SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT AUGUST 19%

HOUSTON LIGHTING AND POWER CO.

NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 l

Resiewed By: _ Y'YLt D.MTBERGEND HL h

Dat/

Approved By:

U 9[f[1/

G.L. PARKEY bate 9609180362 960910 PDR ADOCK 05000498 R PDR

MONTIILY

SUMMARY

STPEGS Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

J

OPERATING DATA REPORT 4

DOCKETNO.30-498 UNIT .1

. DATE Sep.5.1996 COMPLETED BY R.L. Hill

, TELEPHONE 112 972-7667

OPERATING STATUS
1. REPORTING PERIOD: 8/1/96-8/31/96 GROSS HOURS IN REPORTING PERIOD; 7.44_

I

2. CURRENTLY AUTHORIZED POWER LEVEL (Mut): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6

. DESIGN ELECTRICAL RATING (MWe-Net): 1250.6

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Ngog
4. REASONS FOR RESTRICTION (IF ANY): N/A j THIS MONT11 YR TO DATE CUMULATIVE i
5. NUMBER OFIIOURS REACTOR CRITICAL 744.0 5.313.2 46,950J
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 744.0 LL86.J 45.625.3
8. UNIT RESERVE SHUTDOWN HOURS Q 0 0 l
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.839.848 19.900.464 168.056.799
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 972.900 6.835.340 57.217.010
11. NET ELECTRICAL ENERGY GENERATED (MWH) 930.710 6.542.060 54.354.780
12. REACTOR SERVICE FACTOR 100.0 % 90.7 % 1 6 8_%
13. REACTOR AVAILABILITY FACTOR 100.0 % 90.7 % 66.8 %
14. UNIT SERVICE FACTOR 100.0 % 90.3 % 64.9 %
15. UNIT AVAILABILITY FAC'IDR , 100,0 % 90,3% 64.9 %
16. UNIT CAPACITY FACTOR (Using MDC) 100.0 % 89.3 % 61.8%
17. UNIT CAPACITY FACTOR (Using Design MWe) 100.0 % 8_9J% 618_%
18. UNIT FORCED OUTAGE RATE OpQ% 0.0% 24 Q%
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

N/A

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-498' UNIT 1 DATE Sco. 5.19%

COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 MONTH AUGUST -

DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1211 17 1251 2 1243 18 1250 3 1248 19 1242 4 1212 20 1251 5 1111 21 1211 6 1248 22 1215 7 1248 23 1250 8 1211 24 12 9 1248 25 1212 10 12}} 26 1252 11 1252 27 1212 12 1253 28 1216 13 1248 29 1252 14 1252 30 1232 15 1210 31 1252 16 1247

f l - . UNIT SHUTDOWNS AND POWER REDUCTIONS l DOCKETNO. 50-498 - UNIT 1 DATE Sco.5.1996 COMPLETED BY R.L Hill TELEPHONE 512 972-7667 REPORTMONTH AUGUST 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prewnt Recurrence (Hours) Shutting Event Code Code Down Report # Reactor THERE WERE NO UNIT SHlITDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

nere were no PORV or Safety Valves challenged during the reposting period.

4 il SOUTH TEXAS PROJECT l ELECTRIC GENERATING STATION 4 UNIT 2 MONT11LY OPERATING REPORT AUGUST 1996 HOUSTON LIGHTING AND POWER CO. f NRC DOCKET NO. 50-499 LICENSE NO. NPF40 i Reviewed By: 90 de/f a D.M' OrpNDAf8,~ ' ' Ddte i Approved By: N N Date R.F/ MASSE

                                           .,                            ,.                -           ~

MONTIILY

SUMMARY

STPEGS Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions. l l l l 1 l l l

I I

           .            .                                                                                             l OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Seo. 5.19%

COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 OPERATING STATUS

1. REPORTING PERIOD: 8/1/%-8/31/96 GROSS HOURS IN REPORTING PERIOD: 244
2. CURRENTLY AUTHORIZED FOWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): N_on_g
4. REASONS FOR RESTRICTION (IF ANY) N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 744.0 5.524.7 43.625.4
6. REACTOR RESERVE SIIUTDOWN HOURS 0 0 0 l
7. IIOURS GENERATOR ON LINE 744.0 5.445 0 42.263.5
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.839 665 20.666.490 155f41.167
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 970.700 2,086.600 52.914.981
11. NET ELECTRICAL ENERGY GENERATED (MWH) 928,750 6.782.560 50.431.906
12. REACTOR SERVICE FACTOR 100.0 % 24 4 %

_ 62J% i

13. REACTOR AVAILABILITY FACTOR 100.0 % 94.4 % 6JLi%
14. UNIT SERVICE FACTOR 100,0 % 23p0% 66.9 %
15. UNIT AVAILABILITY FACTOR 100.0 % 93.0 % 66.9 %
16. UNIT CAPACITY FACTOR (Using MDC) 99.8 % 92.6 % 63.9 %
17. UNIT CAPACITY FACTOR (Using Design MWe) 99.8 % 22 6 % 63fA l i
18. UNIT FORCED OUTAGE RATE 0.0% 10% 23 4 %
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

N/A

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE _Seo. 5.19% COMPLETED BY R.L. Hill ' TELEPHONE 512 972-7667 MONTH AUGUST DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 2 12J2 17 1248 2 1244 18 1244 3 1218 19 1212 I 4 1244 20 1245 5 124g_ 21 1212 6 1248 22 1248 7 1248 23 1251 8 1248 24 - 1211 9 1241 25 1211 10 1248 26 1251 l l 11 1213 27 1211 , l 12 1248 28 1247 13 1244 29 1248 14 124g 30 1252 15 1248 31 1243 16 1248 1 4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-499 - UNIT 2 DATE Sco.5.1996 COMPLETED BY R.L. Hill TELEPHONE 512 972-7667 REPORTMONTH AUGUST 1 2 3 4 5 No. Date Type Duration Reason Method of Licensec System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report # Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD t l 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

4 i PORVS AND SAFETY VALVE

SUMMARY

l There were no PORV or Safety Valves cnallenged during the reporting period. i l I l l l l l l l i l l}}