Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2
ML20137X601
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/28/1997
From: Hill R
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20137X571 List:
References
NUDOCS 9704220093
Download: ML20137X601 (1)


Text

. , , . . - . - . . - - - ~ . . - ~ - . - _ . . . . . . - . . - . . _ - - . . . . _ . - . . - . . - . .

1 .

l OPERATING DATA REPORT DOCKETNO. 50-499  !

UNIT 2 DATE Mar. I1.1997 .

COMPLETED BY R.L. Hill  !

TELEPHONE 512 972-7667

. OPERATING STATUS

1. REPORTING PERIOD: 2/1/97-2/28/97 GROSS HOURS IN REPORTING PERIOD: 622
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800

,- MAXIMUM DEPENDABLE CAPACITY (MWe-Net): .1250.6 l DESIGN ELECTRICAL RATING (MWe-Net): 1250,6

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Norig
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE ' CUMULATIVE I 5. NUMBER'OF HOURS REACTOR CRITICAL 2212 1.017.9 47.572.3 L

6.1 . REACTOR RESERVE SHUTDOWN HOURS 9 9 9

~

i

7. HOURS GENERATOR ON LINE 239,2 2212 46.186.4

~

8. UNIT RESERVE SHUTDOWN HOURS 0 0' 'Q 9.' GROSS THERMAL ENERGY GENERATED (MWH) 2 11 & 1 1600.836 170.417.445
10. ' GROSS ELECTRICAL ENERGY GENERATED (MWH) 262,164 1233 454 57.982.735  ;
11. NET ELECTRICAL ENERGY GENERATED (MWH) 24M21 1.180.521 55.287.797
12. REACTOR SERVICE FACTOR 40.8 % 71.9 % 70,5Y,
13. REACTOR AVAILABILITY FACTOR 40,8% 71,9 % 70.5 %
14. UNIT SERVICE FACTOR 37.2 % 70.2 % 68.4 %
15. UNIT AVAILABILITY FACTOR 37.2 % 70,2 % 68.4Y, L 16. UNIT CAPACITY FACTOR (Using MDC) _22 6 % 66.7 % 65.5 %

i

17. UNIT CAPACITY FACTOR (Using Design MWe) 29.6 % 66.7 % fil5%
18. -UNIT FORCED OUTAGE RATE 9JQ% 0.0% 11.9 %

i 19. . SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)i

! NIA i

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A t ,

9704220093 970415

{ PDR ADOCK 05000498 .

i R; FDR L,