Summary of Annual Assessment Meeting - Three Mile Island Nuclear Station, Unit 1
ML15104A638
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/14/2015
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To:
KENNEDY, SR
Shared Package
ML15049A481 List:
References
Meeting Notice No. 2015-006
Download: ML15104A638 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 14, 2015 MEETING

SUMMARY

LICENSEE:

Exelon Generation Company, LLC FACILITY:

Three Mile Island Nuclear Station, Unit 1

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 7, 2015, at 5:30 pm to 7:00 pm, the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Londonderry Township Municipal Building in Middletown, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Three Mile Island, Unit 1, for 2014.

A notice of the open house was issued on March 23, 2015 and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15082A128.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC displayed poster boards and was available to discuss its assessment of the safety performance of Three Mile Island, Unit 1, for the period of January 1 through December 31, 2014, as documented in our letter dated March 4, 2015 (ADAMS Accession No. ML15062A402). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Three Mile Island, Unit 1 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and members of the media attended the open house and were offered the opportunity to question the NRC regarding Three Mile Islands performance and the role of the agency in ensuring safe plant operations.

/RA/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects

ML15062A402). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Three Mile Island, Unit 1 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and members of the media attended the open house and were offered the opportunity to question the NRC regarding Three Mile Islands performance and the role of the agency in ensuring safe plant operations.

/RA/

Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Distribution w/encl:

D. Dorman, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP R. Lorson, DRS J. Trapp, DRS S. Kennedy, DRP C. Bickett, DRP B. Bollinger, DRP D. Werkheiser, DRP, SRI J. Heinly, DRP, RI A. Diaz, DRP, AA K. MorganButler, RI, OEDO RidsNrrPMThreeMileIsland Res RidsNrrDorlLpl1-2 Res ROPReports Res DOC NAME: G:\\DRP\\BRANCH6\\Communications\\Public Meetings\\Annual Assessment Meetings\\2015\\TMI\\

TMI Annual Assessment Meeting Summary 2015.docx ADAMS Accession No.: ML15104A638 SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett /CAB SKennedy / SRK DATE 04/13 /15 04/14/15