NG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs | 8 October 1999 | Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs | Maintenance Rule Program |
NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request | 8 October 1999 | Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request | |
NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included | 5 October 1999 | Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included | Incorporated by reference Maintenance Rule Program |
NG-99-1327, Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval | 4 October 1999 | Forwards IST Relief Request VR-24 Re Excess Flow Check Valve Test Frequency,Per 10CFR50.55a(a)(3)(i),for NRC Approval | |
NG-99-1378, Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 | 4 October 1999 | Clarifies TS Change Requests for Revised Safety Limit Min Critical Power Ratio.Approval of 990510 & 0716 Application for Amends to License DPR-49 Requested Prior to Scheduled Start of Cycle 17 & Effective Date No Earlier than 991022 | Minimum Critical Power Ratio |
NG-99-1262, Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) | 20 September 1999 | Forwards License Renewal Application for G Thullen,License SOP 30232-2.Thullen Has Completed Requalification Program for Daec.Encls Withheld,Per 10CFR2.790(a)(6) | |
NG-99-1214, Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 | 15 September 1999 | Forwards Voluntary Info Requested in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Re Estimated Number of Operator Licensing Exams & Applicants for Years 2000 Through 2003 | |
NG-99-1278, Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H | 15 September 1999 | Forwards Corrected TS Page 3.3-52 Re TS Change Request TSCR-003,removing Requirements for Hpcis & Rcics Isolation Manual Initiation Instrumentation.Page Indicates Deletion of Condition G as Well as or G from Condition H | |
NG-99-1249, Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC | 10 September 1999 | Requests Exemption from Certain Requirements Applicable to ECCS Evaluation Models Performed IAW App K to 10CFR50 for DAEC | Probabilistic Risk Assessment Incorporated by reference Exemption Request |
NG-99-1252, Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations | 9 September 1999 | Informs That There Is No Longer Need for Any Waiver Associated with Senior Operator License Application for MR Pettengill Due to Completion of All Five Manipulations | |
NG-99-1192, Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity | 8 September 1999 | Forwards marked-up Copies of Affected Tables & Ref Matl Which Supports Changes Re DAEC Reactor Vessel Integrity Database (Rvid),As Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity | |
NG-99-1216, Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible | 1 September 1999 | Requests Waiver to Allow MR Pettengill to Participate in Upcoming Senior Operator Examination on 990920.Util Intends to Ensure That Pettengill Completes All Five Required Manipulations as Soon as Possible | |
ML20211M581 | 31 August 1999 | Forwards Proprietary Version of Rev 61 to DAEC Emergency Telephone Book. Proprietary Encl Withheld | |
NG-99-1182, Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) | 31 August 1999 | Forwards Certified License Applications IAW Provisions of Examiner Standard (ES)-201 for SA Arebaugh,Sd Bahnsen,Jd Kalamaja,Ja Miell,Bd Musel & MR Pettengill.Encls to Ltr Withheld Per 10CFR2.790(a)(6) | |
NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 | 30 August 1999 | Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 | Fitness for Duty |
NG-99-1146, Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 | 16 August 1999 | Forwards Validated Exam Matls for Initial License Exam to Be Administered at Facility,Wk of 990920,IAW Guidelines in NUREG-1021,Rev 8,dtd April 1999 | Half scram Stroke time Time to boil Squib Locked High Radiation Area B.5.b Double blade guide Job Performance Measure Operability Determination |
NG-99-1126, Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 | 13 August 1999 | Submits Rept Re Changes in Calculated Peak Cladding Temp for Daec,Iaw 10CFR50.46(a)(3)(ii),guidance in NRC Info Notice 97-015 & Suppl 1.Rept Covers Period from Last Annual Rept Through June 1999 | |
NG-99-1050, Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable | 28 July 1999 | Informs That Recommendation in BWRVIP-18,incorrectly Interpreted During RFO 15 & 25% of Creviced Welds Examined. All of Inspected Creviced Welds Were Found to Be Acceptable | |
NG-99-0993, Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) | 21 July 1999 | Submits Amend to Commitment Contained in Util 990623 Response to NRC RAI Re Third ten-year Interval ISI Relief Requests.Licensee Now Commits to Meeting Code Requirement of Asme,Section XI,1989 Edition,Paragragh IWB/IWC-2420(a) | |
NG-99-0989, Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates | 16 July 1999 | Provides Estimate of Number of Licensing Requests That Will Be Submitted in FY00 & 01,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates | |
NG-99-0990, Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 | 13 July 1999 | Forwards License Renewal Applications for Ta Zimmerman SOP 30772 & Ba Westcot SOP 30771.Encls Withheld,Per 10CFR2.790 | |
NG-99-0928, Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 | 1 July 1999 | Forwards Response to NRC 980902 Comments Re Design Basis NPSH Analyses as Requested by GL 97-04 | |
NG-99-0859, Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl | 25 June 1999 | Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants,Per GL 98-01.Y2K Readiness Disclosure for Plant Encl | Backfit |
NG-99-0880, Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests | 23 June 1999 | Informs That Util Commits to Repeating Newly Established Sequence of Component Exams During Successive Insp Intervals for NDE-R035,in Response to NRC Re Inservice Insp Relief Requests | |
ML20196F953 | 21 June 1999 | Forwards Proprietary Rev 60 to Duane Arnold Energy Center Emergency Telephone Book.Proprietary Info Withheld | |
NG-99-0468, Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center | 3 June 1999 | Informs That There Have Been No Changes in Organizational Structure or Ownership from That Previously Submitted in .Ies Util Remains Owner & Operator of Duane Arnold Energy Center | |
NG-99-0625, Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b) | 24 May 1999 | Informs NRC That SRO License for B Westcot & SRO License SOP 30772 for T Zimmerman Should Be Modified to Require Corrective Lenses for Near & Distant Vision While Performing Licensed Duties.Nrc Forms 396,withheld,per 10CFR2.790(a)(b) | |
NG-99-0741, Forwards Remaining Validated Exam Matls for Initial License Exam to Be Administered at Licensee Facility Week of 990524. Exam Matls Should Be Withheld from Public Disclosure Until After Exam Completed | 19 May 1999 | Forwards Remaining Validated Exam Matls for Initial License Exam to Be Administered at Licensee Facility Week of 990524. Exam Matls Should Be Withheld from Public Disclosure Until After Exam Completed | Loop seal Slow transfer Post Accident Monitoring Temporary Modification Squib Earthquake Fuel cladding Unidentified leakage |
NG-99-0700, Forwards License Renewal Applications for SA Brewer OP-30975,EE Harrison SOP-31293 & SD Kottenstette SOP-31294. Encls Withheld Per 10CFR2.790(a)(6) | 17 May 1999 | Forwards License Renewal Applications for SA Brewer OP-30975,EE Harrison SOP-31293 & SD Kottenstette SOP-31294. Encls Withheld Per 10CFR2.790(a)(6) | |
ML20206S795 | 11 May 1999 | Informs That Temporary Addendum to DAEC Security Plan Is No Longer Required & Should Be Removed.Addendum Was Transmitted to NRC in 981015 Licensee Ltr | |
NG-99-0664, Forwards Certified Application Re Reactor Operator License Reapplication IAW Provisions of Examiner Standard (ES)-201 for Ma Ruchko.Examination Is Scheduled for 990525.Encl Withheld Per 10CFR2.790 | 10 May 1999 | Forwards Certified Application Re Reactor Operator License Reapplication IAW Provisions of Examiner Standard (ES)-201 for Ma Ruchko.Examination Is Scheduled for 990525.Encl Withheld Per 10CFR2.790 | |
NG-99-0636, Forwards Radiological Environ Monitoring Program (REMP) for DAEC for Jan-Dec 1998, IAW TS Section 5.6.2 Reporting Requirements | 29 April 1999 | Forwards Radiological Environ Monitoring Program (REMP) for DAEC for Jan-Dec 1998, IAW TS Section 5.6.2 Reporting Requirements | |
NG-99-0633, Forwards DAEC 1998 Annual Radioactive Matls Release Rept for Jan-Dec 1998. Rept Satisfies Requirements for Annual Radioactive Matl Release Rept,As Stated in Section 5.6.3 of Tech Specs | 29 April 1999 | Forwards DAEC 1998 Annual Radioactive Matls Release Rept for Jan-Dec 1998. Rept Satisfies Requirements for Annual Radioactive Matl Release Rept,As Stated in Section 5.6.3 of Tech Specs | |
NG-99-0622, Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl | 28 April 1999 | Forwards Validated Exam Matls for Initial License Exam to Be Administered During Week of 990524,per NUREG-1021.Without Encl | |
NG-99-0605, Forwards Response to NRC Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Duane Arnold Energy Center | 28 April 1999 | Forwards Response to NRC Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Duane Arnold Energy Center | |
NG-99-0493, Forwards non-certified Application Re Reactor License Reapplication in Accordance with Provisions of Examiner Std (ES)-201 for Ma Ruchko.Nrc License Exam Scheduled for 990525.Without Encl | 19 April 1999 | Forwards non-certified Application Re Reactor License Reapplication in Accordance with Provisions of Examiner Std (ES)-201 for Ma Ruchko.Nrc License Exam Scheduled for 990525.Without Encl | |
NG-99-0495, Informs NRC That RW Pfeil Did Not Take BWR Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 990407.R Pfeil Is No Longer Enrolled in DAEC Operator Licensing Training Program | 19 April 1999 | Informs NRC That RW Pfeil Did Not Take BWR Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 990407.R Pfeil Is No Longer Enrolled in DAEC Operator Licensing Training Program | Generic Fundamentals Examination |
NG-99-0529, Forwards Outline of Exam to Be Given Week of 990524 as Requested in Telcon with G Thullen & Requests Exam Matls Be Withheld from Public Disclosure Until After Exam Completed on 990528 | 8 April 1999 | Forwards Outline of Exam to Be Given Week of 990524 as Requested in Telcon with G Thullen & Requests Exam Matls Be Withheld from Public Disclosure Until After Exam Completed on 990528 | |
ML20205M247 | 2 April 1999 | Transmits Change 40 to DAEC Security Plan,Per Requirements of 10CFR50.54(p).Changes Are Intended to Enhance Capability of Onsite Security Force to Defend Against Design Basis Threat.Plan Withheld,Per 10CFR73.21 | |
NG-99-0491, Requests Relief from Noted Requirements,For Relief Requests MC-R002 Through MC-R006,MC-P001 & NDE-R015,rev 1.Approval Is Requested Prior to Refueling Outage 16,scheduled to Begin on 991008 | 2 April 1999 | Requests Relief from Noted Requirements,For Relief Requests MC-R002 Through MC-R006,MC-P001 & NDE-R015,rev 1.Approval Is Requested Prior to Refueling Outage 16,scheduled to Begin on 991008 | Coatings Nondestructive Examination VT-2 Liquid penetrant |
NG-99-0281, Forwards Decommissioning Funding Rept for Daec,Iaw 10CFR50.75(f)(1).Rept Is Being Submitted by DAEC Joint Owners Ies Utilities,Inc,Central IA Power Cooperative & Corn Belt Cooperative | 31 March 1999 | Forwards Decommissioning Funding Rept for Daec,Iaw 10CFR50.75(f)(1).Rept Is Being Submitted by DAEC Joint Owners Ies Utilities,Inc,Central IA Power Cooperative & Corn Belt Cooperative | |
NG-99-0273, Forwards 1999 DAEC Simulator Certification Rept, Per 10CFR55.45 Every Four Years on Anniversary of Certification. Required Info Contained in Attachments 1-7 | 24 March 1999 | Forwards 1999 DAEC Simulator Certification Rept, Per 10CFR55.45 Every Four Years on Anniversary of Certification. Required Info Contained in Attachments 1-7 | Stroke time Scram Discharge Volume Fuel cladding |
ML20207L835 | 10 March 1999 | Forwards Proprietary Rev 59A to Deac Emergency Telephone Book & non-proprietary Rev 20 to Section H of DAEC Emergency Plan, IAW 10CFR50,App E.Proprietary Info Withheld | |
NRC-99-0300, Forwards Rev 15 to Pump & Valve IST Program for Daec | 1 March 1999 | Forwards Rev 15 to Pump & Valve IST Program for Daec | |
NG-99-0302, Forwards Fitness for Duty Program Performance for DAEC During Six Month Period Jul-Dec 1998 in Accordance with 10CFR26.71(d) | 28 February 1999 | Forwards Fitness for Duty Program Performance for DAEC During Six Month Period Jul-Dec 1998 in Accordance with 10CFR26.71(d) | Fitness for Duty |
ML20203G304 | 12 February 1999 | Informs of Rev to Security Plan for DAEC to Improve Flexibility in Deployment of Members of Security Force. Security Plan Change 39,reflecting Changes,Encl.Encl Withheld | |
ML20202G997 | 2 February 1999 | Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) | |
NG-99-0115, Submits Request for Enforcement Discretion to Tech Spec Surveillance Requirement 3.8.1.7 for Edgs.Listed New Commitment Being Made by Ltr | 21 January 1999 | Submits Request for Enforcement Discretion to Tech Spec Surveillance Requirement 3.8.1.7 for Edgs.Listed New Commitment Being Made by Ltr | Safe Shutdown Ultimate heat sink Enforcement Discretion Grace period |
ML20206S169 | 18 January 1999 | Forwards Proprietary Rev 59 to DAEC Emergency Telephone Book. Proprietary Encl Withheld | |
NG-98-2102, Informs That Util Completed Commitment to Assess & Implement Severe Accident Mgt Guidelines at Daec,Based Upon Generic Guidelines Developed by BWROG | 31 December 1998 | Informs That Util Completed Commitment to Assess & Implement Severe Accident Mgt Guidelines at Daec,Based Upon Generic Guidelines Developed by BWROG | Severe Accident Management Guideline |