ML17132A259

From kanterella
Jump to navigation Jump to search
TMI Annual Assessment Meeting (4-20-17) Summary
ML17132A259
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/19/2017
From: Silas Kennedy
Division Reactor Projects I
To:
Kennedy S
Shared Package
ML17079A152 List:
References
MN-010
Download: ML17132A259 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 May 8, 2017 MN-010 MEETING

SUMMARY

LICENSEE: Exelon Generation Company, LLC FACILITY: Three Mile Island Nuclear Station, Unit 1

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 20, 2017, from 4:30 p.m. to 6:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Londonderry Township Municipal Building in Middletown, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Three Mile Island, Unit 1, for 2016.

A notice of the open house was issued on March 23, 2017, and was posted on the NRCs external (public) Webpage. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17079A152.

ADAMS is accessible from the NRCs Webpage at http://www.nrc.gov/reading-rm/adams.html.

The NRC displayed poster boards and was available to discuss its assessment of the safety performance of Three Mile Island, Unit 1, for the period of January 1 through December 31, 2016, as documented in our letter dated March 1, 2017, (ADAMS Accession No. ML17058A346). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Three Mile Island, Unit 1 can be found on the NRC's website at https://www.nrc.gov/reactors/operating/oversight.html Members of the public attended the open house and were offered the opportunity to question the NRC regarding Three Mile Islands performance and the role of the agency in ensuring safe plant operations.

________/RA/____________

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects

ML17132A259 Non-Sensitive Publicly Available SUNSI Review Non-Publicly Available Sensitive OFFICE RI/DRP RI/DRP NAME SShaffer SKennedy DATE 05/01/17 05/08/17