Issue date | Title | Topic | |
---|---|---|---|
NPL-97-0357, Comment Opposing Proposed NRC Bulletin 96-001,suppl 1, CR Insertion Problems | 19 June 1997 | Comment Opposing Proposed NRC Bulletin 96-001,suppl 1, CR Insertion Problems | Shutdown Margin |
DD-97-15, Director'S Decision DD-97-15 Re Petitioners Request That NRC Prohibit Loading of VSC-24 Until Coc,Sar & SER Amended Following Independent third-party Review of VSC-24 Design. No Adequate Basis Exists for Granting Petitioners Request | 18 June 1997 | Director'S Decision DD-97-15 Re Petitioners Request That NRC Prohibit Loading of VSC-24 Until Coc,Sar & SER Amended Following Independent third-party Review of VSC-24 Design. No Adequate Basis Exists for Granting Petitioners Request | Boric Acid Coatings |
ML20141B045 | 9 June 1997 | Requests Extension of Comment Period for NRC Bulletin 96-001,suppl 1 Re Control Rod Insertion Problems | |
ML20198R151 | 5 March 1997 | Transcript of 970305 OI Interview of Aj Cayia in Two Rivers, Wi Re NRC Investigation Case 3-97-008.Pp 1-70 | Enforcement Discretion Weak link |
ML20198R136 | 4 March 1997 | Transcript of 970304 OI Interview of DF Johnson in Two Rivers,Wi Re NRC Investigation Case 3-97-008.Pp 1-37 | |
ML20198R128 | 4 March 1997 | Transcript of 970304 OI Interview of T Malanowski in Two Rivers,Wi Re NRC Investigation Case 3-97-008.Pp 1-28 | Enforcement Discretion |
ML20198R111 | 4 March 1997 | Transcript of 970304 OI Interview of E Ziller in Two Rivers, Wi Re NRC Investigation Case 3-97-008.Pp 1-33.Supporting Documentation Encl | Enforcement Discretion |
ML20198R093 | 4 March 1997 | Transcript of 970304 OI Interview of Rj Harvey in Two Rivers,Wi Re NRC Investigation Case 3-97-008.Pp 1-28. Supporting Documentation Encl | Enforcement Discretion |
ML20134B737 | 27 January 1997 | Exemption from Requirements of 10CFR50.60 to Determine That Setpoint for LTOP Events Will Not Present Undue Risk to Public & Safety.Exemption Granted | Anticipated operational occurrence Hydrostatic |
NPL-95-0321, Comment on Proposed 10CFR50.54(p) Re Process for Changes to Security Plans W/O Prior NRC Approval.Supports Proposed Clarification of Language in 10CFR50.54(p) | 11 July 1995 | Comment on Proposed 10CFR50.54(p) Re Process for Changes to Security Plans W/O Prior NRC Approval.Supports Proposed Clarification of Language in 10CFR50.54(p) | |
ML20085E654 | 13 June 1995 | Comment Re Draft NUREG/BR-0199, Responsiveness to Public. Expresses Concern on Dry Cask Storage W/Exemption Given to VSC-24 Cask & Procedures for Unloading & Transport at Plant | |
ML20078F483 | 20 December 1994 | Comment on Proposed Rule 10CFR50 Re Shutdown & low-power Operations for Np Reactors.Informs That Util of Belief That NRC Already Has Appropriate Regulatory Authority Over Shutdown & low-power Operations,As Provided in Maint Rule | Backfit |
ML20077E836 | 1 December 1994 | Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Low- Power Operations for Nuclear Power Reactors | Time to boil Backfit |
ML20059E933 | 27 October 1993 | Comment Supporting Proposed Rule 10CFR171 Re Restoration of Generic Exemption from Annual Fees for Nonprofit Educational Institutions | |
ML20045D733 | 13 June 1993 | Comment on Proposed Rule 10CFR26 Re Mods to fitness-for-duty Program Requirements.Recommends That NRC re-evaluate Proposed Testing Frequency Due to Random Testing Rate of 50% Sufficient to Provide Continued Detection Effectiveness | Fitness for Duty |
ML20127D719 | 6 September 1992 | Comment on Proposed Rule 10CFR72 Re Approval of Two Addl Dry Cask Storage Designs.Opposes Rule | |
ML20127D637 | 3 September 1992 | Comment on Proposed Rule 10CFR72 Re Approval of Two Addl Dry Cask Storage Designs.Opposes Rule & Urges NRC to Extend Comment Period in Order for Concerned Citizens to Prepare Thorough List of Objections | |
ML20114D259 | 24 August 1992 | Comment Opposing Proposed Rule 10CFR72 Re Proposal to Store Spent Nuclear Fuel in VSC-24 Storage Casks at Plant in State of Wi | |
ML20073N114 | 10 May 1991 | Comment Supporting Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery | |
ML20058D483 | 15 October 1990 | Comment Supporting Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License Renewal | License Renewal |
ML20235S838 | 22 February 1989 | Comment Opposing Proposed Rules 10CFR50 & 55 Re Degree Requirement for Senior Reactor Operator (Sro).Unless Grandfathered in Next 4-5 Yrs Author to Be Locked Out of Job & Does Not Intend Spending 20 Plus Yrs as Reactor Operator | |
ML20235N834 | 17 February 1989 | Comment Opposing Proposed Rule 10CFR50 Re Effectiveness of Maint Programs for Nuclear Power Plants | Backfit |
ML20148K559 | 18 March 1988 | Comment Supporting Proposed Rule 10CFR50,App J Re Mass Point Method of Data Analysis.Recommends Test Duration Criteria in ANSI/ANS-56.8-1987,Section 5.4 Be Accepted in Revised Regulations | |
ML20236Q799 | 9 November 1987 | Comments on Proposed Rev 2 to Reg Guide 1.100 Re Seismic Qualification of Electrical & Mechanical Equipment for Nuclear Power Plants | Earthquake |
ML20235V823 | 13 October 1987 | Order Imposing Civil Monetary Penalty in Amount of $50,000 Based on Violations Noted During Special Physical Security Insp on 860718-0807 | |
ML20136E051 | 20 November 1985 | Memorandum & Order Granting Licensee 850826 Request for Extension of Deadline for Environ Qualification of Electrical Equipment to 860525 for Unit 1 & 851231 for Unit 2.Served on 851120 | |
ML20137C860 | 19 November 1985 | Transcript of Commission 851119 Affirmation/Discussion & Vote in Washington,Dc Re SECY-330(a) on Point Beach & SECY-225(a) on Sequoyah.Pp 1-5 | |
ML20138M871 | 25 October 1985 | Transcript of 851025 Meeting in Washington,Dc Re Util Requests for Exemption from Environ Qualification.Pp 1-76 | Exemption Request |
ML20078L166 | 17 October 1983 | Response Opposing Wisconsin Environ Decade 830923 Petition for Review of ALAB-739 Re Steam Generator Tubes Repaired by Sleeving.Nexus Between Sleeving & Tube Failure Shown. Certificate of Svc Encl | Probabilistic Risk Assessment |
ML20078C880 | 23 September 1983 | Petition for Review of Aslab 830907 Decision on Sleeving Degraded Steam Generator Tubes.Aslab Erroneously Denied Nexus Shown Between Sleeving & Tube Failure.Certificate of Svc Encl | |
ML20076E158 | 22 August 1983 | Response Opposing Wisconsin Environ Decade 830811 Request to Respond to Hf Conrad Affidavit.Aslab Affirmed Dismissal of Decade Petition to Intervene.Decade Thus Lacks Party Standing.Certificate of Svc Encl.Related Correspondence | |
ML20204G348 | 29 April 1983 | Brief Opposing Wisconsin Environ Decade Exceptions to ASLB 830204 Initial Decision Authorizing full-scale Sleeving. Exceptions Waived for Failure to Brief or Arguments W/O Merits | |
ML20069K595 | 22 April 1983 | Answer Opposing Wisconsin Environ Decade 820407 Petition for Review of ALAB-719 Which Affirmed ASLB 821210 Special Prehearing Conference Order Dismissing Petition to Intervene.Matter Raised Not Reviewable.W/Certificate of Svc | |
ML20073D699 | 11 April 1983 | Request for Extension Until 830427 to File Opposition to Wisconsin Environ Decade Brief on Exceptions.Counsel Has Numerous Obligations Before ASLB & Aslab.Certificate of Svc Encl | |
ML20073B970 | 7 April 1983 | Petition for Review of Aslab 830322 Decision Denying Wisconsin Environ Decade 821220 Appeal of ASLB 821210 Prehearing Conference Order.Hearing on Steam Generator Tube Degradation Issue Should Be Held.Certificate of Svc Encl | |
ML20069F649 | 16 March 1983 | Brief Supporting Wi Environ Decade 830211 Exceptions to ASLB Initial Decision.Aslb Refused to Make Prerequisite Findings on Degree of Assurance Necessary to Protect Public Safety. Affidavit of Mailing Encl | |
ML20071A131 | 14 February 1983 | Exceptions to ASLB 830204 Initial Decision.Affidavit of Mailing Encl | |
ML20064H419 | 10 January 1983 | Replacement P 2 of 821220 Proposed Findings of Fact & Conclusions of Law in Form of Proposed Initial Decision. Svc List Encl | |
ML20070M057 | 7 January 1983 | Comments on Wi Environ Decade Statement of Inadequate Record.Statement Is Inconsistent W/Commission Regulations, Erroneous in Statement of Law,Untimely,Devoid of New Factual Info & Should Not Be Considered.Certificate of Svc Encl | |
ML20028C309 | 4 January 1983 | Proposed Evidentiary Hearings Transcript Changes.Certificate of Svc Encl | |
ML20028C303 | 4 January 1983 | Brief Opposing Wi Environ Decade 821220 Appeal of ASLB 821210 Special Prehearing Conference Order Denying Decade 820810 Petition to Intervene.Decade Willfully Failed to Attend Special Prehearing Conference.W/Certificate of Svc | |
ML20070M014 | 30 December 1982 | Statement of Inadequate Record.Eddy Current Testing Not Proved Adequate for Sleeving Steam Generator Tubes.Record Must Be Reopened.Certificate of Svc Encl | |
ML20070H401 | 20 December 1982 | Proposed Findings of Fact & Conclusions of Law in Form of Proposed Initial Decision Re Repair of Corroded Steam Generator Tubes by Inserting Sleeves.Certificate of Svc Encl | Hydrostatic Through-Wall Leak |
ML20070J014 | 20 December 1982 | Notice of Appeal from 821210 Special Prehearing Conference Order Dismissing Decade 820810 & 1105 Petitions to Intervene.Affidavit of Mailing Encl | |
ML20070J034 | 20 December 1982 | Brief Supporting Appeal from 821210 Special Prehearing Conference Order Denying 820810 Petition to Intervene & Request for Extension of Time to Complete Brief.Dismissal of Petition on Stated Grounds Contrary to Law | |
ML20027E317 | 5 November 1982 | Contentions Re Steam Generator Replacement,Supplementing 820810 Petition to Intervene | Systematic Assessment of Licensee Performance |
ML20027D469 | 2 November 1982 | Testimony of Wd Fletcher Re Adequacy of Eddy Current Testing.Certificate of Svc Encl.Related Correspondence | Boric Acid Hydrostatic Coatings Fuel cladding |
ML20069J345 | 20 October 1982 | Notice of Appearance in Proceeding.Certificate of Svc Encl | |
ML20063N747 | 6 October 1982 | Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl | |
ML20063N759 | 6 October 1982 | Withdrawal of Application for CP |