Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000369/1999006 | 4 October 1999 | Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | |
IR 05000369/1999005 | 26 August 1999 | Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support | Hydrostatic Probabilistic Risk Assessment Time Critical Operator Action Fire Protection Program |
IR 05000369/1999004 | 13 July 1999 | Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support | Safe Shutdown Unanalyzed Condition Fire Barrier Past operability Probabilistic Risk Assessment Job Performance Measure Fire Watch Unidentified leakage |
IR 05000369/1999010 | 16 June 1999 | Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage | High Radiation Area Locked High Radiation Area |
IR 05000369/1999003 | 2 June 1999 | Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support | Unanalyzed Condition Coatings Foreign Material Exclusion Operability Determination Earthquake Pressure Boundary Leakage Manual Operator Action |
IR 05000369/1999002 | 23 April 1999 | Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support | Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination |
IR 05000369/1999001 | 10 March 1999 | Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown Fire Barrier Rod Drop Event Scaffolding |
IR 05000369/1998010 | 18 December 1998 | Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown Grab sample Fire Barrier Past operability Annual Radiological Environmental Operating Report Severe Accident Management Guideline Rod Drop Event Maintenance Rule Program Fire Watch Siren |
IR 05000369/1998009 | 30 October 1998 | Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support | Safe Shutdown Boric Acid Shutdown Margin Non-Destructive Examination Safe Shutdown Earthquake Fire impairment Job Performance Measure |
IR 05000369/1998008 | 21 September 1998 | Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support | Loop seal Stroke time Past operability Enforcement Discretion Temporary Modification Foreign Material Exclusion Operability Determination Overspeed trip |
IR 05000369/1998011 | 27 August 1998 | Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System | Unanalyzed Condition |
IR 05000369/1998007 | 7 August 1998 | Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support | Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Nondestructive Examination Temporary Modification Emergency Lighting Locked High Radiation Area Finite Element Analysis Foreign Material Exclusion Earthquake Liquid penetrant Pressure Boundary Leakage Fire Protection Program Dissimilar Metal Weld Unidentified leakage |
IR 05000369/1998006 | 25 June 1998 | Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support | Boric Acid Fitness for Duty High Radiation Area Probabilistic Risk Assessment Coatings Stress corrosion cracking |
IR 05000369/1998004 | 4 June 1998 | Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown Rod Drop Event Exemption Request |
IR 05000369/1998003 | 18 May 1998 | Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Unanalyzed Condition Safe Shutdown Earthquake Post Accident Monitoring Temporary Modification Incorporated by reference Operability Determination Downpower |
ML20216H617 | 6 April 1998 | Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support | Unanalyzed Condition Boric Acid Stroke time Past operability Rod Drop Event Negative Flux Rate Trip |
IR 05000369/1997020 | 23 February 1998 | Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security | High Radiation Area Hydrostatic Past operability Enforcement Discretion Temporary Modification Locked High Radiation Area Foreign Material Exclusion |
IR 05000369/1998001 | 17 February 1998 | Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys | Safe Shutdown |
ML20198P377 | 12 January 1998 | Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support | Stroke time Nondestructive Examination Temporary Modification Liquid penetrant Backfit Flow Induced Vibration |
ML20199B164 | 5 January 1998 | Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg | Safeguards Contingency Plan |
IR 05000369/1997017 | 1 December 1997 | Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Safe Shutdown Boric Acid Non-Destructive Examination Temporary Modification Foreign Material Exclusion Code Reconciliation Control of Heavy Loads Liquid penetrant Scaffolding |
IR 05000369/1997015 | 20 October 1997 | Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Eddy Current Testing |
IR 05000369/1997012 | 22 September 1997 | Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise | Siren |
ML20211E798 | 16 September 1997 | Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors | GOTHIC |
IR 05000369/1997010 | 8 September 1997 | Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support | Packing leak High Radiation Area Stroke time Nondestructive Examination Temporary Modification Foreign Material Exclusion Overspeed trip |
IR 05000369/1997013 | 22 August 1997 | Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment | |
ML20149L575 | 28 July 1997 | Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support | Non-Destructive Examination Fire Barrier Hydrostatic Probabilistic Risk Assessment Eddy Current Testing Power change Downpower |
ML20149G688 | 16 June 1997 | Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support | Loop seal Past operability Foreign Material Exclusion Fire Watch Scaffolding Operability Assessment Thermography Manual Operator Action |
IR 05000369/1997007 | 2 June 1997 | Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering | Non-Destructive Examination Dissimilar Metal Weld Scaffolding Thermography |
IR 05000369/1997004 | 5 May 1997 | Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support | Unanalyzed Condition Time of Discovery High Radiation Area Past operability Locked High Radiation Area Foreign Material Exclusion Operability Determination Downpower |
IR 05000369/1997005 | 28 April 1997 | Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support | High Radiation Area Liquid penetrant |
IR 05000369/1997003 | 1 April 1997 | Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support | Nondestructive Examination Control of Heavy Loads |
ML20137V153 | 24 March 1997 | Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support | Exemption Request Downpower |
IR 05000369/1997002 | 5 March 1997 | Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support | |
ML20134L146 | 10 February 1997 | Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Packing leak High Radiation Area Offsite Dose Calculation Manual Stroke time Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Commercial Grade Fire Protection Program Dissimilar Metal Weld Downpower |
IR 05000369/1996010 | 30 December 1996 | Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support | Time of Discovery Loop seal Anticipated operational occurrence Temporary Modification Missed surveillance Local Leak Rate Testing Downpower |
IR 05000369/1996009 | 27 November 1996 | Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support | Safeguards Contingency Plan Fire Watch |
IR 05000369/1996008 | 15 November 1996 | Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support | Post Accident Monitoring Past operability Job Performance Measure |
ML20128H695 | 2 October 1996 | Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support | Safe Shutdown Earthquake Post Accident Monitoring Past operability Temporary Modification Stress corrosion cracking Operability Determination Operability Assessment |
IR 05000369/1994029 | 28 December 1994 | Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations | |
IR 05000369/1993029 | 11 January 1994 | Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation | Temporary Modification Liquid penetrant Unidentified leakage |
IR 05000369/1993030 | 7 January 1994 | Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings | Stroke time Emergency Lighting Thermography |
IR 05000269/1993032 | 6 January 1994 | Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts | Fitness for Duty |
IR 05000369/1993028 | 29 December 1993 | Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program | |
IR 05000369/1993024 | 16 December 1993 | Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance | High Radiation Area Scaffolding Unidentified leakage Unidentified leak Overspeed trip |
IR 05000369/1993026 | 15 December 1993 | Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations | Temporary Modification Operability Determination |
IR 05000369/1993025 | 2 December 1993 | Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors | |
IR 05000369/1993021 | 10 November 1993 | Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF | |
IR 05000369/1993022 | 9 November 1993 | Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings | Hydrostatic |
IR 05000369/1993018 | 19 October 1993 | Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise | Packing leak Stroke time Hydrostatic Temporary Modification Fire Watch Unidentified leakage Unidentified leak |