ML20217P20626 October 1999Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified
ML20217N38520 October 1999Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr
ML20217N23215 October 1999Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST ProgramSafe Shutdown
Stroke time
Incorporated by reference
Power-Operated Valves
PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl14 October 1999Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl
ML20217G92014 October 1999Discusses Utils Request for Approval of Quality Assurance Program Changes
ML20217F39014 October 1999Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld
PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect13 October 1999Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect
ML20217F8378 October 1999Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV
ML20217A56430 September 1999Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification
ML20212J14530 September 1999Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed
ML20212L06930 September 1999Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011
ML20212K92730 September 1999Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff
ML20217E71130 September 1999Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained
ML20216J67024 September 1999Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls
ML20212G41624 September 1999Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant
ML20212G58123 September 1999Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55
ML20212D35021 September 1999Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006High winds
Probabilistic Risk Assessment
Condition Adverse to Quality
Tornado Generated Missile
Biofouling
PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams21 September 1999Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing ExamsGeneric Fundamentals Examination
PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions16 September 1999Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions
ML20212D01514 September 1999Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED
ML20212A83713 September 1999Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions
05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached9 September 1999Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached
ML20217A8979 September 1999Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy
PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages9 September 1999Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages
ML20211P3007 September 1999Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified
ML20216E5967 September 1999Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation
ML20211Q6916 September 1999Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218
IR 05000440/199900131 August 1999Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev
ML20211K66830 August 1999Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls
ML20211K66130 August 1999Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls
ML20211K09530 August 1999Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 DaysHot Short
Safe Shutdown
Probabilistic Risk Assessment
Earthquake
PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.226 August 1999Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2
ML20211H02025 August 1999Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d)Fitness for Duty
ML20211G39120 August 1999Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action EstimatesBoric Acid
ML20211D11720 August 1999Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations
PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl19 August 1999Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,EnclNon-Destructive Examination
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
ML20210Q84213 August 1999First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5)
ML20211B01613 August 1999Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1
ML20211J92013 August 1999Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant
ML20210R78612 August 1999Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive
ML20210T10612 August 1999Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld
ML20210S60711 August 1999Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps
ML20210S39611 August 1999Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are AdministeredGeneric Fundamentals Examination
ML20210Q79810 August 1999Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in NovBiofouling
ML20210Q58310 August 1999Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various TypesCoatings
PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-99063010 August 1999Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630Fitness for Duty
PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 98082610 August 1999Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826
PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready10 August 1999Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready
ML20210P8059 August 1999Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of ProgramProcess Control Program
05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl6 August 1999Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl