IR 05000280/2024401 | 6 February 2024 | Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 | |
IR 05000280/2023010 | 18 January 2024 | Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 | |
IR 05000280/2023301 | 28 December 2023 | NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 | |
IR 05000280/2023003 | 25 October 2023 | Integrated Inspection Report 05000280/2023003 and 05000281/2023003 | Safe Shutdown Boric Acid Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program |
ML23256A267 | 21 September 2023 | Review of the Fall 2022 Steam Generator Tube Inspection Report | |
IR 05000280/2022004 | 1 September 2023 | Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Reserve Station Service Transformer Nondestructive Examination Temporary Modification VT-2 Multiple Spurious Operation Functionality Assessment FLEX Aging Management Significance Determination Process Operability Determination Biofouling Liquid penetrant Fire Protection Program Fire Watch |
IR 05000280/2023005 | 23 August 2023 | Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) | Fitness for Duty Cyber Security Aging Management License Renewal |
IR 05000280/2023002 | 4 August 2023 | Integrated Inspection Report 05000280/2023002 and 05000281/2023002 | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Nondestructive Examination Functionality Assessment Locked High Radiation Area Significance Determination Process Process Control Program Operability Determination Biofouling Fire Protection Program Fire Watch Hourly Fire Watch Exclusive Use |
IR 05000280/2023001 | 5 May 2023 | Integrated Inspection Report 05000280/2023001 and 05000281/2023001 | Safe Shutdown High winds Mission time Commercial Grade Dedication Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Cyber Security Functionality Assessment FLEX Aging Management Significance Determination Process Job Performance Measure Large early release frequency Operability Determination Fire Protection Program Fire Watch Power change |
IR 05000280/2023401 | 21 April 2023 | Security Baseline Inspection Report 05000280 2023401 and 05000281 2023401 | |
ML23086B917 | 24 March 2023 | Steam Generator Tube Inspection Report for the Fall 2022 Refueling Outage | Nondestructive Examination |
IR 05000280/2022006 | 1 March 2023 | Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2022006 and 05000281/2022006 | Fitness for Duty Commercial Grade Dedication Cyber Security Aging Management License Renewal Exemption Request COVID-19 |
ML23041A023 | 13 February 2023 | Integrated Inspection Report 05000280/2022004 and 05000281/2022004 | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Reserve Station Service Transformer Nondestructive Examination Temporary Modification VT-2 Multiple Spurious Operation Functionality Assessment FLEX Aging Management Significance Determination Process Operability Determination Biofouling Liquid penetrant Fire Protection Program |
IR 05000280/2022003 | 7 November 2022 | Integrated Inspection Report 05000280/2022003 and 05000281/2022003, Operation of an Independent Spent Fuel Storage Installation Report 07200055/2022001, and Exercise of Enforcement Discretion | Safe Shutdown Unanalyzed Condition Non-Destructive Examination Tornado Missile Internal Flooding Enforcement Discretion Temporary Modification Multiple Spurious Operation Functionality Assessment Significance Determination Process Operability Determination Severe Accident Management Guideline Earthquake Maintenance Rule Program Fuel cladding Biofouling Fire Protection Program |
IR 05000281/2022402 | 21 October 2022 | Security Baseline Inspection Report 05000280/ 2022402 and 05000281/2022402 | |
IR 05000280/2022404 | 19 October 2022 | Security Baseline Inspection Report 05000280/2022404 and 05000281/2022404 | Affidavit |
IR 05000280/2022403 | 8 September 2022 | Security Baseline Inspection Report 05000280/2022403 and 05000281/2022403 | |
IR 05000280/2022005 | 24 August 2022 | Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Reports 05000280/2022005 and 05000281/2022005) | Fitness for Duty Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000280/2022002 | 4 August 2022 | Integrated Inspection Report 05000280/2022002 and 05000281/2022002 Final | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Functionality Assessment Operability Determination Fire Protection Program Power change |
IR 05000280/2022011 | 6 July 2022 | Biennial Problem Identification and Resolution Inspection Report 05000280/2022011 and 05000281/2022011 | Safe Shutdown Boric Acid Coatings Condition Adverse to Quality Aging Management Foreign Material Exclusion License Renewal Through Wall Leak Fire Protection Program Siren |
IR 05000280/2022001 | 11 May 2022 | Integrated Inspection Report 05000280/2022001 and 05000281/2022001 | High winds Internal Flooding Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Through-Wall Leak Fire Protection Program |
IR 05000280/2022401 | 29 March 2022 | Security Baseline Inspection Report 05000280/2022401 and 05000281/2022401 | |
IR 05000280/2022405 | 22 March 2022 | Material Control and Accounting Program Inspection Report 05000280/2022405 and 05000281/2022405 | Affidavit |
IR 05000280/2022010 | 15 March 2022 | NRC Inspection Report 05000280/2022010 and 05000281/2022010 | Hot Short Temporary Modification |
IR 05000280/2021006 | 2 March 2022 | Annual Assessment Letter for Surry Power Station, Units 1 and 2 (Reports No. 05000280/2021006 and 05000281/2021006) | Cyber Security Exemption Request Coronavirus |
IR 05000280/2021004 | 11 February 2022 | Integrated Inspection Report 05000280/2021004 and 05000281/2021004 | Boric Acid Stroke time Commercial Grade Dedication Nondestructive Examination Temporary Modification VT-2 Functionality Assessment FLEX Aging Management Significance Determination Process Foreign Material Exclusion Operability Determination Spent Fuel Pool Instrumentation Fire Protection Program |
IR 05000280/2021003 | 24 November 2021 | Integrated Inspection Report 05000280/2021003 and 05000281/2021003 | Offsite Dose Calculation Manual Time to boil Internal Flooding Enforcement Discretion Met Tower Temporary Modification Functionality Assessment Significance Determination Process Annual Radiological Environmental Operating Report Process Control Program Operability Determination Coronavirus COVID-19 Fire Protection Program Coast down Siren |
IR 05000280/2021301 | 10 November 2021 | NRC Operator License Examination Report 05000280/2021301 and 05000281/2021301 | |
IR 05000280/2021011 | 1 November 2021 | Triennial Fire Protection Team Inspection Report 05000280/2021011 and 05000281/2021011 | Safe Shutdown Probabilistic Risk Assessment Operator Manual Action Temporary Modification Multiple Spurious Operation Condition Adverse to Quality Aging Management Time Critical Operator Action License Renewal Coronavirus COVID-19 Fire Protection Program Fire Watch Inattentive |
ML21265A453 | 5 October 2021 | Inspection Report 2021 FOF (IP92707) | Coronavirus |
IR 05000280/2021005 | 31 August 2021 | Mid-Cycle Letter Revised Updated Inspection Plan for Surry Power Station, Units 1 and 2 (05000280/2021005 and 05000281/2021005) | Cyber Security Exemption Request Coronavirus |
IR 05000280/2021001 | 26 August 2021 | Updated Inspection Plan for Surry Power Station, Units 1 and 2 -(05000280/2021001 and 05000281/2021001) | Cyber Security Exemption Request Coronavirus |
IR 05000280/2021010 | 16 August 2021 | Design Basis Assurance Inspection (Programs) Inspection Report 05000280/2021010 and 05000281/2021010 | Stroke time Anchor Darling Power-Operated Valves Coronavirus COVID-19 Weak link GOTHIC |
IR 05000280/2021002 | 12 August 2021 | Integrated Inspection Report 05000280/2021002 and 05000281/2021002 | Safe Shutdown Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Process Control Program Operability Determination Earthquake Coronavirus COVID-19 Liquid penetrant Fire Protection Program Coast down Siren |
IR 05000280/2021402 | 14 June 2021 | Security Baseline Inspection Report 05000280/2021402, 05000281/2021402 and 07200002/2021401 | Coronavirus COVID-19 |
ML21120A155 | 30 April 2021 | Integrated Inspection Report 05000280/2021001 and 05000281/2021001 | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Functionality Assessment Aging Management Significance Determination Process Coronavirus COVID-19 Fire Protection Program Power change |
IR 05000280/2020006 | 3 March 2021 | Annual Assessment Letter for Surry Power Station, Units 1 and 2 NRC Inspection Reports 05000280/2020006 and 05000281/2020006 | Exemption Request Power-Operated Valves COVID-19 |
IR 05000280/2021401 | 9 February 2021 | Security Baseline Inspection Report 05000280/2021401 and 05000281/2021401 | Fitness for Duty Coronavirus COVID-19 |
IR 05000280/2020004 | 2 February 2021 | Integrated Inspection 05000280/2020004 and 05000281/2020004; and 07200055/2020003 | Enforcement Discretion Functionality Assessment Finite Element Analysis Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Coronavirus COVID19 Fire Protection Program |
IR 05000281/2020040 | 30 December 2020 | 95001 Supplemental Inspection Supplemental Report 05000281/2020040 | Boric Acid Past operability Preliminary White Finding |
IR 05000280/2020003 | 6 November 2020 | Integrated Inspection Report 05000280/2020003, 05000281/2020003; and 07200055/2020002 | Safe Shutdown High Radiation Area Ultimate heat sink Internal Flooding Temporary Modification VT-2 Multiple Spurious Operation Functionality Assessment Locked High Radiation Area Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000280/2020010 | 5 November 2020 | NRC Design Bases Assurance Inspection Report 05000280/2020010 and 05000281/2020010 | Hot Short Tornado Missile Internal Flooding Tornado Generated Missile Large early release frequency Time Critical Operator Action Coronavirus COVID-19 |
IR 05000280/2020011 | 24 September 2020 | Biennial Problem Identification and Resolution Inspection Report 05000280/2020011 and 05000281/2020011 | Safe Shutdown Boric Acid Operability Determination Fire Protection Program |
IR 05000280/2020401 | 25 August 2020 | Inspection Report 05000280/2020401 and 05000281/2020401 | Coronavirus COVID-19 |
IR 05000280/2020005 | 24 August 2020 | Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2020005 and 05000281/2020005) | Fitness for Duty Cyber Security Exemption Request Power-Operated Valves COVID-19 |
IR 05000280/2020002 | 10 August 2020 | Integrated Inspection Report 05000280/2020002 and 05000281/2020002 and Exercise of Enforcement Discretion | Boric Acid High Radiation Area Non-Destructive Examination Tornado Missile Time to boil Internal Flooding Enforcement Discretion Reserve Station Service Transformer Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Tornado-Generated Missile Aging Management Tornado Generated Missile Significance Determination Process Tornado Missile Protection Operability Determination Severe Accident Management Guideline Tornado Missile Risk Evaluator Coronavirus COVID-19 Fuel cladding Liquid penetrant Fire Protection Program Coast down |
IR 05000281/2020091 | 30 July 2020 | Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter; NRC Inspection Report 05000281/2020091 | Significance Determination Process Preliminary White Finding |
IR 05000281/2020090 | 26 June 2020 | NRC Inspection Report 05000281/2020090 and Preliminary White Finding and Apparent Violation | Internal Flooding Enforcement Discretion FLEX Significance Determination Process Large early release frequency Preliminary White Finding Flow Induced Vibration |
IR 05000280/2020001 | 8 May 2020 | Integrated Inspection Report 05000280/2020001 and 05000281/2020001; and 07200055/2020001 | Safe Shutdown Boric Acid Packing leak Functionality Assessment Condition Adverse to Quality Operability Determination Subsequent License Renewal Coronavirus COVID-19 Fire Protection Program Hourly Fire Watch Power change |
IR 05000280/2019006 | 3 March 2020 | Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2019006 and 05000281/2019006 | Fitness for Duty |