Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217H571 | 15 October 1999 | Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed | Thermal fatigue |
ML20210P161 | 4 August 1999 | Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities | |
ML20209G697 | 16 July 1999 | Summary of 990624 Meeting with Util in Rockville,Md to Discuss Plant License Renewal Program.List of Meeting Attendees & Presentation Matls Discussed at Meeting Encl | |
ML20196J235 | 29 June 1999 | Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl | |
ML20207H353 | 14 June 1999 | Summary of 990317 Meeting with SCE Re Issues Staff Identified in Review of 980910 License Amend Application & Exemption Request to Remove Hydrogen Monitoring & Control Sys from SONGS Licensing Basis.Meeting Attendee List Encl | Exemption Request Fuel cladding |
ML20198G550 | 18 December 1998 | Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl | Enforcement Discretion Temporary Modification Backfit |
ML20155H393 | 2 November 1998 | Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl | Coatings Temporary Modification Process Control Program Fire Protection Program |
ML20154P901 | 14 October 1998 | Summary of 980921 Meeting W/Util to Discuss FPC Plans to Modify Emergency Feedwater Sys & High Pressure Injection Sys to Resolve Previously Identified Design Issues Re DG Loading & Operator Burden.List of Attendees Encl | |
ML20154C477 | 2 October 1998 | Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling | Anticipated operational occurrence Recently irradiated fuel |
ML20153H494 | 24 September 1998 | Summary of 980818 Meeting with Util in Rockville,Md to Discuss Plant Hatch License Renewal Process.List of Meeting Attendees & Copy of Presentation Matl Discussed at Meeting, Encl | Aging Management |
ML20151X001 | 10 September 1998 | Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl | |
ML20237E027 | 25 August 1998 | Summary of 980625 Meeting W/Entergy Operations,Inc to Discuss Bulletin 96-003 Re Installation of ECCS Suction Strainer in Ninth Refueling Outage for Plant.List of Attendees & Licensee Handout | |
ML20236V076 | 28 July 1998 | Summary of 980724 Meeting W/Fpc Re FPC Plans Related to Qualification of Large Bore safety-related Piping,Including Schedules for Completion of Various Aspects of Project. List of Meeting Attendees & Copies of Meeting Handouts Encl | |
ML20236S911 | 22 July 1998 | Summary of 980617 Meeting W/Florida Power Corp Re FPC Plans for Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis.List of Attendees & Meeting Handouts Encl | |
ML20236M050 | 8 July 1998 | Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl | |
ML20236F817 | 24 June 1998 | Summary of 980331 Meeting W/Util to Brief NRC on Licensee Risk Mgt of Upcoming Ninth Refueling Outage.List of Attendees & Handouts Encl | |
ML20249A638 | 15 June 1998 | Summary of 980604 Meeting W/Listed Attendees in Rockville,Md to Discuss Containment Analysis for Extended Power Uprate for Plant,Units 1 & 2.Licensee Slides Encl | Coatings Power Uprate |
ML20236F698 | 11 June 1998 | Summary of 980513 Meeting W/Util at Crystal River Site Re Endangered & Threatened Species Info & Recent Developments at Crystal River Site.List of Attendees,Meeting Handouts & FPC Sea Turtle Rescue & Handling Guidance,Encl | |
ML20216B855 | 7 May 1998 | Summary of 980429 Meeting W/Southern California Edison in Rockville,Maryland Re Proposed Amend to TS to Allow Operation of Plant at Reduced Tcold in Reactor Coolant Sys. W/Meeting Slides & List of Meeting Attendees | |
ML20217K346 | 24 April 1998 | Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl | |
ML20217K514 | 24 April 1998 | Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl | |
ML20217F481 | 26 March 1998 | Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl | |
ML20216F990 | 13 March 1998 | Summary of 980225 Meeting W/Licensee to Discuss Issues Related to Review of Licensee IPE Submittal.List of Attendees Encl | Internal Flooding |
ML20216C647 | 5 March 1998 | Summary of 980123 Meeting W/Entergy Operations,Inc Re EP Changes Being Considered by Licensee.List of Meeting Attendees,Meeting Agenda & Info Provided by Licensee at Meeting in Handout Encl | |
ML20203B574 | 11 February 1998 | Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl | |
ML20203F113 | 2 February 1998 | Summary of 980112 Meeting W/Util in Rockville,Md Re Progress Toward Resolution of Issues Specified in CAL 2-97-01,dtd 970304.List of Attendees & Copy of Handouts Presented at Meeting Encl | |
ML20203A353 | 29 January 1998 | Summary of 971223 Meeting W/Sce in Rockville,Md to Discuss Mechanical Nozzle Seal Assembly Relief Request.List of Attendees & Slides Encl | Boric Acid Hydrostatic Pressure Boundary Leakage |
ML20203A341 | 28 January 1998 | Summary of 980108 Meeting W/Fpc in Rockville,Md Re Technical Issues Relating to Control Complex Habitability Envelope Justification for Continued Operation.List of Attendees & Meeting Handout Encl | |
ML20199A500 | 20 December 1997 | Summary of 971215 Meeting W/Florida Power Corp in Rockville, Maryland Re TS Change Request Notice (Tscrn) 210, Small Break Loss of Coolant Accident, for Crystal River Unit 3. List of Meeting Attendees & Matl Distributed Encl | |
ML20198B234 | 11 December 1997 | Summary of 971202 Meeting W/Fpc in Rockville,Md Re Seismic Qualification of Mechanical & Electrical Equipment & Large Bore Piping & Pipe Support Calculations.List of Attendees & Meeting Handout Encl | |
ML20199F705 | 9 December 1997 | Summary of 971120 Meeting W/Licensee in Rockville,Md Re Restart Technical Issues & Status of Licensing Activities. List of Attendees & Meeting Handout Encl | Power Uprate Overspeed trip |
ML20197J996 | 5 December 1997 | Summary of 971120 Meeting W/Util in Rockville,Md Re Mgt Corrective Action & Restart Progress.List of Attendees & Meeting Handout Encl | Hot Short Ultimate heat sink Mission time Temporary Modification Exemption Request Manual Operator Action |
ML20203B313 | 25 November 1997 | Summary of 971106 Telcon W/Fpc in Rockville,Md Re Restart Issues.Due to Unforeseen Circumstances,Licensee Requested Cancellation of Meeting Scheduled for 971106 | Operability Determination |
ML20199E442 | 12 November 1997 | Summary of 971028 Meeting W/Fpc in Rockville,Md Re EDG Test Plan & Amend Request Involving EDG Protective Relays.List of Meeting Attendees & Copy of Matl Distributed at Meeting Encl | |
ML20199G712 | 6 November 1997 | Summary of 971023 Meeting W/Util in Rockville,Md Re Results of Steam Generator Tube Degradation & Run Time Analysis for SONGS Unit 2.List of Attendees & Slides Encl | Boric Acid |
ML20199A223 | 4 November 1997 | Summary of 971022 Meeting W/Util in Rockville,Md to Discuss 970614 Amend Request,As Supplemented by ,Involving Mitigation of Certain SBLOCA Scenarios.W/Eight Oversize Central Files Drawings,Attendance List & List of Drawings | |
ML20198Q588 | 31 October 1997 | Summary of 970910 Meeting W/Util in Rockville,Md Re Status of BWR Power Uprate Program.List of Attendees,Agenda & Handouts Encl | |
ML20212G852 | 29 October 1997 | Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl | |
ML20198R954 | 29 October 1997 | Summary of 971022 Meeting W/Util in Rockville,Md Re Licensee Corrective Action Issues & Status of Licensing Issues That Could Potentially Affect CR3 Restart Schedule.List of Attendees & Meeting Handouts Encl | Manual Operator Action |
ML20217G669 | 6 October 1997 | Summary of 970918 Meeting W/Util in Rockville,Md Re Status of Licensing Activities.Licensee Presented Overview of Structure & Usage of EOP & Planned Changes | |
ML20211D661 | 17 September 1997 | Summary of 970905 Meeting W/Util in Rockville,Md to Discuss Status of Expected & Active Licensing Submittals Re Plant, Unit 3.Updated Schedule Encl | Hot Short Safe Shutdown Mission time Exemption Request Manual Operator Action |
ML20211C902 | 11 September 1997 | Summary of 970904 Meeting W/Util to Discuss Licensee Plans to Establish ISFSI Installation at Hatch Npp.List of Meeting Attendees & Overhead Slides Presented by Licensee Encl | Tornado Missile Earthquake |
ML20216D084 | 3 September 1997 | Summary of 970820 Meeting of NRC Restart Panel for Crystal River 3 Facility Held Onsite Re Open Insp Item List.Open Insp Item List Encl | |
ML20217L870 | 14 August 1997 | Summary of 970731 Meeting W/Southern Nuclear Operating Co, Inc in Birmingham,Al Re Plant Status,Major Problems & Other Topics at Farley,Hatch & Vogtle Nuclear Plants.List of Attendees & Presentation Handouts Encl | Fitness for Duty |
ML20141J739 | 12 August 1997 | Summary of 970811 Meeting W/Util Re Radiological Controls at Plant.List of Meeting Attendees Encl | High Radiation Area |
ML20217G915 | 1 August 1997 | Summary of 970721 Meeting W/Fpc in Rockville,Md Re EDG Upgrade,Efs & 10CFR50 App R & Other Design Issues.Attendance List & Meeting Handout Encl | Hot Short Safe Shutdown Power Uprate Overspeed trip |
ML20217D318 | 29 July 1997 | Summary of 970722 Plant Restart 0350 Panel Meeting W/Listed Attendees at Facility Re Status of Open Items from Insps, Restart Issues & Restart Tasks | Hot Short Unanalyzed Condition Fitness for Duty Fire Barrier Hydrostatic Coatings B.5.b Missed surveillance |
ML20149K028 | 24 July 1997 | Summary of 970722 Meeting W/Florida Power Corp in Rockville, MD Re Overview of Licensee Progress Toward Readiness for Restart,Including Issues Specified in CAL 2-97-01 .Attendance List & Meeting Handouts Encl | Hot Short Non-Destructive Examination Mission time Temporary Modification Exemption Request |
ML20141H366 | 17 July 1997 | Summary of 970710 Meeting W/Util to Discuss Licensee Emergency Plan Change 28.001-95 & to Determine If Change Reduces Effectiveness of Emergency Plan for Plant,Unit 1. List of Attendees,Agenda & Info Provided by Licensee Encl | |
ML20148U441 | 7 July 1997 | Summary of 970624 Meeting W/Util in Rockville,Md Re Proposed License Amend Relating to High Pressure Injection,Emergency Feedwater & Emergency Diesel Generator Sys.List of Attendees & Handouts Encl | Mission time |