Issue date | Title | Topic | |
---|---|---|---|
ML20217M380 | 21 October 1999 | Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy | Power change |
ML17250B304 | 20 October 1999 | Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated | |
ML20217M337 | 20 October 1999 | Forwards Notice of Docketing of License SNM-2506 Amend Application.Notice Has Been Forwarded to Ofc of Fr for Publication | |
ML20217M111 | 19 October 1999 | Forwards Insp Repts 50-282/99-14 & 50-306/99-14 on 990920- 22.One Violation Noted & Being Treated as Ncv.Insp Focused on Testing & Maint of Heat Exchangers in High Risk Sys | Significance Determination Process |
NPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability | 19 October 1999 | Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability | |
ML20217F433 | 15 October 1999 | Forwards Rev 39 to Security Plan.Changes Do Not Decrease Effectiveness of Security Plan.Rev Withheld,Per 10CFR73.21 | |
IR 05000244/1999008 | 14 October 1999 | Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy | |
ML20217G071 | 13 October 1999 | Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted | |
ML17265A765 | 8 October 1999 | Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request | Non-Destructive Examination VT-2 Dissimilar Metal Weld |
ML20217C235 | 6 October 1999 | Forwards Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Insp Consisted of Selected Exam of Procedures & Representative Records,Observation of Activities & Interviews with Personnel | |
ML17265A764 | 5 October 1999 | Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel | VT-2 |
ML17265A763 | 5 October 1999 | Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 | VT-2 |
ML20212J356 | 30 September 1999 | Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 | |
ML20212J380 | 30 September 1999 | Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 | |
ML20212J743 | 30 September 1999 | Forwards Insp Repts 50-266/99-15 & 50-301/99-15 on 990830- 0903.No Violations Noted.Inspectors Concluded That Util Licensed Operator Requalification Training Program Satisfactorily Implemented | |
ML20217A591 | 30 September 1999 | Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issues Matrix Encl | |
05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics | 30 September 1999 | Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics | Safe Shutdown |
ML20217B142 | 30 September 1999 | Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities | |
ML20216J249 | 30 September 1999 | Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided | |
ML20212K913 | 30 September 1999 | Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA | Probabilistic Risk Assessment |
ML20212K765 | 29 September 1999 | Forwards Insp Repts 50-266/99-13 & 50-301/99-13 on 990714-0830.No Violations Noted.Operators Responded Well to Problems with Unit 1 Instrument Air Leak & Unit 2 Turbine Governor Valve Position Fluctuation | |
NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel | 29 September 1999 | Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel | |
IR 05000272/1999007 | 28 September 1999 | Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified | |
ML20212J881 | 28 September 1999 | Forwards Preliminary Accident Sequence Precurson Analysis of Operational Event That Occurred at Plant,Unit 1 on 990105, for Review & Comment.Comment Requested within 30 Days of Receipt of Ltr | Emergency Lighting |
IR 05000244/1999005 | 24 September 1999 | Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs | Breakaway torque |
ML17265A757 | 24 September 1999 | Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs | Breakaway torque |
IR 05000244/1999201 | 24 September 1999 | Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld | |
ML20216J809 | 24 September 1999 | Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued | |
ML20216G434 | 24 September 1999 | Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam | |
ML20212G717 | 24 September 1999 | Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 | Enforcement Discretion |
ML20212G980 | 23 September 1999 | Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island | |
ML20212F090 | 21 September 1999 | Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability | |
ML20212F512 | 20 September 1999 | Forwards Response to NRC , Preparation & Scheduling of Operator Licensing Examinations | |
ML20212D840 | 16 September 1999 | Discusses 990902 Telcon Between D Wesphal & R Bailey Re Administeration of Retake Exam at Prairie Island During Wk of 991206.NRC May Make Exam Validation Visit to Facility During Wk of 991116 | |
ML20212D577 | 15 September 1999 | Discusses Review of Response to GL 88-20,suppl 4,requesting All Licensees to Perform Ipeee.Ser,Ter & Supplemental TER Encl | Hot Short High winds Internal Flooding Probabilistic Risk Assessment |
ML20217H233 | 10 September 1999 | Forwards Security Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12.Two Findings,Each of Low Risk Significance Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy | |
ML20217H566 | 9 September 1999 | Discusses 990907 Pilot Plan Mgt Meeting Re Results to-date of Pilot Implementation of NRC Revised Reactor Oversight Process at Prairie Island & Quad Cities.Agenda & Handouts Provided by Utils Encl | Significance Determination Process |
ML20212A924 | 9 September 1999 | Discusses Plans Made During 990902 Telephone Conversation to Inspect Licensed Operator Requalification Program at Prairie Island During Weeks of 991101 & 991108.Requests That Written Exams & Operating Tests Be Submitted by 991022 | |
ML20212B051 | 9 September 1999 | Forwards Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.One Issue of Low Safety Significance Was Identified & Being Treated as Ncb | |
ML20217A575 | 9 September 1999 | Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls | |
ML20212A976 | 9 September 1999 | Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications | MELLLA |
ML20211Q764 | 8 September 1999 | Informs That NRC Tentatively Scheduled Initial Licensing Exam for Plant Operator License Applicants During Wk of 000515,in Response to D Westphal | |
ML20211Q645 | 8 September 1999 | Forwards Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL for Exams Conducted on 990726-0802 at Point Beach Npp.All Nine Applicants Passed All Sections of Exam | |
ML20211N863 | 7 September 1999 | Withdraws 970814 Request for Exemption from 10CFR50,App R, Section III.G.2, Fire Protection of Safe Shutdown Capabilities | Safe Shutdown Fire Barrier Exemption Request |
ML20211Q417 | 6 September 1999 | Responds to VA Kaminskas by Informing That NRC Tentatively Scheduled Initial Licensing Exam for Operator License Applicants During Weeks of 001016 & 23.Validation of Exam Will Occur at Station During Wk of 000925 | |
ML20211Q698 | 6 September 1999 | Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 | |
05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump | 2 September 1999 | Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump | Safe Shutdown |
ML20211L198 | 1 September 1999 | Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted | Power change |
ML20211K797 | 1 September 1999 | Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed | |
ML20211K591 | 1 September 1999 | Informs That Util Reviewed Rvid Data Base,As Requested in NRC .Summary of Proposed Changes & Observed Differences Are Included in Encl Tables | Pressure and Temperature Limits Report |