ML20137X601

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2
ML20137X601
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/28/1997
From: Hill R
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20137X571 List:
References
NUDOCS 9704220093
Download: ML20137X601 (1)


Text

.

- ~.. - ~ -

1 l

OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Mar. I1.1997 COMPLETED BY R.L. Hill TELEPHONE 512 972-7667

. OPERATING STATUS 1.

REPORTING PERIOD: 2/1/97-2/28/97 GROSS HOURS IN REPORTING PERIOD: 622 2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net):.1250.6 l

DESIGN ELECTRICAL RATING (MWe-Net): 1250,6 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Norig 4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE ' CUMULATIVE I

5.

NUMBER'OF HOURS REACTOR CRITICAL 2212 1.017.9 47.572.3 L

6.1. REACTOR RESERVE SHUTDOWN HOURS 9

9 9

i

~

7.

HOURS GENERATOR ON LINE 239,2 2212 46.186.4 8.

UNIT RESERVE SHUTDOWN HOURS 0

0'

'Q

~

9.'

GROSS THERMAL ENERGY GENERATED (MWH) 2 11 & 1 1600.836 170.417.445

10. ' GROSS ELECTRICAL ENERGY GENERATED (MWH) 262,164 1233 454 57.982.735
11. NET ELECTRICAL ENERGY GENERATED (MWH) 24M21 1.180.521 55.287.797
12. REACTOR SERVICE FACTOR 40.8 %

71.9 %

70,5Y,

13. REACTOR AVAILABILITY FACTOR 40,8%

71,9 %

70.5 %

14. UNIT SERVICE FACTOR 37.2 %

70.2 %

68.4 %

15. UNIT AVAILABILITY FACTOR 37.2 %

70,2 %

68.4Y, L

16. UNIT CAPACITY FACTOR (Using MDC)

_22 6 %

66.7 %

65.5 %

i

17. UNIT CAPACITY FACTOR (Using Design MWe) 29.6 %

66.7 %

fil5%

18. -UNIT FORCED OUTAGE RATE 9JQ%

0.0%

11.9 %

i

19.. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)i NIA i
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A t,

9704220093 970415

{

PDR ADOCK 05000498.

i R;

FDR L,

-