ST-HL-AE-3171, Monthly Operating Repts for June 1989 for South Texas Project Electric Generating Station Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1989 for South Texas Project Electric Generating Station Units 1 & 2
ML20246Q013
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/30/1989
From: Hill R, Jordan T, Kent A
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ST-HL-AE-3171, NUDOCS 8907200408
Download: ML20246Q013 (21)


Text

    • .

The Light company P.O. Box 1700 liouston, Texas 77001 (713) 228 9211 Ilouston Lighting & Power . - .. _ - . _ . - - - - . - -

July 14, 1989 ST-HL-AE-3171 File No.: G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 & 2 Docket Nos. STN 50-498 & 50-499 Monthly Operating Reports for June, 1989 l

Eursuant to 10CFR50.71(a) and the South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly l Operating Reports for June, 1989. Please note that, as a result of Unit 2 l being declared commercial on June 19, 1989 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, separate reports are l enclosed covering the completion of the startup phase (June 1 to 18) and the beginning of commercial operation (June 19 to 30). The data has been l "rezeroed" as of the beginning of commercial operation in the latter report.

If you should have any questions on this matter, please contact Mr. C. A. Ayala at (512) 972-8628.

M

. A. McBurnett Manager l Support Licensing HAM /BEM/n1 l

Attachments: 1) STPEGS Unit 1 Monthly Operating Report - June, 1989

2) STPEGS Unit 2 Monthly Operating Report - June 1-18, 1989
3) STPEGS Unit 2 Monthly Operating Report - June 19-30, 1989 1

1 8907200408 890MO 8 DR ADOCK 0500 NL.NRC.R. MON.LT A Subsidiary of liouston Industries Incorporated [Ly Il e

..s ,

llou'ston 1.ighting & Power Company ST-HL-AE-3171

. File No.: G02 Page 2 cc:

Regional Administrator, Region IV Rufus S. Scott Associate General Counsel

~

Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 Houston, TX 77001 George ' Dick, Proj ect Manager U. S. Nuclear Regulatory Commission. INPO Washington, DC 20555 Records Center 1100 Circle 75 Parkway Jack E. Bess Atlanta, GA 30339-3064 Senior Resident Inspector-Unit 1 c/o U. S. Nuclear Regulatory Commission Dr. Joseph M. Hendrie-P. O. Box 910 50 Be11 port Lane Bay City, TX 77414 Be11 port, NY 11713 J. I. Tapia D. R. Lacker Senior Resident Inspector-Unit 2 Bureau of' Radiation Control c/o U. S. Nuclear Regulatory Commission Texas Department of Health P. O. Box 910 1199 West 89th Street Bay City, TX 77414 Austin, TX 78756-3189 J. R. Newman, Esquire Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)

Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 l R. J. Costello/M. T. Hardt I City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 06/16/89 NL.D2SR4

ATTACHMENT I

. ST-HL-AE- 3/ 7 /

PAGE / OF 6 i

t

~i SOUTH TEXAS PROJECT 1 ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT JUNE 1989  !

HOUSTON LIGHTING AND' POWER CO.

NRC DOCKET NO. 50-498 LICENSE NO. NPF-76

)

Prepared by: ) v 7 (v Perfo'rmance T chnician ~Da'e t i Reviewed by: .

MG/'%$

General Supervisor Date Reviewed By: 7/M f l 7 PQpf~[gineeringManager #

Ditte l Reviewed By: d/[h -

PlantEpperintenben Date

{

Approved By: h h nq 1 h D Plant Manager Dait e I

l l

4 ATTACHMENT 3

.ST HL AE 717 /

._PAGE R OF 6 l tionthly Summary -

l STPEGS Unit 1 began the reporting period at 100% reactor power.

On 6/14/89 at 0955' reactor power dropped to 96 57, due to a decrease.in steam flow and feed flow. Investigation revealed a loss of power to all the Moisture Separator Reheater's-(MSR) temperature control valves causing them to close. The MSRs were returned to.

service at 1218.

Reactor power was reduced to.90% on'6/22/89'at approximately 2300 to repair the limit switch on a throttle valve and to perform surveillance testing on Main Steam Isolation and Turbine valves.

Testing was completed and reactor power was increased to 100% on 6/23/89 at'2040.

The unit concludod the report period at 100% reactor power.

', ATTACHMENT I i 1

' . ST-HL AE- 3/ 7/

PAGF,l E..f OPERATING DATA REPORT DOCKET NO. 50-498 )

UNIT 1 ,J DATE July 6, 1989 j COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 OPERATING STATUS

1. REPORTING PERIOD: 06/01-06/30 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAX DEFEND.CAPACI'fY (MWe-Net): 1250.6 i DESIGN ELECTRICAL RATING (MWe-Net):1250.6 l 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A I

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL....... 720 3311.6 -5808.4-
6. REACTOR RESERVE SHUTDOWN HOURS......... ... 0 0 0 l 7. HOURS GENERATOR ON LIN3................... 720 3248.8 5654.8
8. UNIT RESERVE SHUTDOWN HOURS.......,........ 0 0 0 i
9. GROSS THERMAL ENERGY GENERATED (MWt)... 2736789 11904277 20718798 10 GROSS ELECTRICAL ENERGY GENERATED (MWH)..... 930500 4054530 7046760
11. NET ELECTRICAL ENERGY GENERATED (MWH)...... 887494 3829662 6621154
12. REACTOR SERVICE FACTOR..................... 100% 76.3% 78.1%
13. REACTOR AVAILABILITY FACTOR................ 100% 76.3% 78.1%
14. UNIT SERVICE FACTOR........................,, 100% 74.8% 76.0%
15. UNIT AVAILABILITY FACTOR................... 100% 74.8% 76.0%
16. UNIT CAPACITY FACTOR (Using MDC)........... 98.6% 70.5% 71.2%
17. UNIT CAPACITY FACTOR (Using Design MWe)... 98.6% 70.5%- 71.2%
18. UNIT FORCED OUTAGE RATE.................... 0% '4.5% 7.5%
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,.DATE, AND DURATION OF EACH): ,

Scheduled 55 day outage to begin August 4, 1989 for Refueling. l

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i

1 i

l

')

__._______u_______

e e v c 9 6 i n 8 8 t e 9 7 cor 1 t 7 et r n - r u e 2 rnc 9

9 6 K 7 9

ooe I y

CiR /

4 t

- l 2

& ct T 7(

/

0 u P. An N E 3F 1 -

5 1 JA5 e e 3 O s v 3 8 ME u e

.EEYE C a

P r 8 9

9 1 HA4 OMTBN 1

A

- C A

LE T HG NAA O .

5 3 NDDH D 0 0 TTA T EP O 8 8 ASP ET TE t I KI EL n R E E CN LE g E E E OU PT ne P E E D M od I I O po G 5 C mC N o I C T R

O .n g -

P m

g t e E

R S

mi at

.rs mci aS x sd I r E S yo H cc SC n N T Sif o O t o i I G l l a et T

C e #

N I

aam d uuot aue

. gcr U e R onnt ntdh D st t nnr U h aauouet E D tMMACORO R e eeo e - - - - - -

n cvp S M1 234 59 R u iE e N E J L R O W I T _

O _

P i C _

H U D T D N N 3 E A O r R _

M f o n S ogt R N T nc E o _

R i _

W O di a ot e W t O P O a D ht R P n _

T E t u i O R eh n R H MS w o O m -

a S x D S E T N I W ) e )

N O n s n U 2 D i n n T a e i

a o U l c l s H p ni p a S x oL x e E i E R T ( t t& (

I s c N ee ig r U rT rn o n) u ti r) os O l r snern i r N i o t u eivEi ao a Rai a E F e rtl l rH R c yTaap u( E t ngr rnx D V nanort oE enit osi(

E mel atit R  : pt el anar 1 E ninuurire e H ouif gemeh p T s q a e e pd pt y

T aEMRROAOO e - - - - - - - -

RABCDEFGH e d t

a e l

D d u ed ce rh oc o

FS N  : :

FS Ll l

ATTACHMENT I ST.HL AE J/ 7/

PACE T OF_ f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE July 6, 1989 COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1242 17 1216 2 1229 18 1239 3 1242 19 1241 4 1236 20 1238 5 1237 21 1233 6 1233 22 1223 7 1240 23 1106 8 1240 24 1242 9 1242 25 1244 10 1240 26 1250 11 1239 25 1244 12 1239 28 1228 _

13 1239 29 1244 14 1235 30 1235 15 1247 31 N/A 16 1219 L__________.--_____-.----------- ---

~

ATTACHMENT I

. ST HL.AE 7/ '//

n. _

PAAF 6 M.. 8 PORVs and Safety Valves Summary No PORVs or Safety Valves were challenged during this reporting period.

l l

l l

l l

l i

l l

- - _ _ - _ _ _ _ _ _ _ - - _ _ _ l

ATTACHMENT 2.

. ST HL AE J/7/

PAGE_1 OF 7 SOUTH TEXAS PROJECT.

ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT JUNE 1 - 18 HOUSION LIGHTING AND POWER CO.

NRC DOCKET NO. 50-4-99 LICENSE NO. NPF-80 Prepared by: ( 8 Performance Technician Dat e .-  !

Reviewed by: C.

General Supervisor Date i Rev ewed By: ( / /N/I ndineering Manager

~

P .n. / Dite  !

Reviewed By: /V hJl up mA ~7[H k Pla'nt Supe'rintendent Date Approved By: $Mk.

' Plant Manager 7@-h

] Date

4 '

.j 1

ATTACHMENT 2 l

- ST HL AE S / 7/ )

PAGE 2 OF 7- l Monthly Summary 1

STPEGS Unit 2 began the reporting period with ongoing power-ascension testing'at the 75% plateau.

On 6/02/89 at 0354 with reactor power at approximately 75% a reactor / turbine trip o: curred while performing an operability test on the Main Turbine Steam Inlet Valves. The unit went back on line on 6/03/89 at 0324 and continued testing at the-75% plateau.

After successfully com11eting power ascension testing at the-75% and 90% nawer levels, the unit began t'esting at the 100% power plateau level o_. 6/10/89.

A Notification of Unusual Event (NOUE) was declared on 6/11/89 at 1618 when Solid State Protection System Train "A" Load Sequencer failed to get proper indication of a Safety Injection signal._ "A 1708 the sequencer was declared operable and the NOUE was exitt..

On 6/15/09 at 1843 the 100 Hour Nuclear Steam Supply System acceptance test was completed. The unit successfully performed _the Reactor Trip Test at the 100% Power Plateau on 6/16/89 at 1002 and was returned to service on 6/17/89 at 1909.

South Texas Project Uvit 2 was officially declared to be in commercial operation on 6/19/89 at 0001, i

1

-____________________:_____________ _ s

~

ATTACHMENT 2--

. ST.HL.AE 3 / 21 PAGE 3 OF 2

~

OPERATING DATA REPORT DOCKET NO. 50-499 UNIT 2 DATE June 22, 1989 COMPLETED BY A.P. , Kent TELEPHONE 512-972-7786 OPERATING STATUS

1. REPORTING PERIOD: 06/01-06/18 GROSS HOURS IN REPORTING PERIOD: '432
2. CUi"AFNTLY AUTHORIZED POWER LEVEL (MWt):___3800 MAX. DEPEND. CAPACITY (MUe-Net): 1250.6 r? SIGN ELECTRICAL RATING (MWe-Net):1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None
4. RZASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL...... 392.9 1023.6- 1023.6
6. REACT 0n RESERVE SHUTDOWN HOURS.............. 0 0 0
7. HOURS GENERATOR OF LINE................... 375.4 877.2 877.2
8. UNIT RESERVE SHUTDOWN HOURS................ 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWt)...... 1200981 1933387 1933387
10. GROSS ELECTRICAL ENERGY GENERATED (MWH).... 402930 603680 60368,0_
11. NET ELECTRICAL ENERGY GENERATED (MWH). ... 386280- 552408 552408
12. REACTOR SERVICE FACTOR..................... N/A N/A N/A-
13. REACTOR AVAILABILITY FACTOR................ N/A N/A N/A
14. UNIT SERVICE FACT 0R............... ........ N/A N/A N/A
15. UNIT AVAILABILITY FACTOR................... N/A N/A N/A
16. UNIT CAPACITY FACTOR (Using MDC)........... N/A N/A N/A
17. UNIT CAPACITY FACTOR (Using Design MWe)...> N/A: N/A N/A_
18. UNIT FORCED OUTAGE RATE.................... N/A N/A N/A
19. SHUTDOWNS SCHER,ED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Scheduled 14 Jay outr.ge to begin November 4, 1989 for Bottom Mounted Instrumentation Inspection.

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 03/10/89 03/12/89 INITIAL ELECTRICITY 04/11/89 04/11/89 COMMERCIAL OPERATION 06/30/89 06/19/89

'l ATTACHMENT 2

. ST HL AE- 9/2/

PAcy 44f_.7 AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NO. 50-499 UNIT 2 DATE June 22, 1989 ]

COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 MONTH June 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PUdER LEVEL (MWe-Net) (MWe-Net) 1 900 17 0 2 108 18 878 3 502 19 W/A i 4 843 20 __

N/A 5 837 21 N/A 6 925 22 N/A 7 941 23 N/A 8 1105 24 N/A 9 1126 25 N/A 10 1216 26 N/A 11 1149 27 N/A 12 1269 28 N/A 13 1265 29 N/A  ;

i 14 1268 30 N/A 15 1267 31 N/A ';

16 500

t 7 et r r - ul sh uuh nah

,n - r u t eTaet eqawk owtl 2 e2 rnc l VT t ef ci l 9 2 K7 ooe ein .f ar h uthdi 9 9 CiR nhit you act i cnw 4 e . - t i wa et ql t sst a

- nP2 & ct b - Ml i eeadi oi e 0 u . 1 A n rd nl sd rnwd pwd r'.

5 2 JA5 e e uegIi ua uas e se ud s v T rn b and nd cd e 3 u e /xumarrimaciesti cteti asil ae sci 8 a r 9 EEYE C P R cre ee s onmmompov 1 OMTBN cot ph a rei el i e re -

NAA O of SOT wpml rcl rpr 5 NDDH -

0 T EP 8 ET TE t KI EL n E CN LE g E OU PT ne S E D M od I I O po Z 5 C mC o

C m

a m

g . r t e mc aS sd B r S yo S c c N SC Si O t I l l a T

C e # 6 d

aam uuo U e 1 onnt D st t 0 h a a u E nnr -

t MMA R e e eo 9 e - - -

n c vp 8 M1 2 3 R u iE e -

E J L R 2 W

O P

H D T N N 3 A O r M f o S ogt N T nc W R di a O O ot e 3 D P ht R T E u U R nh MS w n

H _

S o D

T I )

N 2 n U n i o a l

s F p a x e E

_ R ( t s

_ e e n) rT os u i r l r t u 5 i o

_ a o a rH 3 F e u(

D 2 c t ngr nanort enit os mel at

_ I

pt el ana e ninuurire p

y F ouif s qa e ce T aEf-REOA t

r RAB CDEF e

2 0

_ t 6 d

a 0 e

_ l D

9 d u

_ 8 ed ce rh 9 oc

_ . 0 FS o

N 9  :

FS:

8

- t 7 et r o1 l n - r u L . P%

2 e2 rnc t u 9

9 4

2 K7 e .

9 ooe CiR t

d aa e

mt t e

d0 e1 m

0

_ 0

- nP2 u -.1

& ct A n r s a oel rm oo e

- 52 Jl 5 e f TP f r 3 s v r rf 3 8 u e e gr e 8 9

. a r P ne P p 9 1 EEYE C P i w i 1 OMTEN wo r - A NAi t NDDH O SP T 5 3 0 0 T EP 8 8 ET TE t n

KI EL E E'

_ CN LE g A E E OU PT ne / A E E D M od /

O po N N I

5 I

_ C mC o

C g

.n mi

- at m . rs g

m ci t e ,

A a S x sd '. / r E S yo N SC c c n N S if o O t I

T  :

l l a aa m . gc r oet i C e # d uu ot a ue U e o nn t nt dh D st t h aa uouet E e nnr A A t MM ACORO R e e o / / e - - - -

n c vp N M1 2 3 4 R u iE e h 5 9 E J L R W

O P H D T N N 3 A O r M f o n S ogt N T nc o R i W di a 5 t O O ot e a D P ht R 1 T E t u i n

U R eh n H MS w m o a S x D E T

I ) e )

N 2 n s n U n i n i o a e a s B l c l B p ni p a x e oL x R E i . E

( t t & (

c s

e e i g r n) rT rn e os u t i r) i r l r i o s ne rn t u 0 eivEi ao 1 a R ai a rH 0 F e rtl l u( 3 - c yT aap D

3 t ngr rnx nanort oE enit osi(

mel at it 1

pt el anar 6 ninuurire p ouif ge meh S S s qa eepd pt y

T aEMRROAOO e - - - - - - - -

RABCDEFGH 6 6 e 1 1 d t 6 6 e a 0 0 l D 9 9 d u 8 8 ed c e rh 0 1 oc o

. 1 1 FS N 9 9  : :

8 8 FS I

> ,l :!ll ,l l!

. ATTACHMENT 2. .;

. ST-HL AE- 3/ 21  ;

PAGE ? 0F 7 l

)

PORVs and Safety Valves Summary l No PORVs or Safety Valves were challenged during this reporting )

period.

l

\

l I

l i

l _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _

' ATTACHMENT J

. ST.HL-AE 3 / 2/

PAGE I OF 6 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT JUNE 19 - 30 HOUSTON LIGHTING AND POWER CO.

NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Prepared by: M 7 5/87 Performance Technician ' D' ate Reviewed by: ~7/G/3't General Supervisor Date Revi wed By: '

~///d /

P jngineeriry; Manager 'Da't e Reviewed By: /\ O , ,_ 7[h D Plant Supkrintenden'II Date' Approved By: h 'kD -@

klant Manager M Date'

ATTACHMENT 3

. ST-HL AE 3/ 7 /

PAGE 2.OF 6 Monthly Summary South Texas Project Unit 2 was of ficially declared to be in commercial operation on 6/19/89 at 0001. Reactor power was reduced to approximately 90% on 6/30/89 for 5.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> to perform surveillance testing.

The report ,'eriod concluded with the unit at 100% reactor power.

! ATTACHMENT 3'

. . ST.HL.AE 3 / U -

ggLOF 4 OPERATING DATA REPORT DOCKET NO. 50-499 UNIT 2 DATE July 3, 1989 COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 OPERATING STATUS

1. REPORTING PERIOD: 06/19-06/30- GROSS HOURS IN REPORTING PERIOD: 288

'2. CURREN%LY AUTHORIZED POWER-LEVEL (MWt): 3800 MAX. DEFEND. CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net):1250.6

3. POWER LEVEL TO WHICH RESTRICTED.(IF ANY)(MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A 1

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL....... 288 288 288
6. REACTOR RESERVE SHUTD&VN HOURS............. 0 0 0
7. HOURS GENERATOR ON LINE.................... 288 288- 288
8. UNIT RESERVE SHUTDOWN HOURS................ 0 0 0 l 9. GROSS THERMAL ENE3GY GENERATED (MWt)....... 1094.991 1094991 1094991
10. GROSS ELECTRICAL ENERGY GENERATED (MWH).... 375210 375210 375210
11. NET ELECTRICAL ENERGY GENERATED (MWH)..... 358865 358865 358865' '
12. REACTOR SERVICE FACTOR..................... 100%' 100% 100%-
13. REACTOR AVAILABILITY FACTOR................ 100% 100% 100%
14. UNIT SERVICE FACT 0R........................ 100% 100% 100%
15. UNIT AVAILABILITY FACTOR................... 100% 100% 100%
16. UNIT CAPACITY FACTOR (Using MDC)...-.......

{

99.6% 99.6% 99.6%

17. UNIT CAPACITY FACTOR (Using Design MWe).... 99.6% 99.6% 99.6% 1
18. UNIT FORCED OUTAGE RATE........ 0%- 0% 0%
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS.(TYPE, DATE, AND DURATION OF EACH) -

Scheduled 14 day outage to begin November 4, 1989 for Bottom Mounted Instrumentation Inspection.

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i

l

ATTACHMENT # T

. ST-HL AE 3/7/

PAGE 4 OF (

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-499 UNIT 2 _

DATE July 3', 1989 COMPLETED BY A.P. Kent-TELEPHONE 512-972-7786 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE. DAILY POWER LEVEL (MWe-Net) -(MWe-Net) 1 N/A 17 N/A 2 N/A 18 N/A 3 N/A 19 1248 4 N/A 20 1242 5 N/A 21 1241 l

6 N/A :22 1241 7 N/A 23 1244 -

8 N/A 24 1250 9 N/A 25 1243 10 N/A 26 1246 11 N/A 27 1254 1 t'

12 N/A 28 1254 i

j 13 N/A 29 1253 1

14 N/A 30 1236 -i 15 N/A 31 N/A 16 N/A ,

l L

1 t7 et r

' n - r u

,e2 rnc 9 3K7 ooe 9 CiR 4 y .9- t

- l P2 & ct 0 u . 1 A n .

52JA5 e e '

3 s v 3 8 u e 8 9 a r 9 1 EEYE C P 1 -

OMTBN - A NAA O .

5 3 NDDH D 0 0 T EP O 8 8 ET TE t I KI EL n R E E CN LE g E E E OU ET ne P E E D . M od I I O po G 5 C mC N o I C T -

R g O . n P m i E a t m R . r s g

t e S mc aS i

x sd I r E S yo H cc n N SC T .Sit fo o O i I G l l a et T N  : a am . gcr C e # I d uuo t aue U e R onnt nt dh D st t U h aa u ouet E nnr D t MMA CORO R e e e o e - - - - - -

n cvp S M1 23 4 59 R u iE e N E J L R O W I O T P C H U D T D N N 3 E A O r R M f o n S ogt R o N T nc d i W R di a W t O O ot e O a D P ht R P n T E t u i U R eh n R m H MS w O a S o x D S E T N -

I W ) e )

N O n s n U 2 D i n i n T a e a o U l . c l s H p ni p a S x oL x e E i E R T ( t t& (

I s c N ee i g r U rT rn o n) u ti r) os O l r snern ir N i o ei vEi t u ao a R ai a

'E F e rt l l rH R c yT aap u( E t ngr rnx D W nanort oE enit osi(

E mel at i t R  : pt el anar E

1 ninuurire e

H p

ouif g e meh y

T s qae e pd pt aEMRROA OO T e - - - - - - - -

RABCDEF GH e

t a

D d

l e

d u ed c e rh oc FS o

N  : :

FS l! r

ATTACHMENT 3

- ST-HL AE 3 /2/

. PAGE ( OF6 Pf3Vs and Safety Valves Summary 1

No PORVs or Safety Valves were challenged during this reporting l

l 4

i l

1 W-