IR 05000382/2023010 | 31 January 2024 | Comprehensive Engineering Team Inspection Report 05000382/2023010 | Stroke time Arc flash Significance Determination Process Foreign Material Exclusion Power Uprate |
IR 05000382/2023003 | 23 January 2024 | Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 | |
ML24022A117 | 23 January 2024 | Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations | |
ML24012A242 | 16 January 2024 | Acceptance of Requested Licensing Action License Transfer Request | |
ML24012A196 | 12 January 2024 | Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and | |
ML23340A229 | 28 December 2023 | Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR | |
ML23236A004 | 27 December 2023 | Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme | Exemption Request Minimum staff Overexposure |
ML23192A077 | 26 December 2023 | Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance | |
ML23355A124 | 26 December 2023 | Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements | Cyber Security |
ML23191A522 | 22 December 2023 | Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) | |
ML23263A977 | 22 December 2023 | Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation | Ultimate heat sink Probabilistic Risk Assessment FLEX B.5.b Tornado Generated Missile Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Exemption Request Earthquake Control of Heavy Loads Fuel cladding Accidental discharge Grace period Fatality Seismic Walkdown Report |
ML23354A260 | 21 December 2023 | Reference Simulator Inspection Request for Information | |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
L-23-019, Proof of Financial Protection 10 CFR 140.15 | 18 December 2023 | Proof of Financial Protection 10 CFR 140.15 | |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations | 14 December 2023 | License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations | |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements | 12 December 2023 | Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements | Cyber Security |
PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments | 6 December 2023 | Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments | Cyber Security Safeguards Contingency Plan License Renewal Exemption Request Subsequent License Renewal Fire Protection Program Affidavit |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A144 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23312A183 | 14 November 2023 | Integrated Inspection Report 05000382/2023003 and Notice of Violation | Offsite Dose Calculation Manual Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination Earthquake Fire Protection Program Overexposure Overspeed trip |
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | 13 November 2023 | Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
ML23291A440 | 3 November 2023 | Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations | Exemption Request |
IR 05000382/2023401 | 4 October 2023 | Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) | Cyber Security Affidavit |
IR 05000255/2023003 | 4 October 2023 | NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant | High Radiation Area Offsite Dose Calculation Manual Met Tower |
ML23275A001 | 2 October 2023 | Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant | |
PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 | 28 September 2023 | Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 | Offsite Dose Calculation Manual FLEX Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report License Renewal Exemption Request Fuel cladding Biofouling Environmental Justice Siren |
PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations | 28 September 2023 | Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations | |
IR 05000382/2023005 | 21 August 2023 | Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) | Fitness for Duty Cyber Security License Renewal |
IR 05000382/2023301 | 15 August 2023 | NRC Initial Operator Licensing Examination Approval 05000382/2023301 | |
PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable | 9 August 2023 | Special Report High Range Noble Gas Monitor Inoperable | Offsite Dose Calculation Manual |
IR 05000382/2023002 | 8 August 2023 | Integrated Inspection Report 05000382/2023002 | Ultimate heat sink Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Continuous fire watch Fire Protection Program Fire Watch Siren Overspeed trip |
IR 05000382/2023402 | 7 August 2023 | NRC Security Inspection Report 05000382/2023402 (Full Report) | Fitness for Duty |
ML23215A230 | 3 August 2023 | Notice of Organization Change - Chief Nuclear Officer | |
IR 05000255/2023002 | 19 July 2023 | NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant | Offsite Dose Calculation Manual Process Control Program Maintenance Rule Program |
IR 05000382/2023040 | 12 July 2023 | Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter | Past operability Enforcement Discretion |
ML23191A456 | 10 July 2023 | Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information | Commercial Grade Dedication Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
ML23158A104 | 8 June 2023 | Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 | Cyber Security |
ML23145A227 | 2 June 2023 | 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion | Past operability Enforcement Discretion |
ML23130A273 | 10 May 2023 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23087A036 | 2 May 2023 | PSDAR Review Letter | License Renewal Environmental Justice |
ML23117A217 | 1 May 2023 | Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment | |
PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report | 25 April 2023 | 2022 Annual Non-Radiological Environmental Operating Report | |
IR 05000382/2023001 | 24 April 2023 | Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion | Unanalyzed Condition High winds Tornado Missile Enforcement Discretion Temporary Modification Functionality Assessment Tornado-Generated Missile Tornado Missile Protection Operability Determination Earthquake Fire Protection Program Power change Unidentified leakage |
L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 2022 | 24 April 2023 | HDI Annual Occupational Radiation Exposure Data Reports - 2022 |