Comment on Proposed Rule 10CFR50 Re Shutdown & low-power Operations for Np Reactors.Informs That Util of Belief That NRC Already Has Appropriate Regulatory Authority Over Shutdown & low-power Operations,As Provided in Maint Rule
ML20078F483
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/20/1994
From: Abdoo R
WISCONSIN ELECTRIC POWER CO.
To: Selin I, The Chairman
NRC COMMISSION (OCM)
References
FRN-59FR52707, RULE-PR-50 59FR52707, NUDOCS 9502020123
Download: ML20078F483 (3)


Text

[.

5 WISCODSID DOClO FD DOCKET NUMBER -

ElectnC m% PROPOSED RULE $ Eb POWER COMPANY (_f\fR.6Q101) 23, w uen. ganz Bo.2mouwe .u s32ob2m6 '95 JAN 31 P A .2d p)22t231s Decembe 20, 1994 0f Fu.' -

DCC W ';'

The Honorable Ivan Selin, Chairman U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555

Dear Chairman Selin:

PROPOSED RULEMAKING 8HUTDOWN AND LOW-POWER OPERATIONS FOR NUCLEAR POWER REACTOR 8 FEDERAL REGISTER, OCTOBER 20, 1994 Wisconsin Electric Power Company submitted comments on the proposed rulemaking to the NRC Secretary by letter dated December 1. '494. .

This position letter reinforced Wisconsin Electric Power Coyany's commitment to operating Point Beach Nuclear Plant in such a manner as to protect the health and safety of the public and our emp.oyees.

t As part of this commitment, win recognize the need for maintaining nuclear safety during low-powe.r, shutdown, and refueling condi-H ons, and have therefore implemented an outage safety assessment Fagram for Point Beach Nuclear Plant. This program has allowed Point Beach Nuclear Plant to maintain the highest level of nuclear safety during refueling outages, while achieving an enviable record on outage daration.

However, Wisconsin Electric Power Company is very concerned about the shortcomings in the development process used for this rulemaking. In addition, we are concerned about the significant adverse operational and economic implications which would be created for licensees by its promulgation. We wish to bring our- i concerns to your attention. These concerns concentrate in three I main areas which~we will address individually.

Lack of Justification The industry took the initiative to develop and distribute NUMARC 91-06, " Guidelines for Industry Actions to Assess Shut-down Management." We believe this has resulted in significant improvements in shutdown performance, reducing both the frequency and safety significance of shutdown events in the last three years.

9502020123 941220 "

PDR PR 50 59FR52707 PDR

.4 subsM,qaf Misnwsw Exw rariwaten 3

I I

! The Honorable Ivan Selin December 20, 1994 Page 2 The timing of the rulemaking process has prevented these improve-ments from being considered by the NRC staff in the supporting ,

Regulatory Analysis. The data in NUREG 1449 is many years old l and was obtained before the implementation of NUMARC 91-06. )

We are also concerned that the assumptions, cost estimates, estimated outage duration effects, and the use of Probabilistic Safety Assessment (PSA) contained in the Regulatory Jnalysis, are inconsistent with the estimates of the industry.

Point Beach is recognized as an industry leader in the area of outage performance from a scheduling and shutdown safety perspective. Wisconsin Electric estimates that the requirements imposed by the proposed rule would extend the annual refueling  !

outages at Point Beach Nuclear Plant by approximately four days.

At an estimated outage cost per day of $200,000 per unit, with two unit refueling outages per year, the annual increased cost due to extended outage duration alone would be $1.6 million.

Costs other than those caused by outage duration increases, total nearly $8 million as estimated for Point Beach Nuclear Plant. These include the costs for additional fire hazard

, protection programs, reactor vessel level " diverse" instrumen-tation, an RHR suction bypass modification, and operator training.

These costs have not been adequately addressed by the Regulatory Analysis. Wisconsin Electric believes that due to this inadequate assessment of costs associated with complying to the proposed rule, the NRC has failed to comply with the intent of the Backfit Rule as delineated in 10 CFR 50.109. Specifically, 10 CFR 50.109(a)(3) requires that "...all direct and indirect costs of implementation for that facility are justified..." in view of the increased safety to the public resulting from the proposed rule.

Dancer in Codification of Industry Self-Improvement Initiative l Wisconsin Electric believes that codification of an industry self-improvement initiative, such as NUMARC 91-06, sets an undesirable precedent for future industry initiatives. This type of regulatory action discourages 4.aluntary self-improvement initiatives and the proactive commitment of resources. Such a regulatory environment could detract from the NRC's charter to protect the health and safety of the citizens of our country by possibly delaying implementation of safety improvement initiatives identified by the nuclear power industry.

Il '

The Honorable Ivan Selin December 20, 1994 Page 3 Adeauacy of current Regulatory Oversialia While the NRC has recognized that improvements have been made across the industry in these areas, the proposed shutdown rule is based upon a perceived need to prevent backsliding by licensees.

Wisconsin Electric believe the Maintenance Rule already provides an appropriate degree of regulatory-oversight applicable;to, shutdown j operations. It requires that, during performanceLof monitoring and  ;

preventative maintenance activities, an assessment of the total )

plant equipment available to perform safety functions be taken i into account. This regulatory requirement does not differentiate i between plant operation modes.

In summary, we believe appropriate implementation of the guidelines

such as those presented -in NUMARC 91-06 nsgate the need for further j regulation in this area. Furthermore,_the Regulatory Analysis i presented in SECY-94-176 falls far short of justifying the proposed-rule due to out of date data, overly conservative assumptions, inadequate cost estimates, Cnd inadequate PSA analysis.

Finally, Wisconsin Electric believes the NRC already has appropriate regulatory authority over shutdown and low-power  ;

, operations, as provided by the Maintenance Rule. -

I appreciate the opportunity to provide Wisconsin Electric Power l Cenpany's views on this proposed rulemaking. i am confident that t l upon reevaluation of the improvements made by the industry as a result of NUMARC 91-06, the NRC will conclude, just as we have, that no further regulatory action is required in the area of l shutdown and low-power operations.

m Sincerefy, Richard.Abdoo Chairman of the Board &

Chief Executive Officer GAP /jg cc: NEI NRC Resident Inspector NRC Regional Administrator, R III l

bec: J. Anthony, C. Cerovac, C. Gray, E. Gross, R. Hanneman, N. Hoefert, D. Johnson, G. Krieser, R. Link, C. Ksobiech, T. Malanowski, G. Maxfield, M. Millen, R. Newton, F. Padovano, S. Patulski, G. Peppel, M. Reiff, R. Ulmer

-- .- - - - -- . - , -