IR 05000280/2020401

From kanterella
Jump to navigation Jump to search
Inspection Report 05000280/2020401 and 05000281/2020401
ML20239A866
Person / Time
Site: Surry  
(DPR-032, DPR-037)
Issue date: 08/25/2020
From: James Shehee
Division of Reactor Safety II
To: Stoddard D
Virginia Power (Virginia Electric & Power Co)
References
IR 2020401
Download: ML20239A866 (7)


Text

August 25, 2020

SUBJECT:

SURRY POWER STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000280/2020401 AND 05000281/2020401

Dear Mr. Stoddard:

On August 11, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station, Units 1 and 2 and discussed the results of this inspection with Mr. D.

Lawrence and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James C. Shehee, Chief Plant Support Branch Div of Reactor Safety

Docket Nos. 05000280 and 05000281 License Nos. DPR-32 and DPR-37

Enclosure:

Inspection Report

Docket Numbers:

05000280 and 05000281

License Numbers:

DPR-32 and DPR-37

Report Numbers:

05000280/2020401 and 05000281/2020401

Enterprise Identifier: I-2020-401-0035

Licensee:

Virginia Electric and Power Company

Facility:

Surry Power Station, Units 1 and 2

Location:

Surry, VA

Inspection Dates:

March 16-20, 2020 - Remotely

August 10-11, 2020 - On Site

Inspectors:

J. Justice, Physical Security Inspector

R. Patterson, Physical Security Inspector

Approved By:

James C. Shehee, Chief

Plant Support Branch

Div of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Surry Power Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin teleworking. The inspection documented below was completed through a combination of remote and on-site inspection.

SAFEGUARDS

71130.02 - Access Control

Access Control (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: None
  • Tier III: 1 Requirement (02.09)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revisions 30 to 31 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) March 2019-March

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 11, 2020, the inspectors presented the security baseline inspection results to Mr. D. Lawrence and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

1118884

1134148

1135736

1136729

Miscellaneous

Various Key and Lock Control Records

Procedures

OC-20

Surry Power Station Operations Checklist

8/22/2019

SY-AA-106

Control of Safeguards Information, Security-Related

Information, and Controlled Unclassified Information

SY-AA-117

Search Programs

SY-AA-118

Owner Controlled Area Access Control

SY-AA-119

Protected Area Access Control

Self-Assessments PIR1139474

71130.09

Procedures

Physical Security Plan

Physical Security Plan

71151

Corrective Action

Documents

1135029

Procedures

SY-AA-126

Regulatory Assessment Performance Indicator Data

Reporting

1