ML20235S838

From kanterella
Jump to navigation Jump to search
Comment Opposing Proposed Rules 10CFR50 & 55 Re Degree Requirement for Senior Reactor Operator (Sro).Unless Grandfathered in Next 4-5 Yrs Author to Be Locked Out of Job & Does Not Intend Spending 20 Plus Yrs as Reactor Operator
ML20235S838
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/22/1989
From: Varga R
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR52716, RULE-PR-50, RULE-PR-55 53FR52716-00109, 53FR52716-109, NUDOCS 8903080039
Download: ML20235S838 (2)


Text

_ _.

~ '

i DOCKET NUMBERpr .

H: PROPOSED R L - .

gg 3

(E3ff M/thi L

'E9 FEB 27 P2 :45 To: The Secretary of the Commission Nuclear Regulatory Commission . Feb. 22, 1989 Washington, DC. 20555 crt "

00CK!i r a . . e vu.I

.From: Richard Varga W L.% "

2815 38th St.

Two Rivers, WI. 54241 Sirs /Madem:

I wrote the last time you asked for public input on the subject of degrees for SRO's, so I do not intend to go over it again in detail- that it would take me approx. 10 years on a part time basis to get the degree you want me to have to advance to an SRO position.

Since shift work is a requirement of the job, my off duty time needed to get a degree is very significant. My time with my family is already limited due to shift work, so I do not intend to take anymore time from them for a degree that no one thinks I need to have with the exception of a couple people, who do not want to believe their own surveys.

I feel that the NRC should be looking at what knowledge of an SRO should be enhanced. Forcing SRO's to have a degree would make them very knowledgeable in one area, but not in the half dozen other areas that are a part of operating a Nuclear Power Plant. Also the knowledge level should be that needed to safely operate a nuclear power plant, not redesign it.

C 8903080039 890222 PDR PR PDR 50 53FR52716

1 1 am definitely against the degree requirement for an SRO. -j Unless I'm grandfathered in the next 4-5 years I will be locked j out.of the SRO job. I do not-intend to spend the 20 or so years I have left as an RO.

Sincerely,

$$5c SYGR Richard J. Varga Reactor Operator Point Beach Nuclear Plant z

l.

e l

l

_ _ _ _ _ _ _ _ _ _ __ ___- _ __ _ _ _ -_ - __ -