple Spurious Operation
Maintenance Rule Program
Fire Protection Program
ML14356A17222 December 2014Summary of Site Audit to Support the Review of a License Amendment Request for Arkansas Nuclear One, Unit 2 to Transition to the National Fire Protection Association (NFPA) Standard 805 Fire Protection Licensing BasisSafe Shutdown
Probabilistic Risk Assessment
Multiple Spurious Operation
Maintenance Rule Program
Fire Protection Program
ML14304A78314 November 2014Public Meeting with the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Wate
ML14197A58318 September 2014Summary of the June 19, 2014, Category 1 Public Meeting with Entergy to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Tear Task Force Recommendation 2.1Safe Shutdown Earthquake