SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT AUGUST 19%
HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Resiewed By:
_ Y'YLt h
D.MTBERGEND HL Dat/
Approved By:
9[f[1/
G.L. PARKEY U
bate 9609180362 960910 PDR ADOCK 05000498 R
MONTIILY
SUMMARY
STPEGS Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
J
OPERATING DATA REPORT 4
DOCKETNO.30-498 UNIT.1 DATE Sep.5.1996 COMPLETED BY R.L. Hill TELEPHONE 112 972-7667 OPERATING STATUS 1.
REPORTING PERIOD: 8/1/96-8/31/96 GROSS HOURS IN REPORTING PERIOD; 7.44 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mut): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Ngog 4.
REASONS FOR RESTRICTION (IF ANY): N/A j
THIS MONT11 YR TO DATE CUMULATIVE i
5.
NUMBER OFIIOURS REACTOR CRITICAL 744.0 5.313.2 46,950J 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
7.
HOURS GENERATOR ON LINE 744.0 LL86.J 45.625.3 8.
UNIT RESERVE SHUTDOWN HOURS Q
0 0
l 9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.839.848 19.900.464 168.056.799
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 972.900 6.835.340 57.217.010
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 930.710 6.542.060 54.354.780
- 12. REACTOR SERVICE FACTOR 100.0 %
90.7 %
6 8_%
1
- 13. REACTOR AVAILABILITY FACTOR 100.0 %
90.7 %
66.8 %
- 14. UNIT SERVICE FACTOR 100.0 %
90.3 %
64.9 %
- 15. UNIT AVAILABILITY FAC'IDR 100,0 %
90,3%
64.9 %
- 16. UNIT CAPACITY FACTOR (Using MDC) 100.0 %
89.3 %
61.8%
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 100.0 %
8_9J%
618_%
- 18. UNIT FORCED OUTAGE RATE OpQ%
0.0%
24 Q%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-498' UNIT 1 DATE Sco. 5.19%
COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 MONTH AUGUST -
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net)
(MWe-Net) 1 1211 17 1251 2
1243 18 1250 3
1248 19 1242 4
1212 20 1251 5
1111 21 1211 6
1248 22 1215 7
1248 23 1250 8
1211 24 12 9 1248 25 1212 10 12}} 26 1252 11 1252 27 1212 12 1253 28 1216 13 1248 29 1252 14 1252 30 1232 15 1210 31 1252 16 1247
f l UNIT SHUTDOWNS AND POWER REDUCTIONS l DOCKETNO. 50-498 UNIT 1 DATE Sco.5.1996 COMPLETED BY R.L Hill TELEPHONE 512 972-7667 REPORTMONTH AUGUST 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prewnt Recurrence (Hours) Shutting Event Code Code Down Report # Reactor THERE WERE NO UNIT SHlITDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other [ H-Other (Explain)
PORVS AND SAFETY VALVE
SUMMARY
nere were no PORV or Safety Valves challenged during the reposting period.
4 il SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 4 UNIT 2 MONT11LY OPERATING REPORT AUGUST 1996 f HOUSTON LIGHTING AND POWER CO. NRC DOCKET NO. 50-499 LICENSE NO. NPF40 i Reviewed By: 90 de/f a D.M' OrpNDAf8,~ ' ' Ddte i N N Approved By: R.F/ MASSE Date m- ~
MONTIILY
SUMMARY
STPEGS Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions. l l 1 l l
OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Seo. 5.19% COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 OPERATING STATUS 1. REPORTING PERIOD: 8/1/%-8/31/96 GROSS HOURS IN REPORTING PERIOD: 244 2. CURRENTLY AUTHORIZED FOWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): N_on_g 4. REASONS FOR RESTRICTION (IF ANY) N/A THIS MONTH YR TO DATE CUMULATIVE 5. NUMBER OF HOURS REACTOR CRITICAL 744.0 5.524.7 43.625.4 6. REACTOR RESERVE SIIUTDOWN HOURS 0 0 0 l 7. IIOURS GENERATOR ON LINE 744.0 5.445 0 42.263.5 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0 9. GROSS THERMAL ENERGY GENERATED (MWH) 2.839 665 20.666.490 155f41.167
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 970.700 2,086.600 52.914.981
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 928,750 6.782.560 50.431.906
- 12. REACTOR SERVICE FACTOR 100.0 %
24 4 % 62J% i
- 13. REACTOR AVAILABILITY FACTOR 100.0 %
94.4 % 6JLi%
- 14. UNIT SERVICE FACTOR 100,0 %
23p0% 66.9 %
- 15. UNIT AVAILABILITY FACTOR 100.0 %
93.0 % 66.9 %
- 16. UNIT CAPACITY FACTOR (Using MDC) 99.8 %
92.6 % 63.9 %
- 17. UNIT CAPACITY FACTOR (Using Design MWe) 99.8 %
22 6 % 63fA i
- 18. UNIT FORCED OUTAGE RATE 0.0%
10% 23 4 %
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE _Seo. 5.19% COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 MONTH AUGUST DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 12J2 17 1248 2 2 1244 18 1244 3 1218 19 1212 4 1244 20 1245 5 124g 21 1212 6 1248 22 1248 7 1248 23 1251 8 1248 24 - 1211 9 1241 25 1211 10 1248 26 1251 l 11 1213 27 1211 12 1248 28 1247 13 1244 29 1248 14 124g 30 1252 15 1248 31 1243 16 1248 1 4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-499 UNIT 2 DATE Sco.5.1996 COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 REPORTMONTH AUGUST 1 2 3 4 5 No. Date Type Duration Reason Method of Licensec System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report # Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD t l 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
4 i PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves cnallenged during the reporting period. i l l i}}